Jump to content
Find Professionals    Deals    Get Quotations   Portfolios

rumrum

Members
  • Content Count

    48
  • Joined

  • Last visited

Everything posted by rumrum

  1. hi, I would like to get Mr Tan contact too. How does the rest of the members find his service? I need someone reliable to be able to complete minor renovation works.
  2. Tiler Seng, tks for replying. It's more for water resistance as my washing machine is just right beside it. My sink occupies 2 cabinet doors. Like to get quotation from you, what info do you need from me in order to quote?
  3. hi tilerseng, if I had just renovated my kitchen not long ago and I want to build concrete support under kitchen sink, must the whole tabletop be removed? Can just remove the interiors of the cabinet and build concrete support & tiled it mah?
  4. Hi I am interested. Can PM me his contact? Any pic for his works?
  5. Hi, I know this is an old post but is it possible to remove the wood under the sink & keep existing tabletop and build concrete support under the sink? Anyone did so can share here?
  6. Can any kind soul advise what is the adhesive material used to overlay toilet floor tiles?
  7. hi, ahmen. can you PM me Mr Tan's contact number? Does he speaks Chinese or English? I need him to do some floor tile skirting at my mum's living room & repair the tiles at the stove.
  8. rumrum

    Window Hinge

  9. rumrum

    Window Hinge

    From the album: Window Hinge

  10. Dear all, I had asked a lot of places to get the hinge for sliding windows for the old type of HDB flats. Can anyone advise me? Even my contractors say very difficult to find these days..... http://renotalk.com/forum/uploads/gallery_15533_296_149249.jpg
  11. I know this is an old topic but now I am facing the same problem of having water seeping from the washing machine pipe. Both my kitchen sink and washing machine are located next to each other. This is causing me a big headache! I really regret didnt building this up. Can anyone pass me contact to build the concerete wall for my sink? I need it to be tiled also. Thank you very much!!
  12. Hi durhambaby, have you resolved your problem? Is it possible that you share the contact you have? my mum place is having this problem now. I am thinking who to contact. Appreciate if you can share the contact.
  13. Hi, does anyone knows where to customise hall cabinets? I check with an ID and their quotes are super high... I saw a flyer from Fullhouse with this picture and wonder did anyone buy from them?
  14. hihi, I am also looking for child-proof tv console. Any carpenter reccomendation?
  15. Hi lawry, I am curious do you have to tear down the countertop when you build the concrete support for your kitchen sink? Hope you can share your built in concrete support with us soon.
  16. Hi, you may consider asking your contractor to tile up the concrete part of your sink support and divider. I think you are referring to the top part of the concerte divider. What my previous contractor did for me was using hollow bricks to build up the divider then use cement and tiles to build it. There after the solid surface will cover it straight. That's about all. Hope this helps.
  17. Hi dreamzgal, dont be disheartened. Buying a flat will really takes time and a bit of luck. I also tried to do house-hunting on my own but I often encounter those property agents are using pyscological tactics to get buyers to commit. I was lucky to meet a nice property agent who is patient and persistent to look an ideal unit at the area I want. In the end, I engaged her to sell my flat. We negotiated her agent fees and I am so glad I met an understanding agent. Maybe you want to consider getting a property agent help instead. Wish you gd luck!!
  18. hihi, tks for your advise. I did tried to talk to my buyer for extension but they refused. So I can only rush my contractor to finish this month. Finally I see more works done. Waterproofing for 2 toilets, plastering for all wall tiles in kitchen and 2 toilets. The wall tiles are up for master bedroom toilet and kitchen. At such progress, I do not know if my contractor can finish everything by next week??? My contractor really cannot stand my husband nagging almost everyday.
  19. 2 full days??!! Die liao. I am supposed to hand over my keys of my current flat to my buyer by 01 Jul. At such pace, I dont think I can move in by 30 Jun. Can I terminate his contract in such a manner? But it's a bit tough to get another contractor to do the halfway work. Can anyone advise me?
  20. Tks for your advise. I think I let my contractor workers slack too long liao. I am just renovating one kitchen and two toilets and they took 1.5 weeks to hack all the tiles and clear the debris. Now I really regret using this contractor service. My contractor told me waterproofing will need 1-2 days since my area is so small.
  21. Hi Tim, I have cleared my pm box. Awaiting for your reply! Tks!
  22. Hi Tim, I had pmed you twice but no reply from you yet. Please quote me Mitsubishi Starmex inverter system 3 & 4 price. Tks!
  23. I need advise from RT experts. How long does hacking takes for 1 kitchen and 2 toilets? Mine is a resale flat of 85sqm. Only doing reno to the kitchen and 2 toilets. But my contractor has been telling me his worker is going for hacking refresher course (wasted 1 day), yesterday just finish hacking my kitchen but havent start with the toilets. I have been telling him that I need to move in by 30 Jun and he seems to be taking his own sweet time. How should I chase him for this?
  24. Hi Tim, can you quote me Mitsubisi Starmex inverter system 3 and system 4? Tks!
×