Jump to content
Find Professionals    Deals    Get Quotations   Portfolios

Recommended Posts

Yeah!! Finally it is time for me to write my very first reno T-Blog, had been reading T-blog for like near 1 year, and had been patiently waiting for the time for my key collection so I can start on my T-blog soon.

As per tradition, here is my 5 room Floor plan, got my keys on 3rd Jan, my reno (hacking first) will be starting on 2nd Feb. Now is the rectification period with the BSC folks. Already 2nd round, hopefully coming week can clear all the defects.

FloorPlan_zpsac6663ae.jpg

I guess it's pretty standard layout for most of the BTOs, below is the HDB suggested layout.

HDBFurnished_zps44d47aff.jpg

And this is my 2D layout, this is not the latest, there are some changes, yet to get the updated layout plan from my ID.

Because this layout plan was done before i got the keys, so after getting the keys, realize that there may be some space constraint, so waiting for the latest copy.

2dfloorplanv1_zpse8b5f07d.jpg

 

Share this post


Link to post
Share on other sites

Join 46,923 satisfied homeowners who used renotalk quotation service to find interior designers. Get an estimated quotation

I had start looking for my ID since April 2014. Had confirmed my ID on August, with the the hope that i can get keys on 4th Q 2014 despite that HDB states that my estimated key collection would be on 1st Q 2015. :bleah:

I basically send my request for quote requests to those reno website like;

www.renotalk.com.sg

www.renotalk.com

www.ilovehome.sg

Each of these website had about 3 - 4 ID called me, plus some I called due to good reviews or friend intro, I think i had a total of 16 ID. As my job is out on the road most of the time, so i am able to meet up and discuss with them.

So for those who do not know which ID to look for, can just pop a request to those reno website, and i'm sure many ID will call you to arrange a discussion.

I don't think i want to list down my experience with each ID, the reason i chose this ID is mainly because she is one of the cheaper quote, and more experienced compared to the others. Since I had met with so many IDs, so i think more or less, i have some knowledge on some renovation stuff, i even had met up with some inexperienced ID which i think i may know more than them. :notti:

Edited by HansamuQ
 

Share this post


Link to post
Share on other sites

Ok, before the reno starts on 2nd Feb let me upload the original state of the flat.

Living room - view from main door.

2015-01-24112000_zpsd93632b0.jpg

Living room - view to the bedrooms walkway

2015-01-24112820_zps3283ebbb.jpg

Living room - view from bedroom walkway.

2015-01-24111815_zps0da2e8a7.jpg

Common toilet.

2015-01-24111913_zps138bbfd2.jpg

Master toilet.

2015-01-24112736_zps3ec34cd8.jpg

Master bedroom

2015-01-24112756_zpsb23837a4.jpg

Bedroom 2.

http://i1057.photobucket.com/albums/t392/deanyeo/Reno%20in%20Progress/2015-01-24112747_zps7b2df61e.jpg

Bedroom 3.

http://i1057.photobucket.com/albums/t392/deanyeo/Reno%20in%20Progress/2015-01-24112744_zpsdbdca626.jpg

Edited by HansamuQ
 

Share this post


Link to post
Share on other sites

Like most of the people here. Before I have got my keys, I had already bought some of the stuff.

Serta mattress

BC209B8A-95B5-4710-B9CA-AB08E3314F2B.png

L-shape sofa - After getting keys, found out that the sofa seems to be a bit too long. But my "SHE".F.O really like it. So hopefully won't be too out of the way.

50BB3712-205E-4DAC-B4A2-FDD44CB136E7_zps

Dining Table - I quite like this dining table, but my ID saw it and she says not really match the color theme. So my "SHE".F.O decided to change it. So still sourcing for a suitable dining table, or maybe ask my ID to fabricate for me.

819F6E2D-4D25-4D97-B976-1A1940448C4E_zps

 

Share this post


Link to post
Share on other sites

And so far. These are my wish list for home appliances. Any one currently using these? Any reviews??

Side by side fridge

C970317F-BB36-479E-8D91-30967F15835B.png

Washer cum dryer

05DDD0FE-2440-4466-8496-0745718A69C8.png

Hob and Hood

A02096BD-1475-47FA-8967-0B41954DD47F.png

Built in oven.

BC32B052-BF08-45A7-A2E5-CDD3F7DDE3A7.png

 

Share this post


Link to post
Share on other sites

Nice! Definitely will be following your blog! I would love to see how your MBR turns out with the WIW as I am also having similar idea for my future MBR. Changing your entrance of your kitchen is a lot more efficient than the original design! I love your sofa too!

 

Share this post


Link to post
Share on other sites

Hi, nice sofa! I like that it has a small side to put cups? Can i find out where did u get it? N if possible, how much it was? Thanks a lot!

Hi Suikoden, Yes, it can put cups. And can open up to store stuff, there is a USB charger in there too.. :sport-smiley-018:

I got it from Expo show from Novena, they say is Expo price @ $2400 for full leather, but only with this side and color. Cannot choose. Last i seen they still has it in Defu lane and Sungei Kaduk. And forgot to mention, it is electric recliner at the right side.

Nice! Definitely will be following your blog! I would love to see how your MBR turns out with the WIW as I am also having similar idea for my future MBR. Changing your entrance of your kitchen is a lot more efficient than the original design! I love your sofa too!

Thanks!! Will be updating some stuff soon. Just started hacking.

Edited by HansamuQ
 

Share this post


Link to post
Share on other sites

Monday is the first day of my reno. But can only proceed with hacking of kitchen floor cause my hacking walls permit still pending. Hope does not requires PE.

Kitchen hack till clean clean. Debris removed ready for tiling after the wall is hacked.

F2AC6750-0DDD-42FB-B90D-16097BDAAF31_zps

Tiles that i had chosen.

Living Room:

2015-01-05152820_zpsdfef3422.jpg

Bedrooms:

2014-09-14122104_zpsc0a07282.jpg

Kitchen:

2014-12-30165615HDR_zps9864ba74.jpg

Toliet overlay mock up from hafary

Master Bathroom:

2015-01-24124942_zps9aa68b03.jpg

Common Bathroom one side of the wall

2015-01-29085717_zpscf1008a3.jpg

 

Share this post


Link to post
Share on other sites

Last check on HDB website, hacking of kitchen wall still pending for approval. let's show some 3D. My ID had not given me the full sets, only partial. hopefully by next week she can provide me with the rest of the 3D pictures. There have been a change of the layout after viewing the actual size of the flat.

The Color laminate not really what i want, have to change. Will update it once all are finalized.

Dining Area

2015-03-15%2019.13.20_zpssoqsvfag.jpg

View from dining to the cosy area, Living is at the opposite.

2015-01-30125311_zpsc146446b.jpg

Conceal Study

2015-02-24%2015.49.46_zpsi5rpkzds.jpg

Kitchen

2015-03-15%2019.13.19_zpsvbbtid7p.jpg

Master bedroom:

combine_images_zpsucxzwchd.jpg

Edited by HansamuQ
 

Share this post


Link to post
Share on other sites

Happy new year to all!!!

It has been a while since i'm updating due to waiting for the hacking permit and CNY.

The wall hacking permit was only approved just before CNY, so have to wait till last week before any job are carry out.

So, last week my kitchen wall was hacked, at first my ID still worry that the wall needs to hack full because of the support, but lucky, i can hack half wall despite that the left and right support are also being hacked.

You can see below that the right side of the wall which is the old entrance is hacked away, and the new entrance will be opened on the left. So left with this wall standing in the middle.

6D88059B-77FD-44CD-822B-5B7115BEEBB1_zps

And just yesterday, the electrical wiring was done, not all though cause i yet to buy the audio surround speakers, so they will continue the cables on coming thursday.

 

Share this post


Link to post
Share on other sites

Today supposed to do the tiling but due to some of the electrical wiring was not done yet, so the uncle can only plaster the cement on the overlay area.

For overlay, usually only toilet and kitchen they can plaster the cement.

Plumper had removed all the WC and basins

Master toilet Left side

972BF519-7030-4265-95ED-0C70512F0003_zps

Master toilet right side (ID will use tiles to do the shampoo stand along the side of the wall.)

6AE5286A-AFC3-405B-B01F-7575CBA914A0_zps

Common Toilet, (Same thing, ID will use tiles to do the shampoo stand along the side of the wall)

DB12E2A6-6BD3-4412-890E-372EC46495BA_zps

This Thursday will continue the electrical wiring and aircon pipe installation.

I got my aircon from a contact in renotalk. And the details as below.

Upgrade to Armaflex 1/2 Inch Insulation/ G22 Copper pipe/ 16mm Drainage pipe

The main reason sign up, mainly is also because of the free gift. hehe.

Sharp EC-S2141S-S Powerful Cyclone Vacuum Cleaner (With Plasmacluster ION generator kill bacteria while cleaning floor)

Bedrooms: $3100 (Discount $88 or free aircon stainless steel stand)

Starmex 30K Outdoor unit.

2 x 9K Fancoil

1 x 12K Fancoil

Living Room: $2780

Starmex 30K Outdoor Unit

1 x 24K Fancoil

1 x 12K Fancoil

 

Share this post


Link to post
Share on other sites

Hi - love the look and feel of your home - is this AB coz i'm from there too :)

Have you receive the subway tiles ok? I might consider getting from TB - may I ask which forwarder or agent you used? Is the shipping expensive?

 

Share this post


Link to post
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
Sign in to follow this  

×