Posts posted by ladydr


  1. I extracted the translation from google:

    [specification] A section: Diameter 26CM, B section: Diameter 12CM, C models: Diameter 25CM

    [Power] E27 lamp holder * 1, can put energy-saving lamps, incandescent bulbs, LED energy saving bulb, (products are not presented in this paragraph source)

    Suitable light source power: 51-60W

    In summary, what it means is E27 (screw on type with a power of no more than 60W).

    Take note the size is about 1 foot in diameter.

    How do you plan on installing the lights? If you do not know how to install, you have to factor in the cost of getting someone to install. This is household electricity 220V so don't attempt to change your existing lights if you are not sure. Be safe.

    thanks for the reply. I was thinking of getting electrician to change it. But I m looking for something simple one. I have posted another link but I can't seems to find the dimension the light. I hope someone will help me. :)

    thanks


  2. Some pictures from my guest bathroom

    @ Edensmom - I used the following tiles instead.

    IMG_2919_zpsb8aea315.jpg

    IMG_2918_zps80b37794.jpg

    IMG_2920_zps9ce602cd.jpg

    as u can see my vanity installation is not complete.

    IMG_2916_zps4389d378.jpg

    Vanity of my master bathroom. Waiting for solid surface top to be installed this week with installation of my basin and tap. Can't wait for it.


  3. Yes we manage to sort out the leak. It was not big issue after all.

    I didn't get that kind of tiles but I used ocean blue tile. I am going to post my bathrooms pictures soon.

    Yes I do have 2 fridge. I love cooking and I need to put my spices in fridge otherwise it gets spoiled very fast. Actually one fridge is for drinks and baby food and one fridge is for our food.


  4. After 6 weeks of staying in rental place finally we are moving back to our home. My home is not fully ready yet, but we decided to move in. There are few intermediate to minor stuffs are still need to be completed.

    Here are some the pictures.

    IMG_2902_zps1f3c6716.jpg

    View of my kitchen from dinning area.

    IMG_2904_zps1ccee51d.jpg

    Kitchen floor - wooden tiles

    IMG_2875_zps739350ae.jpg

    Countertop - Ceaserstone - Raven with Matt black tiles as backsplash.

    I will soon upload picture with my blanco sink.


  5. hahaha actually is cause i can sit down to shower and just enjoy the hot shower. Can imagine? one word, SHIOK .

    Also practically can just put our shower stuff there also and reduce the need for those corner shelving units which i really don't like.

    Plus NEXT TIME GOT CHILDREN CAN LET THEM SIT THERE AND SHOWER :D A lot of excuses for a lazy man lol.

    I like your bench I idea. i am also going for it. I agree with all your reasons.. :):D


  6. I thought my renovation was going smoothly.

    Now the hiccups started and hope this will be the one and only.

    Suddenly my downstairs neighbor complained to management that there is leak in his master bedroom.

    We checked with our contractor and he said they check all the leaks before they started putting tile on the floor on friday.

    Tuesday morning my neighbor complained about leak so my contractor is puzzled.

    My hubby went to talk to neighbor but they refused to show the leak and said it has stopped so we don't have to worry. But how can we not worry, right. They just finished putting tiles and you are telling me there is leak and when we want to check you are not letting us see.

    Anyway my contract today called the neighbor, he said same thing to him. But he still insisted on seeing it, they gave him time for tomorrow. He is going to check tomorrow. I hope it is not big issue.

    After reading some blog I am contemplating to have concrete base for my kitchen sink. I told my contractor and he gave me additional cost estimates. I discussed with my hubby and we decided to go ahead with this.

    Waiting for this week to end so my contractor can give the exact date for move in.


  7. 2 weeks into Reno and my contractor just manage to finish tiling master bathroom only.

    I feel work is slow but my contractors says they are on schedule.

    While my house is like war zone I m going out some furniture hunting.

    Last week I went to expat auction house. I loved their stuff and good price. I bid for one key holder and won it. Woohoo.

    I will post pic soon.

    If guys want some traditional/ solid wood furniture you should go. Every auction they have different furnitures and accessories.

    I will put more pics soon.


  8. The renovation for our place has officially completed! Now all that's left is to do is rectify defects, cleaning and move in the furniture..

    Some pics from the latest visit to the house

    Wide angle view of dining area

    IMG-20130506-WA0006_zpsb29f7775.jpg

    Kitchen completed

    IMG-20130506-WA0000_zps5b68fb79.jpg

    IMG-20130506-WA0003_zpsb87c361c.jpg

    IMG-20130506-WA0004_zps9b4321e9.jpg

    Common bathroom complete with tap

    IMG-20130506-WA0005_zps45907918.jpg

    hi, nice reno.

    Where did u bought ur black tap for ur kitchen? i am also looking of one like this.


  9. Day 2 :

    Hacking almost completed. I went down today after work to check and I was suprised to see that hacking and demolition work is almost completed.

    Tomorrow we are meeting our contractor to discuss on size of window opening for kitchen. Once it is finalized they will start on tile work.

×