Hi All,

Its been sometime since i got a renovation quote for my apartment. I'm hoping to seek advice whether the following quote I received is reasonable for re-doing the whole of my existing 2 toilets (master bedroom toilet and common toilet) for an apartment. The total charges is about SGD19K, with following works. Appreciate your valuable feedbacks. 

 

HACKING/DEMOLITION WORK

Supply labour and tools to hack/dismantle wall, floor tile,

  • 1  bathtub, low wall, shower screen, toilet bowl and attach low wall at master toilet Supply labour and tools to hack/dismantle wall, floor tile, toilet
  • 2  bowl, shower screen, vanity cabinet, false ceiling, shower screen and toilet fitting at common toilet 



WET WORK (Ceramic/Homogeneous Tiles up to $3.00 psf)

  • 1  Supply labour and material to lay 300 x 600 designer's type wall tile up to ceiling height at common toilet
  • 2  Supply labour and material to lay 300 x 300 designer's type floor tile at common toilet
  • 3  Supply labour and material to construct shower kerb c/w full tile at toilet
  • 4  Supply labour and material to lay 300 x 600 designer's type wall tile up to ceiling height at master toilet
  • 5  Supply labour and material to lay est 150mm thick floor cement screeding after hacking of bathtub at master toilet
  • 6  Supply labour and material to lay 300 x 300 designer's type floor tile at master toilet
  • 7  Supply labour and material to do water-proofing for master and common toilet

PLUMBING WORKS

1 Supply labour and material to install conceal piping c/w 2 hot point at 2 toilets

  • 3  Supply labour to install toilet bowl
  • 4  Supply labour to install shower set  
  • 5  Supply labour to install vanity sink
  • 6  Supply labour to install toilet accessories

CARPENTRY WORKS (All carpentry is using solid plywood c/w internal white PVC finish, ABS trimmings, soft -closing hinges for doors)

  • 1  Design, fabricate and install vanity cabinet c/w selected laminate finished at master toilet
  • 2  Design, fabricate and install vanity cabinet c/w selected laminate finished at common toilet
  • 3  Design, fabricate and install mirror cabinet c/w selected laminate finished at master toilet
  • 4  Design, fabricate and install mirror cabinet c/w selected laminate finished at common toilet Design, fabricate and install selected solid surface work top
  • 5  c/w standard 50mm backsplash, 1 side semi curb at master toilet
  • 6  Design, fabricate and install selected solid surface work top c/w standard 50mm backsplash at common toilet

ALUMINIUM/DOOR/GLASS WORKS

  • 1  Supply labour and material to install 10mm thick clear tempered glass shower screen at toilet (1 fix, 1 swing)
  • 2  Supply labour and material to install matching ply wood door c/w vanishing walnut colour, lever lock
  • 3  Supply labour and material to install matching door trimming c/w $ vanishing walnut colour

CEILING/PARTITION WORKS

  • 1  Supply labour and material to install false ceiling c/w main hole at common toilet
  • 2  Supply labour and material to install false ceiling c/w main hole at master toilet

MISC WORKS

  • 1  Supply and material to lay corrugated floor protection sheet prior to renovation 


  • 2  Supply labour and material to do chemical washing and $ general cleaning after renovation
  • 3  Haulage fees- uploading of materials and disposing of debris $ after renovation

 

Share this post


Link to post
Share on other sites
Looking for good contractors? Click here for your request

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
Sign in to follow this  

×