  1. Oh, feel for you, howard. The company is always mentioned in the forum. 

    You can seek legal advice at the Free Legal Aid for your case.

    Also if you think u have a case, go to CASE and Small Claims Tribunal. They should compensate you for the inconvenience for living with half job finished works.

    The lawyers in the Legal Aid are the best person to calculate the compensation cost. Bring it up and escalate it if you thinku got a case. U never know.

    Also tell your friend to lodge police report and bring the matter to the State Court. I despised those Bengs who likes insulting others.


  2. Hi all,

    I am renovating my kitchen & 2 bathroom and below is the quote received.

    Is it reasonable?

    General:

    - Supply labour and materials to lay cardboard protection - $160

    - Supply labour and materials to paint whole house using Nippon paint including door frame, water pipes and door varnish - $1500

    -Clear and dispose all debris upon completion -$450

    -Chemical wash and general cleaning for whole house - $410

    Sub Total: $2520

    Demolition works

    -Hack off existing 2 bathroom and kitchen floor tiles

    - Hack off existing 2 bathroom and kitchen wall tiles

    - Hack off existing kitchen concrete sink and cement base

    -Hack off existing 2 bathroom door frame and door

    -Hack off existing 2 bathroom sanitary wares

    Sub Total: $2800

    Mansory works

    -Supply labour and materials to HDB approved water proofing membrane and prepack mortar for kitchen floor - $450

    -Supply labour and materials to lay non-slip homogenous tiles 60x30cm kitchen floor tiles ($3/sqft) - $1470

    -Supply labour and materials to lay HDB approved prepack screeding for kitchen and 2 bathroom wall - $1100

    -Supply labour and materials to HDB approved water proofing membrane and prepack mortar for 2 bathroom floor - $810

    -Supply labour and materials to lay ceramic kitchen wall tiles (60x30cm), up to $2.80/sqft -$3500

    -Supply labour and materials to construct H50mm kitchen cabinet base c/w tile finish -$590

    -Supply labour and materials to lay non-slip homogenous tiles 60x30cm for 2 bathroom floor tiles ($3/sqft) - $1310

    -Supply labour and materials to lay ceramic wall tiles (60x30cm), up to $2.80/sqft for 2 bathroom -$3240

    --Supply labour and materials to construct fridge and washing machine base tile finish -$300

    -To make good wall surface after hacking 2 bathroom door frame - $200

    Sub Total: $12970

    Plumbing works:

    -Supply labour and materials to replace all pipes to stainless stain in kitchen and 2 bathroom-$1350

    -Supply labour and materials to install and connect drainage pipe for washing machine - $100

    -Supply labour to install 2 toilet bowl - $185

    -Supply labour to connect basin and tap for 2 bathroom - $155

    -Supply labour to connect kitchen sink and tap -$155

    -Supply labour to install storage heater -$115

    Sub Total: $2060

    Door works

    --Supply labour and materials to install swing slide door for 2 bathroom - $760

    -Supply labour and materials to install 10mm tempered glass shower screen for 2 bathroom - $920

    Sub Total: $1680

    Total: $22030


  3. On ‎28‎/‎7‎/‎2016 at 7:37 PM, Andrew LaughAlot said:

    Hi peeps, 

    I will be getting keys to my 3room bto soon and would need recommendation for a contractor that is reliable and cost friendly as my budget is quite tight.

    Thanks in advance for the help!

    To share with you, last few months I am also searching for contractor and believe their price is lower than ID but After comparing with a few, seems like their price are about the same.

    As such, just approach ID or contractor. I am in the midst of finalising the quotation already.

    Its a challenging task to go around explaining the requirements, concepts, listing out the items and looking at their quotations......

    Just enjoy the process.


  4. Yoz all, my 7 year old Daikin problem had a blinking light when switched on. After I had diagnosed the problem through the faulty code, it is "C4" which means Thermistor faulty. Anyone knows how much to change 1? My friend says he had ever changed one for $150 ! Please advise pls.

×