  Demolition Works  
1 Demolish existing balcony aluminium sliding door 200.00
2 Demolish existing kitchen & bathroom bi-door 100.00
3 Demolish existing 2 nos bathrooms floor, wall tiles & sanitary ware  1,700.00
4 Demolish existing kitchen cabinets 450.00
5 Demolish existing 3 nos bedroom laminate floor & skirting 850.00
6 Dismantle existing bathroom water pipe 100.00
     
  Masonry Works  
1 Supply & lay waterproofing membrane for 2 nos bathrooms flooring 600.00
2 Supply 300mm * 450mm ceramic wall tiles till ceiling height for 2 nos bathroom ($2.50 per sqft) 1,225.00
3 supply new pre mix sand at 2 nos bathrooms (40mm thickness cement) 1,050.00
4 Supply labour to lay wall tiles for 2 nos bathrooms 2,750.00
5 Supply 300mm * 300mm homogenous non-slip design floor tiles at 2 nos bathrooms ($3.50 per sqft) 385.00
6 Supply labour to lay floor tiles for 2 nos bathrooms 900.00
7 Construct 50mm shower kerb at 2 nos bathrooms 300.00
8 Supply & lay (high end resilient flooring) vinyl flooring for all bedrooms c/w skirting 3,200.00
     
  Plumbing Works  
1 Supply & install stainless steel at 2 nos bathrooms 750.00
2 Connection of inlet / outlet for kitchen sinck 150.00
3 Supply labour to install 2 sets of toilet bowl 220.00
4 Supply labour to install 2 sets of wash basin & tap 200.00
5 Supply labour to install accessories for 2 nos bathrooms 150.00
6 Supply labour to install 2 nos instant water heater 200.00
     
  Ceiling Works  
1 Supply & install L-Box light holder **** hall 550.00
2 Supply & install L-Box light holder & false ceiling at master bedroom 750.00
     
  Carpentry Works (swing door c/w soft closing) Living /Dinning Hall  
1 Fabricate & install L-5ft * H-8ft shoe cabinet c/w settee in laminated finish at foyer 1,400.00
2 Construct (L-11ft * W-6ft * H-4") wooden platform with vinyl floor finish at balcony  1,200.00
     
  Master Bedroom  
1 Construct partition wall wooden support for sliding door at wardrobe entrance (L-3.5ft * H-8ft) 350.00
2a Fabricate & install L-12ft full height swing door wardrobe in laminated finish                    @ $3,600  
2b Supply & install L-12ft (OPSH) aluminiun pole system wardrobe (without door) 3,000.00
3 Supply & install L-3ft * H-7ft (OPSH) aluminium pole system sliding door wardrobe 480.00
  Master Bathroom  
4 Fabricate & install L-5ft suspended vanity cabinet c/w quartz top and laminated finish 1,250.00
5 Fabricate & install L-5ft * H-3ft mirror c/w laminated finish 300.00
     
  Kitchen  
1 Supply & install kitchen cabinet Top and bottom  with laminated finishing ,ABS trimming door (est 32ft) 3,448.00
  * stainless steel 2-tiers Dish Rack 0.00
  * Labour to install cooker hood & hob 0.00
2 Supply & install quartz surface kitchen worktop (est 16ft) 1,500.00
     
  Doors/Glass works  
1 Supply & install 2 nos aluminium bi-fold door for bathroom 600.00
2 Supply & install 2 set 10mm tempered glass shower screen 1,300.00
3 Supply & install 1 set 10mm frosted tempered glass door (5ft*7ft) for kitchen 900.00
     
  Others  
1 To painting whole house wall & ceiling using ICI (5 colours) 1,650.00
2 To painting all waste pipes & water pipes using ICI gloss paint 350.00
3 Cardboard protection for affected areas 350.00
4 Chemical washing & general cleaning upon completion 450.00
5 Haulage services & debris disposal 850.00
     
  Grand Total (include GST) 38,689.06
 

Share this post


Link to post
Share on other sites

Join 46,923 satisfied homeowners who used renotalk quotation service to find interior designers. Get an estimated quotation

I asked my ID/direct factorycontractor that done my house to estimate your quote.  He said he probably can do it for about 32K to 33K with no gst, but must see your floor plan as some things guessimate.  see if you can press further. :) if not get more quotes, so many ID and contractors around, but it would be best to see their actual workmanships not showroom since price is not everything.

 

Share this post


Link to post
Share on other sites
38 minutes ago, lk1980 said:

Hi all,

Just received this quotation from my ID, is this reasonable? Please help to advice.

Thanks.

  Demolition Works  
1 Demolish existing balcony aluminium sliding door 200.00 /ok
2 Demolish existing kitchen & bathroom bi-door 100.00/ 90
3 Demolish existing 2 nos bathrooms floor, wall tiles & sanitary ware (must clarify what sanitary ware item) 1700.00/1600 for tiles
4 Demolish existing kitchen cabinets 450.00/350
5 Demolish existing 3 nos bedroom laminate floor & skirting 850.00/750
6 Dismantle existing bathroom water pipe 100.00->?
     
  Masonry Works  
1 Supply & lay waterproofing membrane for 2 nos bathrooms flooring 600.00/500
2 Supply 300mm * 450mm ceramic wall tiles till ceiling height for 2 nos bathroom ($2.50 per sqft)

1,225.00/ $11.50psf inclusive labour & materials

3 supply new pre mix sand at 2 nos bathrooms (40mm thickness cement) 1,050.00/?
4 Supply labour to lay wall tiles for 2 nos bathrooms 2,750.00/?
5 Supply 300mm * 300mm homogenous non-slip design floor tiles at 2 nos bathrooms ($3.50 per sqft) 385.00/10.50psf inclusive labour & materials
6 Supply labour to lay floor tiles for 2 nos bathrooms


900.00/?

 

7 Construct 50mm shower kerb at 2 nos bathrooms 300.00/170
8 Supply & lay (high end resilient flooring) vinyl flooring for all bedrooms c/w skirting





3,200.00/ 5psf for vinyl flooring, skirting $450 for all bedrooms

     
  Plumbing Works  
1 Supply & install stainless steel at 2 nos bathrooms (clarify this is hot & cold pipe?) 750.00
2 Connection of inlet / outlet for kitchen sinck (clarify this is cold pipe and pvc drainage?) 150.00
3 Supply labour to install 2 sets of toilet bowl 220.00/180
4 Supply labour to install 2 sets of wash basin & tap 200.00/160
5 Supply labour to install accessories for 2 nos bathrooms (max how many accessories?) 150.00
6 Supply labour to install 2 nos instant water heater 200.00/100
     
  Ceiling Works  
1 Supply & install L-Box light holder **** hall (with covelight and downlight?) 550.00/550
2 Supply & install L-Box light holder & false ceiling at master bedroom(with covelight and downlight?) 750.00/950
     
  Carpentry Works (swing door c/w soft closing) Living /Dinning Hall  
1 Fabricate & install L-5ft * H-8ft shoe cabinet c/w settee in laminated finish at foyer 1,400.00
2 Construct (L-11ft * W-6ft * H-4") wooden platform with vinyl floor finish at balcony  1,200.00
     
  Master Bedroom  
1 Construct partition wall wooden support for sliding door at wardrobe entrance (L-3.5ft * H-8ft) (is this using hollow block or the normal partition board?) 350.00
2a Fabricate & install L-12ft full height swing door wardrobe in laminated finish                    @ $3,600 / 3360  
2b Supply & install L-12ft (OPSH) aluminiun pole system wardrobe (without door) 3,000.00
3 Supply & install L-3ft * H-7ft (OPSH) aluminium pole system sliding door wardrobe 480.00
  Master Bathroom  
4 Fabricate & install L-5ft suspended vanity cabinet c/w quartz top and laminated finish 1,250.00
5 Fabricate & install L-5ft * H-3ft mirror c/w laminated finish 300.00
     
  Kitchen  
1 Supply & install kitchen cabinet Top and bottom  with laminated finishing ,ABS trimming door (est 32ft) 3,448.00
  * stainless steel 2-tiers Dish Rack 0.00
  * Labour to install cooker hood & hob 0.00
2 Supply & install quartz surface kitchen worktop (est 16ft) 1,500.00
     
  Doors/Glass works  
1 Supply & install 2 nos aluminium bi-fold door for bathroom 600.00
2 Supply & install 2 set 10mm tempered glass shower screen 1,300.00
3 Supply & install 1 set 10mm frosted tempered glass door (5ft*7ft) for kitchen 900.00
     
  Others  
1 To painting whole house wall & ceiling using ICI (5 colours) 1,650.00
2 To painting all waste pipes & water pipes using ICI gloss paint 350.00
3 Cardboard protection for affected areas 350.00
4 Chemical washing & general cleaning upon completion 450.00
5 Haulage services & debris disposal 850.00
     
  Grand Total (include GST) 38,689.06

Hi, i gave your quotation to my contractor and in general, the items were quoted higher than my contractor. and some items were not stated clearly. Always clarify before confirming. thats what i did for my contractor! anything you can pm me yeah 

 

Share this post


Link to post
Share on other sites
29 minutes ago, Jetng1 said:

Bubee and Shaguadan, can share with me your contractor contacts please? Thanks!! :)

 

jetng1@gmail.com

Hi, hv PM-ed you:) hope you have a better quotation.

 

Share this post


Link to post
Share on other sites

I can't comment much about other items as may not be comparing apple to apple, examples, one ID may quote you wardrobes/cupboards with internal carcass laminated but another ID may just leave it as white, different brands of laminate used by different contractors, can you customise the internal of the wardrobes like you want all drawers instead of shelving, etc. Even for paint, an ID may quote you using odourless paint while another ID may quote you non odourless. $1,650 for whole house with limit of 5 colours isn't really that cheap, & you may wish to check what range of the paint the ID using.

For plumbing works, I find it to be on the higher side. For example, $150 for installing accessories for 2 bathrooms, I got 2 quotes, the cheaper one is $80 (up to 7 items) & more exp one is $120 (up to 5 items only) for both bathrooms. The cheaper one for WC (toilet bowl) is $90 ea & that is the plumber removing it, likewise the plumber is going to remove my current basin, taps & toilet accessories as well. I saw your ID quoted demolishing of sanitary ware, usually sanitary ware refers to WC & basins, so why should the ID charge this when the job is to be done by the plumber, especially the plumbing works charges seem to be on the higher side? Sorry, it just doesn't make sense to me cos it seems like double charging, else installation fees should be much cheaper since the plumber doesn't need to remove the old ones.

Does your ID allow you to source for your own plumber? It may be more time consuming for you as you need to do the coordination works yourself but some IDs may charge certain "premium" for plumbing/electrical/windows, meaning it's not a direct charge as quoted by the plumbing/electrical/windows guy. 

If you need another ID for comparison, I can pass you my ID's contact. However, do note that my reno is only going to start end May, so I can't exactly say if is really good all the way until my reno completes. So far, he's been quite good & we feel safe with his recommendations as he has certain standards of his own, so he won't use those really cheap skate materials. Anyway, if you're still sourcing around, no harm getting another contact for comparison. Disclaimer: I'm not a ID self promoting my service/company, but a sahm starting my reno soon in end May.

 

Share this post


Link to post
Share on other sites
On 5/16/2016 at 10:07 AM, Jetng1 said:

Bubee and Shaguadan, can share with me your contractor contacts please? Thanks!! :)

 

jetng1@gmail.com

Sorry I was very busy with work.  I will email you separately.  For those who PM me and I haven't reply them yet, besides whole house renovation, carpentry, etc., my contractor is the artist himself and personally drew artistic glass door designs like my door shown below.  Good Luck!large.IMG_5698.JPGlarge.IMG_5703.JPGlarge.IMG_5707.JPGlarge.IMG_5713.JPGlarge.IMG_5697.JPG

 

 

Share this post


Link to post
Share on other sites
On 5/14/2016 at 11:05 PM, Bubee7788 said:

I asked my ID/direct factorycontractor that done my house to estimate your quote.  He said he probably can do it for about 32K to 33K with no gst, but must see your floor plan as some things guessimate.  see if you can press further. :) if not get more quotes, so many ID and contractors around, but it would be best to see their actual workmanships not showroom since price is not everything.

 

On 5/15/2016 at 0:33 PM, shaguadan said:

Hi, i gave your quotation to my contractor and in general, the items were quoted higher than my contractor. and some items were not stated clearly. Always clarify before confirming. thats what i did for my contractor! anything you can pm me yeah 

Bubee and Shaguadan, can i have your contractor's contacts too! Thanks

 

Share this post


Link to post
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
Sign in to follow this  


×