Jump to content
Find Professionals    Deals    Get Quotations   Portfolios

Leaderboard


Popular Content

Showing content with the highest reputation on 03/24/2020 in all areas

  1. 1 point
    Finally got a contractor willing to move my laundry rack. My ID d not want to do it.
  2. 1 point
    13 Mar to 22 Mar – Hacking, Masonry and Piping works On 13 Mar, my renovation officially starts. The wall that separate my bedroom and living was hacked away to make room for my TV cabinet. The aircon piping done and toilet door sealed up. 50mm kitchen cabinet plinth and shower kerb done too. One bad news is, my ID told me that my project will be delayed due to the current situation (COVID-19 + Malaysia lockdown). As their carpenters are all Malaysian and their carpentry work are all done in Malaysia before they bring it out to install. Currently there’s only 14 carpenters are here to support 60-ish IDs and their projects. Will have to see how things goes and plan along the way. ? Before / After Wall between my room and living room hacked and the toilet entrance from my bedroom sealed. Aircon piping position for living room and bedroom. I have decided to group my toilet bowl and the shower together as my wet area. Shower kerb created to split them apart and tiles for toilet done. Kitchen cabinet plinth erected. Previous Topic Next Topic Back to Content Page
This leaderboard is set to Singapore/GMT+08:00
  • advertisement_alt
  • advertisement_alt
  • advertisement_alt
Aura Sink download renotalk renovation guide


×