MiFTes 3 Report post Posted June 23, 2014 Hi,I got a package with my ID which includes perspective carpentary drawings. Have started on the renovation works. Just wonder, in general, when should he be giving me the perspective drawings? After the tiling works, coz only then he can take the measurement? or before that?Thanks 2 Share this post Link to post Share on other sites
nerrad 7 Report post Posted June 26, 2014 There is no need to wait for tiling works to start. Any time after he has measured the site he should be able to produce. Share this post Link to post Share on other sites