ttttt
-
Content Count
4 -
Joined
-
Last visited
Posts posted by ttttt
-
-
-
-
Hello all,
We have managed to do a simple cozy looking, somewhat between nordic+minimalist renovation, nearing 22k.
We met with a few contractors and 1 ID, and decided to go ahead with the contractor that a good friend of mine had enagaged.
The whole renovations took about 3 months, as some items were out of stock and had to wait for it to be manufactured and shipped in.
Here are the work items covered by my contractor:
Living Room/ dining area
1. Vinyl flooring ****/dining areas and all bedrooms2. L-box with cove light holder, including installation of down-lights and cove lights3. Installation of ceiling fan with led light4. Installation of pendant lights for dining area5. Additional switches and relocation of electrical points6. Painting for the whole houseKitchen
1. Top and bottom cabinets, total of 31ft2. Kompacplus cabinet top and backsplash3. Kitchen cabinet kerbs4. Installation of kitchen accessories, including kitchen sink+tap, hood+hob+oven and an open shelf5. Additional switch and relocation of electrical pointsBathroom
1. Shower kerb for master bathroom2. Installation of Ikea bathroom accessories for common and master bathrooms3. Installation of Ikea sink and vanity drawer at master bathroom4. Installation of down lights and cove lightsMBR
1. Full height 6ft casement wardrobe at MBR2. Installation of wall fanBedrooms 2 and 31. Installation of wall fan2. Additional switch for wall fanItems that I liased with direct vendors/suppliers1. Whole house window grills and service yard window2. Master bathroom glass shower screen3. Aircon installation4. Bomb shelter store rack5. Slide arm for main doorWill share more photos and details later on.
Cheers!
4-room SOBF renovation journey: Nordic+minimalist feel
in Reno t-Blog Chat - HDB BTO Interior Design and Renovation
Posted · Edited by Anthea Goh
Laminate choice for MBR wardrobe:
Bedroom ceiling light:
Pendant lights for dining area:
Vinyl floor installation: