  1. I did my home Reno on 2010. Can search my Nick to read my blog. My bro did his on 2012. Then recently my friend was looking for a contractor and I intro mine to her. Went to her housewarming and everything was nicely done. She was very pleased with the workmanship n comment that my contractor is a responsible guy. Would like to recommend to others who are interested in looking for good n reliable contractor. Pricing wise. I not sure how cheap is it as I did mine on 2010,can't compare the rates against 2014.


  2. Hi all, didnt expect i will be back on this forum again since my house reno 2yrs ago. Now is helping my bro to ask for his upcoming new house. Not too sure about the market rate now for new hdb as i did mine is resale flat. He got a few quotations and it seem to me this is the most cheaper one. Can anyone help me to see whether is the quotation ok? Market rate is around this pricing?? Thanks!

    NEW STANDARD HDB APARTMENT

    A PROFESSIONAL SERVICES

    01. Design Consultation & Space Planning

    02. Design Proposal, Concept & Perspective Drawings

    03. Colours, Materials & Accessories Proposal

    04. Project Management & Site Supervision

    05. Guaranteed After Sales Service with Warranty

    B MASONRY WORKS

    06. Supply & lay Super Polishes Homogeneous floor tiles

    c/w skirting **** & dining

    07. Supply & lay Super Polishes Homogeneous floor tiles

    c/w skirting at household shelter

    08. Supply & lay designer Heavy duty laminate flooring

    c/w skirting at all bedrooms

    09. Construct 50mm kitchen cabinet cement mortar base c/w side tiling

    10. Construct 50mm fridge cement mortar base c/w full tiling

    11. Construct 50mm washing machine cement mortar base c/w full tiling

    12. Construct main entrance kerb

    C CEILING WORKS

    13. Supply & install L-Box or False ceiling **** area

    14. Supply & install L-Box or False ceiling at dining area

    15. Supply & install False ceiling at bedroom passageway

    D PAINTING WORKS

    16. Painting of internal walls & ceiling for whole unit with

    Nippon Emulsion Paint

    17. Painting of all doors, frames, pipes & gate with

    Nippon Gloss Paint

    E PLUMBING WORKS

    18. Extension of copper piping for kitchen sink and washing machine

    19. Laying of drainage pipe for kitchen sink and washing machine

    20. Supply labour to install kitchen sink & tap

    21. Supply labour to install 2 sets of instant heater or storage heater

    22. Supply labour to install 2 sets of bathroom accessories

    F CARPENTRY WORKS

    23. Design & fabricate 20 ft kitchen cabinet in laminate finish c/w

    ABS trimming swing door with stainless steel dish rack,

    anti-slam hinges, cutlery tray and designer handles

    24. Supply & install 10 ft Solid Surface worktop

    25. Supply labour to install cooker hood and hob

    G MISCELLANEOUS WORKS

    26. Floor protection with corrugated cardboard on affected area

    27. Chemical washing for whole unit

    28. General cleaning upon completion of works

    29. Upgrade to floor tiles in 3 bedroom $888.00

    Size/Area Amount

    4 room : $10,388.00

    Masonry Works Unit Price Size/Area Amount

    To supply materials & labour to construct 2" Shower kerb c/w FOC

    3 side tiles finishes at Bathroom 1 / 2

    Budgetary Carpentry Quotation

    Unit Price Size/Area Amount

    Foyer

    Full ht Shoes cabinet (Full Ht) 5ftr $900.00

    Feature wall w/o display openings. 7ftr $1,400.00

    Living Area

    Feature wall in Laminated / Glass / Mirror / Wall Paper 6ftr $1,320.00

    Suspended TV console 6ftr $720.00

    Master Bedroom

    Feature wall in Laminated / Glass / Mirror / Wall Paper 6ftr $1,320.00

    Wardrobe c/w sliding door 6ftr $1,440.00

    Bedroom 2

    Wardrobe c/w sliding door 6ftr $1,440.00

    Bedroom 3

    Wardrobe c/w sliding door 6ftr $1,440.00

    Master Bathroom

    Vanity Top in Solid Surface. 4ftr $260.00

    Suspended Vanity Base cabinet. 4ftr $520.00

    Shower screen 1set $450.00

    Kitchen

    To supply materials and labour to fabricate additional kitchen 4ftr $360.00

    cabinet with laminated finish c/w ABS trimming for door

    To supply materials and labour to install solid surface work top 2ftr $130.00

    for kitchen cabinet

    Sub-Total : $11,700.00

    HDB Package Amount : $11,276.00

    Total Amount Quoted : $22,976.00


  3. jus to share my story. i went dwn to the jalan besar branch to purchase 2 lightings for living n dining room. the prices are really attractive. the salesperson who serve us wasnt really professional bt i am still ok with it.everything was fine until the setup of our lights. we did the setup ourselves. for dining room,we brought the 3 hanging crystal pendant.fixing till the end,short of 1 crystal. i really didnt expect that.was disappointing.

    then the living room light, was another disappointing thing. we brought a hanging pendant design. when fixing we saw there is alot of burnt mark outside the pendant. this is confirm unacceptable so we call back n guess what the salesman told us ? "we can exchange another one for u bt i can tell u it will be the same cause the products are all like that ". what does they mean all like that n why didnt the salesman told us at the first place? i was really disappointing. he told us to bring it dwn to exchange n collect 1 of our hanging crystal.

    nw i am afraid that the material is nt so gd n it wont last long. i am blaming myself why in the first place i finding cheap stuff.. do u guys have the same thing as me? he told me alot customers also complain about the burnt mark. pls advise what i can do. i really sad upon seeing the lights. 1 more thing. the salesperson didnt told us about the lucky draw thing. do u guys fill up forms for the lucky draw or u all auto in ? my purchase was $600 plus n i dun think it is a small amount. ty.


  4. Your reno quite fast.. when can move in?

    Contractor say by end of next week will complete bt we will shift in

    only next mth.

    Slowly shift our things in first then set a day for housewarming. :D

    So hws ur process? When is ur shifting in date?


  5. nope.. they dividing the kitchen.. dinning table is in the kitchen..

    oh no wonder the kitchen cabinet look more shorter.

    if the dining table inside kitchen then it will tk up the space.

    hmm...gd design too. me headache on mine .

    i guess my appeal will end up the same as u.have to start planning again. :(


  6. welcome~ seems we have a num of people from yishun here. :)

    The floor tiles seem to be in quite good condition, going to change them? Kitchen seems a bit dark though.

    all tiles will be keeping except for both toilets.major reno for toilets. :) kitchen is dark.dunnoe y bt once window

    open will be better.anyway choosing white for my cabinet to mk the kitchen more brighter.

    is my kitchen wall tile very old fashion? scare it wont match my cabinet.


  7. welcome to RT. another new addition to my hometown...the boring town to El gor :D

    nice layout. always wat i love about yishun...big and squarish flat.

    hi5 samgalz! me been living in yishun all my life. i believe

    El Nito will learn to love this place. :)


  8. Welcome to RT. The condition of the house looks good. What will you be renovating?

    ya condition is nt too bad.will be renovating

    both toilets,kitchen cabinet,false ceiling

    for mbr.living room tiles will keep.jus wash n

    it will look more brand new. :D


  9. Finally starting my simple t-blog. Reno starting this week,so better post the before

    pics. Here it goes

    My living room (View from front door)

    IMG_2434.jpg

    Another view of my living room

    IMG_2462.jpg

    Closer look on my living room floor

    IMG_2441.jpg


  10. do they participate in GSS? ;)

    only getting my keys in Jul, so now still a bit early to go bargain hunt...

    nt sure whether they will participate in GSS bt

    u can drop by n tk a look at their sofas first

    n ask ard.


  11. Hi pal, I've PMed you liao, hope you'll save abit n buy me kopi ya lol kekeke..... :D

    cheers :yamseng:

    hi bro,can pm me the contacts too.thx and where can

    i find u to buy u kopi.found out that u love kopi alot.

    cause all treating u kopi not tea. :)


  12. I jus purchased the package ytd at Parkmall branch. Really gd service

    from the lady Jenny.Sofa + coffee table + bedframe + queensize mattress

    + the $49 beanbag = $2185. Really very please abt the pricing and gotten

    freebies too. She is a patient lady n really no black face when i bargained

    with her. If anyone wan to purchase the package and do not wan to buy

    the beanbag pls pm me cause thinking of buying another one. Thx.


  13. half hr fire rated door: i was quoted between 800 to 950 from contractors. I see no problem in u getting it less than 1k.

    if u had already confirmed with carpenter then nothing more can be done except praying? haha...do let us know of the outcome, he might turn out to be a gem! :)

    cause gt budget so gd or nt still have to tk since the prices are cheap.hope he is a gem.will update again.

×