ryooki 0 Report post Posted August 14, 2010 Aircon Cont.. Study Room Aircon Balcony Aircon Waterpipe Kitchen Aircon Trunking Common Bathroom Aircon Trunking Share this post Link to post Share on other sites
ryooki 0 Report post Posted August 14, 2010 Glasses are up! Master bathroom shower glass Common bathroom shower glass Study Room Glass wall Kitchen Glass Share this post Link to post Share on other sites
ryooki 0 Report post Posted August 14, 2010 More Lights Bought Dining lights Share this post Link to post Share on other sites
mafacifa 0 Report post Posted August 14, 2010 hi, can pm me ur ID and cost for the glasses for ur study? thanks Share this post Link to post Share on other sites
dbkungfu 0 Report post Posted August 26, 2010 hi ryooki good luck in your handover this weekend :) ... post more photo ok Share this post Link to post Share on other sites
ryooki 0 Report post Posted August 26, 2010 Carpentry is up Back laminate of shoe cabinet Dining room cabinet Master Bedroom wardrobe Study Share this post Link to post Share on other sites
ryooki 0 Report post Posted August 26, 2010 Cont.. Kitchen Hi dbkungfu Don't think can handover this weekend.. still have some stuff not exactly done.. nevertheless.. keep my fingers crossed!! Share this post Link to post Share on other sites
ryooki 0 Report post Posted September 2, 2010 Some updates.. Supposed to be handover last weekend (28, 29 August). But still have quite a bit of things not done. 1) Cleaning up of walls in Kitchen. After tearing down the existing cabinets, there are still some silicon, adhesives, wooden planks stuck onto the wall. 2) Some areas requiring 2nd coat of paint as insufficient to cover marks, wiring boxes etc. 3) Toilet cabinets not up 4) Glass cabinets not finished 5) Parquet requiring cleaning as after varnishing, now again kenah some paint splatters. Wondering if removal of paint will remove varnish in the same process? 6) Varnishing and Making good of wooden archways 7) Permit from HDB to change louvre windows to top hung windows not ready as ID's window contractor need to follow up with re-submission 8) Dog Pee Grills are not done yet (nowhere insight) 9) Rewiring of some electrical points 10) Some remaining paint cleanups due to painting overshot certain areas 11) Re-sealing of some areas as the silicon or sealant has cracked 12) Checking of floor tile grout, able to dig up black stuff from the grout. Not sealed? 13) Filling up holes in ceiling and repainting ceiling 14) Varnishing of light box thingy at Foyer and Study 15) Repainting of Window wall ledge 16) Sealing up all holes and gaps This is just off the top of my head.. Dunno how much more.. And they need to be done by tomorrow!! Otherwise we cannot receive all our deliveries on saturday!! Enter PANIC mode. Share this post Link to post Share on other sites
leechaorui 2 Report post Posted September 6, 2010 Some updates.. Supposed to be handover last weekend (28, 29 August). But still have quite a bit of things not done. 1) Cleaning up of walls in Kitchen. After tearing down the existing cabinets, there are still some silicon, adhesives, wooden planks stuck onto the wall. 2) Some areas requiring 2nd coat of paint as insufficient to cover marks, wiring boxes etc. 3) Toilet cabinets not up 4) Glass cabinets not finished 5) Parquet requiring cleaning as after varnishing, now again kenah some paint splatters. Wondering if removal of paint will remove varnish in the same process? 6) Varnishing and Making good of wooden archways 7) Permit from HDB to change louvre windows to top hung windows not ready as ID's window contractor need to follow up with re-submission 8) Dog Pee Grills are not done yet (nowhere insight) 9) Rewiring of some electrical points 10) Some remaining paint cleanups due to painting overshot certain areas 11) Re-sealing of some areas as the silicon or sealant has cracked 12) Checking of floor tile grout, able to dig up black stuff from the grout. Not sealed? 13) Filling up holes in ceiling and repainting ceiling 14) Varnishing of light box thingy at Foyer and Study 15) Repainting of Window wall ledge 16) Sealing up all holes and gaps This is just off the top of my head.. Dunno how much more.. And they need to be done by tomorrow!! Otherwise we cannot receive all our deliveries on saturday!! Enter PANIC mode. How is the progress of the reno? Hopefully, everything good at your end - completed on time, on budget and on quality. cheers! Share this post Link to post Share on other sites
ryooki 0 Report post Posted September 7, 2010 Hi leechaorui, Thanks for the encouragement! So far most of the things are done. still pending the customised dog pee grill.. and some items needed touch ups.. some other touch ups if we can do ourselves, we will probably do as we really don't have the time and energy to follow up and chase. and we found out that our floor tiles have been stained by the corrugated boards the workers since the beginning of the reno! Very sian, see patches of grey here and there around the living room.. Have called my ID to fix the problem, he gave us some Amway product and my hubby was rubbing furiously for 4 hours yesterday and managed to get about 70% off.. on time - 1 wk late on budget - dunno yet on quality - muz give and take lor I will be moving house on this thursday and officially moving in on saturday. still packing and moving other items that need us to move ourselves. will be posting the pictures after moving in and also my verdict of my ID and his works. Share this post Link to post Share on other sites
ryooki 0 Report post Posted October 5, 2010 Have moved in for almost 3 weeks.. here are the lived-in pics.. not very well taken.. paiseh.. Final pics (part 1): Living room View from Dining room View from Balcony Balcony area TV area Share this post Link to post Share on other sites
ryooki 0 Report post Posted October 5, 2010 Final pics (part 2): Shoe Cabinet Dining Room Share this post Link to post Share on other sites
ryooki 0 Report post Posted October 5, 2010 Final pics (part 3): Display Cabinet (My Hubby's toys) Share this post Link to post Share on other sites
ryooki 0 Report post Posted October 5, 2010 Final pics (part 4): Kitchen Share this post Link to post Share on other sites
ryooki 0 Report post Posted October 5, 2010 Final pics (part 5): Study Room View from Foyer View from Study room to Living room View from Dining room Corridor (View from Master bedroom) Share this post Link to post Share on other sites