Jump to content
Find Professionals    Deals    Get Quotations   Portfolios

Leaderboard


Popular Content

Showing content with the highest reputation on 10/30/2017 in all areas

  1. 1 point
    1. Mine was built by the developer. As the height of the counter top was 1m+ and the top cabinets were taller as a result, plus those cabinet legs that I didn't prefer, I opted to demolish and rebuilt new cabinet and at the same time, add the concrete base. 2. No I did not do any technical stuff. My carpenters did the measuring and leveling etc. Yes, I believe they built a frame that was mounted to back wall and also resting it's weight on the concrete base.
  2. 1 point
    Blog Entry Date: 29th October 2017 Sunday Click Here to go back to Page 1 - Table of Contents End of 6th week after Key Collection. Lightings still being worked on, Bathroom Door is Replaced. End of the 6th week, and I thought i'd report whats happened so far with my Lightings. Jason sent someone up to rectify some of the switches issues, and while they aren't sunken in or misaligned anymore, i'm still not satisfied with the overall results considering Living Room Cove light sometimes still trips the Electrical MCB, and one Bedroom light still not replaced. Jason advised he will continue to get his guys rectify the lightings because there are also lightings to be added during Carpentry stage, and by Handover, will have everything done up right. I certainly hope so. Nevertheless, I thought I might as well show how my lights look like. Before, this was how bad the switch was, all sunken in. Unacceptable. Now, the switches are somewhat better although still not very good. I suspect they will remain like this even after Handover...We shall see. --------------------------------------------- Showing all my Installed Lightings Entryway Light (Nothing fancy about this one. Just a simple light i'll turn on when I come back home.) Kitchen Light (I had my reservations about this one. At first I wanted something standard and squarish but somehow this one appeals to me more.) Bombshelter / Walk-In Wardrobe Light (2 types of Tracklight. White one i'm using for Bombshelter / Walk-In Wardrobe, Black one will be for my Bedroom.) Bathroom Light (Decided to go traditionally squarish and boxy for this one) Living Room (Cove Light Only) (This is the actual colour of the Cove Light. Its a very pleasing soothing colour. The other pictures show the light abit haywire colour due to my phone camera settings i think.) Living Room (Cove Light + Cool White Downlight) (I like the Cool White Downlight, it looks very fresh and light) Living Room (Cove Light + Warm White Downlight) (Sorry it turned out so yellowy. Its not this yellowish in real life.) Living Room (Cove Light + Daylight Downlight) (Cool White and Daylight difference is very subtle. Cool White is very white, Daylight is somewhat muted) Bedroom (Cool White Downlight) (The faulty downlight hasn't been replaced yet.) Bedroom (Warm White Tracklight) (Really like how this looks, very modern and classy. I will use each spotlight to highlight different areas, like my wall calligraphy, japanese sword later.) --------------------------------------------- In addition to my lightings, my new Bathroom PD Door has also been replaced. Compared to the original HDB bathroom door, the new one looks so much better. It fits my apartment's black and white theme much better too. Here is an image of when HDB Bathroom Door was hacked away back in Week 2. (I am so sorry I didn't take any pictures of HDB's original Bathroom Door.) And here is the newly replaced Bathroom PD-Door (I originally wanted to choose something plain and simple, but in the end chose an asymmetrical door design. I'm happy with the design I chose, and really like how it fits in nicely with the rest of the decor. FYI, Hacking of Bathroom Door, Replacement of new PD-Door is all included in my Renovation Quotation.) Exterior View of the PD-Door Interior View of the PD-Door Some Close Up Look of the PD-Door Locking Mechanism and Hinges Really love how the PD-Door manages to fit in nicely with the Dark Bathroom Theme and layers nicely with the camouflaged Black Air-Con trunking And so thats it for my End of 6th Week Report. We're now in the final stretch of my Renovation! I understand from Jason that my Carpentry Works are gonna come up Next Week Friday (3rd Nov 2017) I can't wait to see how it all happens, so do tune in for that! As always, thanks for visiting and i'll see you soon in my next Blog Entry!! Click Here for the Next Blog Entry: End of 7th week after Key Collection. Carpentry Works - Part 1 / 3 Click Here to go back to Page 1 - Table of Contents
This leaderboard is set to Singapore/GMT+08:00
  • advertisement_alt
  • advertisement_alt
  • advertisement_alt
Aura Sink download renotalk renovation guide


×