We arrived at the block about 9.30am to see our carpentry delivered and stored at a corner of the void deck! It was packed very compactly and neatly. Heard from my neighbour who has shifted in that he saw it being unloaded at about 7.10am in the morning!

20140519_092744_Android_zpsed3edf31.jpg

The workers arrived at about 10.30am and soon got to work. 4 of them.

20140519_153351_Android_zps12e35575.jpg

With about 1/4 of the carpentry inside the flat

20140519_153413_Android_zpsf5919d31.jpg

20140519_153500_Android_zpsca986a9c.jpg

There were still so many outside in the corridor!

Edited by harocarlos
 

Share this post


Link to post
Share on other sites
Looking for good contractors? Click here for your request

20140519_153509_Android_zpsebd47d79.jpg

This is the kitchen cabinet at the breakfast/bar counter side. We're using excel drawers for the whole house and blum hinges and blum aventos for the dish rack.

20140519_153519_Android_zpsfbc73c22.jpg

close up of the drawer track.

20140519_153044_Android_zps18312e56.jpg

my study table coming to shape!

20140519_154821_Android_zps84579b7e.jpg

common toilet storage mirror and vanity

20140519_155233_Android_zps12579729.jpg

bedside tables used as their planning desk temporarily

Edited by harocarlos
 

Share this post


Link to post
Share on other sites

The whole house will be in a different look once the carpentry is up.

Hope to see more updates once they are done

 

Share this post


Link to post
Share on other sites

Day 2 of carpentry work after citygas came to run the gas pipe in the morning..

20140520_151632_Android_zps3eaaa854.jpg

Slight cockup as the gas outlet ended a little short of mark. Will be rectified tomorrow..causing a delay as one side of the kitchen carpentry cannot be installed today for kompacplus to be measured..

20140520_151622_Android_zps8dace322.jpg

The other side of the kitchen cabinets are up...

20140520_093318_Android_zps532e1e11.jpg

Wardrobe and study table up yesterday... wifey keep complaining that my study table's depth is overkill... 750mm to be exact including the cable management slot... i love big working desk =X

20140520_183503_Android_zps6f01a735.jpg

Bedhead and side tables completed today...

 

Share this post


Link to post
Share on other sites

Very nice. I realised that you did not build be kitchen cabinet cement base?

Day 2 of carpentry work after citygas came to run the gas pipe in the morning..

20140520_151632_Android_zps3eaaa854.jpg

Slight cockup as the gas outlet ended a little short of mark. Will be rectified tomorrow..causing a delay as one side of the kitchen carpentry cannot be installed today for kompacplus to be measured..

20140520_151622_Android_zps8dace322.jpg

The other side of the kitchen cabinets are up...

20140520_093318_Android_zps532e1e11.jpg

Wardrobe and study table up yesterday... wifey keep complaining that my study table's depth is overkill... 750mm to be exact including the cable management slot... i love big working desk =X

20140520_183503_Android_zps6f01a735.jpg

Bedhead and side tables completed today...

 

Share this post


Link to post
Share on other sites

Very nice. I realised that you did not build be kitchen cabinet cement base?

yup, no cement base for kitchen as we will never wash the floors. It will just be supported by legs like those Ikea kitchen cabinets

Edited by harocarlos
 

Share this post


Link to post
Share on other sites

Hi, is your corridor track light using led? What's the walt you used?

Thanks!

We've began installing some of the lights, others will need to wait for carpentry to come up.

corridortrack_zpsdd3eb2b8.jpg

Corridor track light

haiku_zps3dc70191.jpg

Haiku fan is up!

ikealight_zps93be5817.jpg

IKEA's mini tracklight at the main entrance. Wifey feels that the "track" should be rotated 90deg to look better, what do you think?

20140512_145956_Android_zps7ce27dc2.jpg

Replica Tom Dixon Beats @ Bar/Breakfast Counter

 

Share this post


Link to post
Share on other sites

Hi, is your corridor track light using led? What's the walt you used?

Thanks!

Yes, all lights are LED except the Tom Dixon Lamps and some T5 tubes later on. If I remember correctly, its 3w each.

 

Share this post


Link to post
Share on other sites

20140522_101522_Android_zps2d4445e1.jpg

Wardrobe completed

20140522_101536_Android_zpsf7047dd6.jpg

Study table left the laminate on the table top and the metal legs.

20140522_183927_Android_zpsaacec531.jpg

Subway tiles in progress..will be all the way up to the ceiling.

20140522_183939_Android_zpsa7307e69.jpg

The sink side.

Edited by harocarlos
 

Share this post


Link to post
Share on other sites

20140522_183750_Android_zps1e4e1333.jpg

20140522_183803_Android_zpsed2b72de.jpg

Suspended shoe cabinet and console cum settee is up! The feature wall is not yet secured thats y its leaning at an angle...cant wait to see the laminated look of it!

20140522_184158_Android_zpsaeba185b.jpg

The btm part is done, so can have an idea of the look?

 

Share this post


Link to post
Share on other sites

Checked with the carpenter at the end of the day if they can finish everything tomorrow. He shook his head and replied, "Either Monday or Tuesday then can complete". Schedule is really tight now and I'm not sure if Kompacplus can meet the schedule as they have yet to fix an appointment to do the measurements. After which, they require about 1 week lead time. Problem is, I'm moving in next Sunday! without the Kompacplus, the toilet sinks/taps and kitchen sinks/taps can't be installed. I would have to use water from shower only -_-

Edited by harocarlos
 

Share this post


Link to post
Share on other sites

20140425_164911_Android_zps3fc47a95.jpg

Cement screeding of a small portion of the kitchen wall and the beam in progress.

20140424_153419_Android_zpsd641f2be.jpg

Washing machine base.

CommonAlcove_zpsec0c1a67.jpg

Common bathroom alcove wall.

MBRAlcove_zpsf0bac4bb.jpg

Master bathroom alcove wall. The aircon trunkings seen here will be hidden as we will have false ceilings in both the toilets.

Hi Harocarlos,

Fellow Ancillian here. :) Looks like your reno is going well! Great looking place. I am curious about what type of heater you use and how you manage to hide it since the outlet/inlets are quite low. Thanks in advance!

Edited by nickguthe
 

Share this post


Link to post
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
Sign in to follow this  

×