

upnorth
Members-
Content Count
90 -
Joined
-
Last visited
Content Type
Profiles
Forums
Gallery
Everything posted by upnorth
-
Kitchen Rooms
-
Follow up with picture for Day 1 & 2 Entrance & Balcony Living & Dining Hall
-
hi all, Reno Day 2 went back to c c look look after work.... wow, working very fast, almost 80% done after two days of hacking Also just saw the HDB approval to knock down the six walls ..... haha happy like bird . We're worry that they mau reject the request. upload the photos of "destruction" done by demolition team of 4 ....................
-
it is good to hear that you are also one yeaker. good luck to you too and yr house also turn out swee swee.
-
from pictures it looked ok but in actual most of the tins are quite in bad condition. no choice, dun want to move so tia tia overhaul the entire house.
-
Just went back to see but too dark cannot picture. But it seems that they are progressing well. According to Yeak, it will take us about 5 days to hack as we have so many items to take away
-
Common toilet We got so many cornices need to tear down
-
MBR- View from window MBR- View from room entrance MBR cornice MBR toilet Another view of MBR toilet
-
Kitchen- View from store room Kitchen- View from window My girl room My boy room
-
Another part of living hall Living hall cornice Another living hall cornice Kitchen
-
Pictures time- Pre-renovation Main Entrance Balcony Part of living hall and dining hall Another part of living hall
-
finally, the hse is empty now and waiting for the big day to start .......... upload pictures by tonight ...........
-
hopefully no more to add. believe the list is very comprehensive liao.
-
more than 60K hope my home sui sui after spending 60k.
-
ya, we also can't believe there are 84 items. We kept adding on each revised quote. Altogether, we have revised 3 revised quote from Yeak.
-
Items purchased:- 1. LG TV- 42" & 47" 2. Samsung fridge 3. Brandt Washing Machine 4. Simmon Mattress 5. Teak Furnitures- Daybed; Dining table w/ chair; Writing table & coffee table 6. Water feature 7. Mitsubishi System 4 Outstanding items not purchase:- 1. Lightings 2. Sanitary wares 3. Ceiling fans $$ draining out from pocket like siao
-
Renovation copes:- 1 Whole house hacking walls & floor tiles 2 To dismantle whole house false ceiling, partition wall & lights holder 3 To dismantle existing kitchen cabinet 4 To dismantle existing wardrobe & book cabinet 5 To level up existing balcony flooring with foam 6 To supply & lay homogenous flooring at balcony 7 To supply & lay homogenous flooring ****, dining & 3 bedroom 8 To supply & install timber skirting for whole house 9 To construct 3 ft height low wall to create new room **** 10 To supply & install 10mm clear tempered glass fixed panel on top of low wall 11 To supply & install 2 panel of fixed & sliding tempered glass doors at new room 12 To demolish existing wall between bedroom 2 & 3 c/w patch up 13 To erect new hollow block wall at bedroom 2 14 To demolish existing wall to create new opening at master bedroom 15 To seal up wall with hollow block at master bedroom 16 To supply & install 3 no of door frame 17 To supply & install 3 no of veneer doors c/w lever lock 18 To demolish existing wall at store 19 To erect new hollow block wall at store 20 To supply & lay kitchen & store room flooring 21 To supply & lay kitchen wall tiles up to ceiling height 22 To construct cabinet & washing machice base 23 To erect holow block low wall come with tiling finish at kitchen 24 To supply & install stainless steel rubbish chute 25 To construct concrete sink support 26 To supply & install laminated kitchen cabinet for 30 ft 27 To supply & install solid surface top for 16 ft 28 To supply & lay 2 toilets flooring 29 To supply & lay 2 toilets wall tiles up to ceiling height 30 Waterproofing for kitchen & 2 toilets 31 To demolish existing wall at master toilet 32 To erect hollow block low wall for 2 ft only at master toilet 33 To supply & install tempered glass sliding door at kitchen entrance 34 To supply & install 2 no of Pd door at store & common toilet 35 To supply & install 10mm clear tempered glass on top of low wall at master toilet 36 To construct 1 no of shower kerb at master toilet 37 To supply & install 10mm clear tempered glass L shape fixed panel & swing door at master toilet 38 To lower down existing ceiling with partition board at master toilet entrance 39 To supply & install tempered glass shower screen at master toilet 40 To supply & install laminated vanity cabinet for 3 ft at master toilet 41 To supply & install solid top for vanity at master toilet 42 To supply & install mirror on top of vanity at master toilet 43 To install 2 no of WC, basin & storage heater 44 To supply & install whole house stainless steel piping c/w 2 hot pts 45 To supply & install aluminium sliding wardrobe for 10ft at main room 46 To supply & install false ceiling at master bedroom 47 To supply & install fake partition wall for 4 ft at TV area at main room 48 To supply & install one pc of laminated shelf at TV area 49 To supply & install L box at wardrobe & window area at room 2 & 3 50 To supply & install aluminium sliding wardrobe for the total of 10 ft at bedroom 2 & 3 51 To level up existing partition wall at bedroom 2 52 To supply & install false ceiling at new room **** hall 53 To supply & install L box at 2 living hall ( one area 2 sides only ) 54 To supply & install false ceiling at balcony 55 To supply & install partition wall c/w 2 x 6 ft mirror at foyer 56 To supply & install laminated low shoe cabinet for 6 ft at foyer 57 To supply & install 3 no of laminated shelves **** 58 To supply & install laminated TV console for 6 ft **** 59 To supply & lay wall tiles at one side of dining wall ( to be confirmed 60 To supply & install L box cum cove lights near window at dining 61 To supply & install one no of solid veneer main door 62 To supply & install wrought iron main gate 63 To supply & install 2 no of aluminium top hung window at toilet 64 To supply & install ventilation fan at master toilet ( KDK brand ) 65 To supply & install whole house white powder coated aluminium sliding window ( 3 to 4 ways track ) come with green glass 66 Whole house plastering 67 Whole house painting come with sealer ( ICI/Nippon ) 68 Whole house re-wiring estimated for 69 To seal up existing common toilet entrance with hollow block 70 To create new opening for common toilet 71 HDB permit fee 72 Acid washing for whole house 73 Haulage & debris disposal 74 To supply & install suspended laminated low cabinet for 9ft at dining 75 To supply & install laminated feature wall for 6 ft by 8ft **** 76 To supply & lay wall tiles at balcony up to window height only 77 To box up existing drainage pipe c/w display shelves at balcony 78 To supply & install 4 no of concrete shelves at toilets 79 To supply & install laminated study table for the total of 10 ft 80 To supply & install laminated top cabnet for 9ft on top of study table 81 To supply & install 2 set of laminated queen size bed 82 To supply & install 2 no of laminated bedhead 83 To supply & install laminated pull out single bed at bedroom 2 84 To supply & install laminated king size bed c/w bedhead at m/room
-
Have returned the laminate catalogue to Yeak liao so not able to show it. Have written down the number code chosen and will go to the laminate companies to take a look of the big piece. Too small cannot visualise. Lucky those companies are near to Woodland
-
We have finished packing and shifted out from our nest yesterday. Can't image got so many cartons. Count down for the "动土" which is on 12 Nov.
-
Actually, those laminates are selected by my hubby. The moment he show Yeak the laminate, he was immediately gunned down. Those colour that he chosen are very old fashion and already outdated and cannot match with the tiles selected. He has chosen wooden grain laminate but the colour are more to orange tones. I prefer walnut wood grain but he said it was too dark. So I ask him to chose.Heeheee~
-
paiseh paiseh. actually there are doors for them
-
busy busy busy ................ packing packing packing .................. the date getting closer and closer to start the reno, we're all excited. For last few days busy to chose laminates, paint colors, capentry layouts, how to do this and what to do that etc etc etc ...... Especailly the laminate, my first choice striaght away gunned down by Yeak ............ will continue update the progress.
-
yes, you are right. It is jumbo 5 room.
-
Mine is less than 5 mins walk to swimming pool and stadium.
-
thanks simon. will post more pre-reno pics after shifting out.