snorlax85
-
Content Count
5 -
Joined
-
Last visited
Posts posted by snorlax85
-
-
We had completed a BTO 3-rooms flat at Woodlands Cres for $8.5k
Kindly PM me to get a free quotation at your doorsteps
Items includes:
PROJECT CO-ORDINATING FEES
LAY CORRUGATED CARDBOARD (PROTECTION)
ACID WASH BEFORE HANDING OVER
HAULAGE SERVICES
PAINT WHOLE UNIT WITH NIPPON/ICI WASH & WEAR EQUIVALENT
TO CONNECT INLET AND OUTLET FOR KITCHEN SINK
TO CONNECT INLET AND OUTLET FOR WASHING MACHINE
SUPPLY LABOUR TO INSTALL 2 UNITS INSTANT HEATER
FABRICATE AND INSTALL 17ft TOP & BOTTOM WITH THE FOLLOWING SPECIFICATIONS:
- DESIGNER LAMINATE
- SOFT CLOSING ABS TRIMMING DOORS
- 15MM PLYWOOD CARCASS FRAME & 18MM PLYWOOD DOORS
STAINLESS STEEL DISH RACK
CONSTRUCT KITCHEN CABINET BASE, FRIDGE BASE, WASHING MACHINE BASE
FABRICATE AND INSTALL FULL HEIGHT 5ft CASEMENT WARDROBE WITH THE FOLLOWING SPECIFICATIONS:
- DESIGNER LAMINATE
- SOFT CLOSING ABS TRIMMING DOORS
FABRICATE AND INSTALL 3/4 HEIGHT FEATURE WALL WITH WITH THE FOLLOWING SPECIFICATIONS:
- DESIGNER LAMINATE
- SOFT CLOSING ABS TRIMMING DOORS
FABRICATE AND INSTALL TV CONSOLE WITH THE FOLLOWING SPECIFICATIONS:
- DESIGNER LAMINATE
FABRICATE AND INSTALL FULL HEIGHT 6ft CASEMENT WARDROBE WITH THE FOLLOWING SPECIFICATIONS:
- DESIGNER LAMINATE
- SOFT CLOSING ABS TRIMMING DOORS
SUPPLY AND INSTALL 2 UNIT ALUMINIUM BI-FOLD DOORS AT BOTH TOILETS
Kitchen Rescue Project
in RENOVATION PACKAGES, OFFERS & GROUP BUYS - Interior Design Packages, Kitchen Packages & Group Buy Offers & MORE!
Posted
This is one of our i1Reno Pte Ltd project in Lilydalle Executive Condo
We completed this kitchen facelift in 2weeks with our client staying-in, we tried our best to bring minimal inconvenience to our value client.
'One customer well taken care of could be more valuable than of $100,000 worth of advertising' - Jim Rohn