Prideguy 5 Report post Posted November 8, 2016 Hi all, I've recently just booked my new 4-rm SBF flat and I'll be getting my keys soon. My flat does not comes with flooring for living room and 3 bedrooms. Only HDB default floor and wall tiles in kitchen and 2 toilets. I will be going for resilient vinyl flooring all living room and 3 BRs. Kitchen and toilet floor and wall I'm going for homogeneous tiles. I will be appealing for HDB cement screeding in order for me to lay the vinyl flooring. I will also plan to hack down partial of the kitchen wall and 1st bedroom wall. Can any laojiaos here provide me a checklist of the renovation process I should check or receive from renovation contractors? (not going for ID) Some people say flooring goes first, electricity goes first, wetwork/masonry works goes first, plumbing or aircon piping etc. But I am not too sure for my case. The renovation should involves the following, if I'm not wrong: 1) hacking of walls, 2) vinyl flooring installation / homo tiles overlaying, 3) aircon piping, 4) aluminium/glass work for hacked walls, 5) kitchen table top, 6) blinds, 7) electricity/lightings, 8) carpentry (kitchen cupboards, wardrobes etc) 9) painting (walls), 10) plumbing I'm not too sure which one should comes before/after each. Please feel free to add in to the checklist. For all your advices! Thanks. Share this post Link to post Share on other sites