Hihi, seek your expert opinion on this quotation, renovation for resale 3rm HDB @ Jurong East:

1 To hack off existing sink support c/w sink & tap at Kitchen    
                 
2 To hack off existing round edge at Kitchen entrance top corners & partial wall tiles as per discussed  
                 
3 To hack off existing floor tiles & skirtings **** room, 02nos. Bedrooms & Kitchen area  
                 
4 To hack off existing floor & wall tiles at 02 nos. Toilets    
                 
5 To dismantle & remove existing water inlet & outlet pipings at Kitchen & 02nos. Toilets  
                 
6 To hack off existing platform & squatting pan at Common toilet area (for conversion to sitting WC)  
                 
7 To dismantle & remove existing toilet bowls & all bathroom accessories at 02nos. Toilets toilets  
                 
8 To dismantle & remove existing electrical wirings & casing for Whole unit  
                 
9 To dismantle & remove existing all electrical power sockets, switches & lightings at Whole unit  
                 
10 To dismantle & remove existing aluminium window grilles & windows at Whole unit  
                 
11 To dismantle & remove existing aluminium top-hung windows at 02nos. Toilets  
                 
12 To dismantle & remove existing timber doors at 02nos. Bedrooms & 02nos. Toilets  
                 
13 To dismantle & remove existing timber door & metal gate at Main entrance  
                 
14 To dismantle & remove existing rubbish chute at Kitchen    
  Sub-Total for Hacking / Demolition Works (Lumpsum) :  $                         3,400.00
                 
15 Supply of raw materials & lay 600mm x 600mm Homogeneous floor tiles c/w skirtings at  $                         2,500.00
  Living room & 02 nos. Bedrooms        
                 
16 Supply of raw materials & lay 300mm x 600mm Homogeneous floor tiles at Kitchen area  $                             900.00
                 
17 Supply of 100mm x100mm white porcelain tiles & lay 01rows at new cabinets wall only  $                             300.00
                 
18 To do waterproofing using waterproofing membrane (K-11) at Kitchen flooring (water trap area)  $                             100.00
                 
19 To construct sink support using hollow blocks c/w metal structures (reinforcement) & tiles  $                             950.00
  finishings at Kitchen area (Base on L1400mm +L500mm)    
                 
20 To construct fridge & washing machine base c/w tiles finishings at Kitchen area  $                             320.00
                 
21 To construct cabinet base c/w tiles finishings at exposed surfaces at Kitchen area  $                             200.00
                 
22 To do plastering at all affected walls & make good after hacking at Kitchen entrance  $                             250.00
                 
23 To lay Homogenous floor tiles at Kitchen top after installation of Carpentry works  $                             300.00
  Master Toilet & Common Toilet        
                 
24 To do cement screedings at walls at 02nos. Toilets (for laying of wall tiles)  $                         1,000.00
                 
25 Supply of raw materials & labour to lay 300mm x 600mm Ceramics wall tiles at 02nos. Toilets  $                         2,200.00
                 
26 To do conversion of outlet waste for squatting pan to sitting WC at Common toilet  $                             300.00
                 
27 Supply of raw materials & labour to lay 300mm x 600mm Homogeneous floor tiles c/w kerb  $                             900.00
  (entrance) at 02nos. Toilet floorings        
                 
28 To do waterproofing using waterproofing membrane (K-11) at 02 nos. Toilets floorings  $                             180.00
  Sub-Total for Masonry Works / Wet Works :  $                       10,400.00
                 
29 Wiring of new lighting pts / fan pts c/w installation of light fittings (10nos. $60.00 /no)  $                             600.00
  -01no. Ceiling light **** room        
  -01no. Ceiling fan c/w lighting **** room      
  -02nos. Ceiling lights at Master & Common bedroom    
  -02nos. Wall lights at Master room        
  -02nos. Ceiling lights at Kitchen area        
  -02nos. Ceilings lights at Master & Common toilets      
                 
30 Wiring of new 1x13amp Single sockets (06nos $55.00/no)    $                             330.00
  -02nos. Single sso **** room (general area)      
  -02nos. Single sso at Master & Common bedroom (Bedhead area)  
  -02nos. Single sso at Master & Common toilet (Heater)    
                 
31 Wiring of new 2x13amp Double sockets ( 07nos. $65.00/no.)    $                             455.00
  -02nos. Double sso **** room (TV area)      
  -01no. Double sso at Common room (TV area)      
  -02nos. Double sso at Master room (TV & Computer area)    
  -01no. Double sso at Kitchen (Fridge & Washing Machine)    
  -01no. Double sso at Kitchen (Kitchen Cabinet area)    
                 
32 Wiring of new Telephone pt / Fax pt **** & Master room (02nos. $60.00/no.)  $                             120.00
                 
33 Wiring of new SCV socket (RG 6 cable) **** & Master room (02nos.  $110.00/no)  $                             220.00
                 
34 Wiring of new Aircon pt (20amp) (01no. $ 110.00/no)    $                             110.00
                 
35 Wiring of new Cooker hood/hob pt (20amp) c/w heater switch (01no. $110.00/no)  $                             110.00
                 
36 Wiring of new Door bell pt c/w installation of Doorbell (01no. $6 0.00/no)  $                               60.00
                 
37 To do earth bonding (6mm cable) (01lot. $100.00/no)    $                             100.00
  Sub-Total for Electrical Works :  $                         2,105.00
                 
38  To run new exposed stainless steel piping (cold water) to Kitchen & 02nos. Toilets  $                         1,200.00
                 
39  To install & connect 01no. Kitchen sink & tap c/w outlet pipe (PVC) at Kitchen area   $                             180.00
                 
40 To install & connect 01no. Washing machine tap c/w outlet pipe (PVC) at Kitchen area   $                             100.00
                 
41 To install & connect 02nos. wash basins & taps c/w outlet pipe (PVC) at 02nos. Toilets each  $                             240.00
                 
42 To install 02nos. Toilet sitting bowls at 02nos. Toilets each    $                             200.00
                 
43 To install 02set bathroom accessories at 02nos. Toilets each F.O.C  F.O.C 
                 
44 To install & connect 02sets Instant heaters at 02nos. Toilets each   $                             160.00
  Sub Total for Plumbing Works :   $                         2,080.00
                 
45 Supply labour, equipments , Nippon/Maltex emulsion paints & oil-based sealer to   $                         1,100.00
  paint whole unit interior walls (max. 5 colors) & ceilings (white)  
  - Base coating for whole unit interior walls & ceilings using white emulsion paint (Maltex)  
  - Nippon emulsion paints (Vinilex 5000 series) at all interior walls  
  - Door frames in glossy paints (Bodelac 9000 series)      
                 
46 Supply labour & materials to do box-up wire casing & pipings **** & Kitchen area $ 350.00  $                             350.00
  Sub Total for Fibrous Plasterings Works & Painting Works :   $                         1,450.00
                 
  Supply labour, eqiupments & materials to install for the followings using Aluminium frames  
  (BA/NA/BL c/w black tinted glass)        
47 To install 01set Sliding window (2-tier) **** room (Base on L1400mm xH1100mm)  $                             270.00
                 
48 To install 01set Sliding window (2-tier) at Common Bedroom (Base on L1400mm xH1100mm)   $                             270.00
                 
49 To install 01set Casement window at Master room (Base on L1200mm xH1100mm)  $                             280.00
                 
50 To install 01set Sliding window at Kitchen area (Base on L2600mm xH1100mm)  $                             550.00
                 
51 To install 02sets Casement top-hung window at 02nos. Toilets area (Base on L600mm xH450mm)   $                             300.00
                 
52 To install Fixed window grilles for whole unit (Base on L6600mm x H1100mm)  $                             640.00
                 
53 To install 02sets Bi-fold doors c/w lockset at Master & Common toilet (L900 xH2100mm)   $                             400.00
                 
54 To install 01set Sliding doors at sink support (Base on L1600mm x H800mm)  $                             330.00
55 To install 01set Wrought Iron gate c/w galvanized iron at Main entrance   $                             600.00
  (Base on L950mm xH2100mm)          
  Sub Total for Aluminium & Wrought Iron Works :   $                         3,640.00
                 
56 56 To install 01set Designer Veneer plywood door c/w press lockset at Main entrance   $                             650.00
  (Base on L900mm xH2100mm)          
                 
57 57 To install 02sets Designer Veneer plywood door c/w knob lockset at 02nos. bedrooms entrance $ 780.00  $                             780.00
  (Base on L900mm xH2100mm)          
  Sub Total for Timber Doors & Frames Works : $ 1,430.00  $                         1,430.00
                 
59 To install Full-height cabinets at Kitchen area (Base on L600mm +L800mm) $ 1,800.00  $                         1,800.00
                 
60  To install Top & Bottom cabinets (Base on L4850mm)     $                         2,080.00
                 
61 To install timber base support for tiles worktop finishings c/w 25mm bullnose (timber strip)   $                             500.00
  profile at Kitchen cabinet (Base on L2425mm)      
  -01set of drawers c/w 3way tracks & soft closers hinges     F.O.C 
  -01no. of cutlery tray           F.O.C 
                 
61 Installation of Cooker Stove & Hood F.O.C      F.O.C 
  Sub Total for Carpentry Works / Furniture Fittings :  $                         4,380.00
                 
  62 Sand & Haulage fees (uploading of sand/material and downloading of debris) $ 800.00  $                             800.00
                 
  63 Debris container for removal of debris to M.O.E approved dumping site $ 500.00  $                             500.00
                 
  64 Floor protection cardboard for Living area & Passageway flooring $ 150.00  $                             150.00
                 
  65 General cleaning for whole premise & Chemical washing at Kitchen & 02nos Toilets   $                             500.00
  Sub Total for Miscellaneous Works :   $                         1,950.00
  Total Amount :  $                       30,835.00
  Discount :   $                           (835.00)
  Grand Total Amount :   $                       30,000.00
 

Share this post


Link to post
Share on other sites

Join 46,923 satisfied homeowners who used renotalk quotation service to find interior designers. Get an estimated quotation

well Jackson, this quotation has too many question marks over its costing.

1. hacking demolition : its a bit overpriced.

15 and 16. this is where the question marks comes in. from what I understand, you are re-doing 1 living room and 2 bedroom flooring. it is too cheap to be true. I seriously doubt the pricing. unless u buy the tiles yourself, then its still a bit reasonable

 18. what? waterproofing the kitchen water trap area only? I thought we are supposed to water proof the whole kitchen instead of the water trap area? are you sure that's the correct procedure?

electrical and plumbing wise, is a tad expensive. both can shave off a couple of hundreds.

62, 63, 65 a tad expensive. can negotiate.

but seriously, your this quote is written in a way to confuse people. I have a hard time following the items. although the overall pricing seems reasonable, but some things are just too cheap. cheap is good, but if cheap involves using inexperienced workers, then the end problem is passed to the owners. would suggest u to compare a few quotes.

 

Share this post


Link to post
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
Sign in to follow this  

×