In the end, i settle for Quote 3 from a ID.

Wet Works

1 To supply labor and material to construct 2 nos cabinet bases $290.00

2 To supply labor and materials to construct fridge bases $90.00

3 To supply labor and materials to construct washing machines bases $130.00

4 To supply labor and materials to construct shower kerb $70.00

Total Wet Work Cost $580

Plumbing works

1 To supply labor and materials to extend stainless steel piping @ existing HDB copper piping point for new kitchen sink position $180

2 To supply and lay conseal PVC piping for drainage area @ kitchen sink $90

3 To supply and lay conseal PVC piping for drainage area @ washing machine $110

4 To supply labour only to install storage heater c/w storage heater stainless steel piping extension for hot & cold $140

5 To supply labor only to install toilet/whole house accessories FOC

6 To supply labor only to install & connect new kitchen sink & tap FOC

7 To supply labor only to install 2nos mini-spray sets FOC

Total Plumbing works $520

Ceiling/Parition works

1 To supply labor and materials to construct full height 2 sided partition wall c/w wood base board @ foyer area $430

Total Ceiling/Parition works 430

Glass works

1 To supply labor and materials to install full height plain edge clear mirror @ foyer area partition wall $450

2 To supply labor and materials to install designer series full height plain edge strip effect clear mirror @ foyer area partition wall 530

3 To supply labor and materials to install 2 D casement glass door between kitchen partition $580

4 To supply labor and install 1 set tempered glass shower screen @ master bathroom [1pcs fixed , 1casement[ $530

Total Glass works :2090

Aluminium Windows works

1 To supply and install HDB approve standards grade aluminium sliding window grill @ service yard, living/dining & 3 bedrooms/[max height 4 ft][bronze/Silver] $980

2 To supply labor and material to install 1 set powder coated sliding aluminium window @ service yard c/w HDB approved coloured glass. $680

Total Aluminium works $1660

Electrical works

1 To supply labor only to install internal light fixtures @ HDB standard ceiling light points(13 lighting points,lighting provided by owner) FOC

Total Electrical works $0

Carpentery works

Foyer Area

1 To fabricate and install full height shoes cabinets c/w casement door, ABS trimming, soft close mechanim hingers and designers handler in laminate finish[est 3ft] $650

Living Room

2 To fabricate and install low height storage cabinets daybeds c/w PVC cushion, casement sling door, ABS trimming, slow close mechanism hindges & designer handles in laminate finishes [est 10.5ft] $1470

Master Bathroom area

3 To fabricate and install suspended storage cabinets c/w 1 sliding mirror door, top and bottom coverlight , internal shelving, ABS trimming and designer handles in PVC finishes [est 5 ft] $690

Kitchen Area

4 To fabricate and install top tread removable pelmet box up in laminate finish @ both side 700

5 To fabricate and install top & bottom kitchen cabinet c/w ABS trimming, slow close mechanicsm hindges, 2 set of drawers and designer handles in laminate finish[est 20 ft] $2000

6 To supply and install 1 no frosted glass for kitchen cabinet FOC

7 To supply and install 1 nos 2-tier stainless stell dish rack FOC

8 To supply labor only to install cooker hob and hood FOC

9 To supply and install1 no PVC cutlery tray

10 To supply and install polyester base heavy duty solid surface worktop c/w front profile & backsplash [est 17ft][Test and appoved by PSB] 1150

*All carpentry works are all using solid 3 plywood c/w high pressure laminate finish, use only local laminate materials, material quality assured

Total carpentry costs=6660

Misc works

1 To supply labor and materials to pain whole unit using Original Nippon/ICI paint [4+1 colors] include Matex paint for ceiling (min two coats), painting of all PVC/stainless steel pipes, all doors, door frame c/w glossy paint if needed, main gaite c/w glossy paint if needed $1060

2 To supply labor and materials to acid wash for entire unit FOC

3 To supply labor and materials to do general cleanin for entire unit FOC

4 To supply labor and materials to lay corrugated paper for whole house by HDB haulage FOC

5 HDB parking of skip tank at loading and unloading fees FOC

6 HDB Permit and handling fees FOC

7 Haulage and debris removal fees [include upload of sand] As charged as per receipt

Total misc work :$1060 + ?

Total renovation cost = $13000*

* does not include haulage and debris removal fee and additional electical routing.

Hi, can you pm me the ID and renovation company details please? i am sourcing for quotations for comparison too.. thanks!

 

Share this post


Link to post
Share on other sites

Hi guys anyone can send me the ID for no 2 and no 3..

my collection of keys is 4th october 2014

costa ris 4 room BTO premium wif floorings from hdb.

Appreaciate if anyone can email it to me at@

ismail_hmzh@yahoo.com.

Thank you so much.

 

Share this post


Link to post
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
Sign in to follow this  


×