Jump to content
Find Professionals    Deals    Get Quotations   Portfolios

jchin1228

Members
  • Content Count

    36
  • Joined

  • Last visited

Posts posted by jchin1228


  1. Hi Aron,

    I try to call you and Ah Boon but no answer.

    Want to check with you whether it is ok to hide the air-con ducting in the false ceiling?

    Is there any ways to minimise the sweating? for example, by having thicker insulation?

    Do you provide 1/2 inch Class 1 Armaflex instead of Class 0?

    For the Mitsubishi Inverter system 4, do you have a larger BTU for the unit to be used in living room?

    Thanks!


  2. Hi Phylux,

    Can PM me the price for

    1. Philips dimmable downlight, model: 61033 (x8 units) with dimmer switch (x2 units)

    2. Philips LED downlight, any model: non-dimmable type (x2 units)

    3. Philips myBathroom ceiling light, model: 320663176 (x1 unit) and 320673176 (x1 unit)

    4. Philips ceiling light, model: 333463166 (x1 unit)

    5. Philips ceiling light, model: 305113166 (x2 units)

    6. UFO 54 white fan (x1 unit)

    *I will need to one more ceiling light for kitchen and one more ceiling light for service yard.

    Please do let me know whether you can provide installation as well. If yes, what will be the charges?

    Thanks a lot!

    • Like 1

  3. Hi,

    I am getting my 4rm BTO at Anchorvale Harvest somewhere in 3rd quarter.

    All will accept the floor plan from HDB and they will use it for their quotation.

    Just make sure that none have hidden costs.

    Check whether they charge you haulage fees, electrician costs, etc.

    I was charged between $200 to $800 for the haulage fees depending on ID.

    In fact, what I learn is that if you have minimum renovation, the haulage fees are quite low.

    You can pay directly to the HDB site office instead to the ID.

    Lightings and accessories are not included in my quotation.

    Some ID requests for 10% downpayment before they proceed to do the 3D. Only one requests $500.

    This is my personal preference.

    I will only pay downpayment upon receiving keys and have the ID or contractor to confirm the area.

    I just want to minimise any forms of disputes or misunderstanding.

    I did not approach any of the ID mentioned above so no comment.

    I have not-so-good feelings with two of the ID who I approach.

    Happy researching.


  4. Hi,

    I strongly recommend my ID from Ideal Interior. I decide to engage him for my new 4-room BTO at Sengkang. I had went to four different ID but quite satisfied with his quotation and another company's. We decided on him because we feel comfortable with him.

    Let me know if you are interested. He is able to bring customer to see ongoing renovation projects too. My wife and I will be going to one on the 27th April.

    Cheers.


  5. Hi AhHui,

    I just feel that your quotation is on the higher side. My first quotation is quite similar to yours but after painstaking searching around. Finally got one who is RADAC accredited and HDB licensed contractor. His price was a couple thousands below. Personally, I feel comfortable in talking to him.

    Advice is to search one or two more.


  6. Hi,

    Some items are cheaper than mine and some are more expensive.

    Mind to share with me your ID or contractor?

    Something that I learn while I am looking for ID.

    1. There will be haulage fees.

    2. Does your contractor supply the tiles for the tiles skirting?

    3. Electric Installation is a bit expensive for me although I have not receive any quotation for that.

    4. Lighting has to be purchased by ourselves and installation of lighting may be another cost.

    5. Will you be installing air-con? Air-con installation charges?

    6. You are charged with labour to install vanity cabinet and sink but there is no charges for the cabinet itself?

    7. I was charged $700 for 3ft shoe cabinet

    Is your ID / contractor HDB licensed and RADAC accredited?

×