Jump to content
Find Professionals    Deals    Get Quotations   Portfolios

Recommended Posts


Join 46,923 satisfied homeowners who used renotalk quotation service to find interior designers. Get an estimated quotation

yes! Was about to ask the same thing.. can i ask what is included in the reno? Cos im thinking of refurbishing my current flat. I don't need to do up my kitchen cos i did mine already. 

 

Share this post


Link to post
Share on other sites

Hi Sorry for the job scope that i forgot to upload .

Please see below listed: 

 

Job Scope:

1) Site protection, haulage and disposal of debris

2) House keeping and chemical cleaning before handover

Living

3) To remove protruding wall panel behind T.V console feature wall for disposal

4)To hack off all tiles skirting for disposal

5) To remove all wall paper for disposal

Kitchen

6) To remove all top wall mount cabinate door for disposal.

Master Bedroom

7) To remove wall paper for disposal. (keep window area wall paper.

8) To remove wardrobe sliding door and drawer face panel. for disposal.

Master Bathroom

9) To remove toilet bowl, basin and basin tap for disposal.

10) To hack shower area pebble flooring for disposal

11) Supply and install new toilet bowl 

WET WORKS Supply build material, equipment and labour to

12) Overlay common bath floor and install designer floor trap. (tiles budget $3.50 per sqft)

13) Overlay master bath floor and install designer floor trap. (tiles budget $3.50 per sqft)

14) PLASTERCEIL WORKS

15) To make good wall affected by hacking and demolish work.

CARPENTRY WORKS Including Soft closing hinges and soft closing drawer runner, ABS finishing on door.

16) Supply and re-laminated T.V console feature wall on front and back.

17) Supply and re-laminated top wall mount body exterior and supply new laminated door.

18) Supply new laminated door for wardrobe and drawer face panel. Lump sum.

19) PLUMBING WORKS

20) Labour to install master bath basin and tap.( Sanitary item and fixture not included.)

Others 

21) Supply and install quartz top on Tv console

22)  Supply and lay vinyl floor tiles over existing flooring **** and dinning. 380 sqft

23)  To cut existing entrance to kitchen door to allow new vinyl flooring to clear. 01 nos.

24)  Supply new ceiling fan point c/w control switch and install ceiling fan. 01 set.(Fan by owner)

25) To alter existing lighting switch control for cove lighting, T.V console light to single 01 set

26) Labour to install lighting. 06 nos. 

 

Share this post


Link to post
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
Sign in to follow this  

×