Jump to content
Find Professionals    Deals    Get Quotations   Portfolios
Sign in to follow this  
Garrison

My 4 Rm Bto

Recommended Posts


Join 46,923 satisfied homeowners who used renotalk quotation service to find interior designers. Get an estimated quotation

Yes, we bought the sofa from S&C. There is no customization for the sofa, the manufacturer offers it in a few colours. S&C is a small neighborhood shop and not much on display. But he can buy from many of the manufacturers that the major retailers buy from, and he usually gives a much lower price. You can do a search on RT for them, they are quite well known. For my sofa it's from a manufacturer called Hin Lim.

 

Share this post


Link to post
Share on other sites

Updates, Finally

Ok, I know I have not updated in a while.... A long while. But I'm Back!

Anyway, floor, ceiling, and painting are all done.

med_gallery_59717_484_135866.jpg

Our choice of colours

med_gallery_59717_484_13557.jpg

Study room colour, in case you are wondering what Tracey looks like. I chose this colour, cos I think the laminates are pretty dark already. And I think the blue and grey hues will be more calming.

med_gallery_59717_484_123589.jpg

2nd Bedroom colour, a.k.a. white ice. It's actually a light green. Wife insist on green, says will be good for kids eyes in the future. :dunno:

The living room and MBR are greyish shades of white, so no pics to show.

Glass works are also done.

med_gallery_59717_484_44146.jpgmed_gallery_59717_484_540731.jpgmed_gallery_59717_484_641542.jpg

Kitchen door, CBR and MBR shower screen. Think I will stick some decals on the kitche door, otherwise it's a bit invisible.Some minor details I'm not too happy about, will have to discuss with the ID.

 

Share this post


Link to post
Share on other sites

HI,

Are you using Bi fold glass door for kitchen?

May i know where you got it from?

How much?

Thanks

Updates, Finally

Ok, I know I have not updated in a while.... A long while. But I'm Back!

Anyway, floor, ceiling, and painting are all done.

med_gallery_59717_484_135866.jpg

Our choice of colours

med_gallery_59717_484_13557.jpg

Study room colour, in case you are wondering what Tracey looks like. I chose this colour, cos I think the laminates are pretty dark already. And I think the blue and grey hues will be more calming.

med_gallery_59717_484_123589.jpg

2nd Bedroom colour, a.k.a. white ice. It's actually a light green. Wife insist on green, says will be good for kids eyes in the future. :dunno:

The living room and MBR are greyish shades of white, so no pics to show.

Glass works are also done.

med_gallery_59717_484_44146.jpgmed_gallery_59717_484_540731.jpgmed_gallery_59717_484_641542.jpg

Kitchen door, CBR and MBR shower screen. Think I will stick some decals on the kitche door, otherwise it's a bit invisible.Some minor details I'm not too happy about, will have to discuss with the ID.

 

Share this post


Link to post
Share on other sites

The

HI,

Are you using Bi fold glass door for kitchen?

May i know where you got it from?

How much?

Thanks

The door is by my ID, and it cost $700+. But there are some small issues wit it I need to discuss with the ID to see if can rectify.

 

Share this post


Link to post
Share on other sites

More Updates

Right. It's been weeks since the last update. Most of the work are done. Save for a few small hiccups, carpentry will be completed. The ID admitted that carpentry took longer then usual, cause the factory is busy. A lot of people start work after Chinese 7th month, I guess.

Hiccup #1

I bought a basin cabinet for common toilet, and a semi-recessed basin for the MBR toilet. The basin cabinet came in 2 pieces, the basin and the cabinet. ID took the wrong basin to measure for the vanity cabinet, and ended up fabricating the vanity much deeper then needed. Because the cabinet is in the corner by the door, she had to chamfer the corners so as not to block the door. At first when she msg me that my basin is 18", so they need to built the cabinet 19" deep, I was like, "huh? the basin got so deep meh?" But didn't cross my mind that she got the wrong one. But anyway the semi recessed basin wouldn't fit, so she has to re-fabricate it. Luckily the table top is not cut yet.

Hiccup #2

The carpenter cut the slots on the shoe cabinet door at 45o like I wanted, but did the laminate wrong! He covered the door totally with the laminate. Dotz... like that cut the slot for what? Haiz. Anyway the inside surface is damaged during transport, so need to re-fab.

So, just a few pic of what it looks like now.

10527651_10152565242868145_6023835884623

1546276_10152586101353145_21829955970022

Living room

10703715_10152586101693145_8144131289807

My Dinning room lights. Think I will ask the ID to shift the blue one closer.

10354953_10152565242678145_4714867335119

Master Bedroom. It looks distorted because its a panaroma shot.

10710631_10152565242808145_6564997423079

10441014_10152565242743145_9044832752168

Kitchen. Granite surface is still not up yet.

 

Share this post


Link to post
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
Sign in to follow this  

×