Everything posted by hippobb
-
MBR partition wall for WIW Aircon piping in pvc conduit in the partition... the aircon man actually wanted to run the pipes behind the built in wardrobe in the WIW ... I suggested to my ID/contractor guy about the possibility of running it across the 6inch thick false partition ...for future provision ie if there's any big small aircon issue I wont have to gut out my whole 9ft WIW.... also by running it this way.. the path of the aircon piping will be shorter too...
-
Day 28 June living room false ceiling up over the weekend dining hall false ceiling http://i480.photobucket.com/albums/rr161/h.../P1060200-1.jpg The partition man was setting up the partition wall for the full height cabinet at the foyer area when I popped by during lunch.. MBR ceiling partition structure
-
Congrats!! look forward to more pics!!
-
Hi Lynd3ralla, Thanks!! ... me and wifey loved the effect created by the mosiac tiles too! ... been busy sourcing for stuff for the house the past few days... will posts more pics when more is done... Hope u have a nice and smooth reno progress too... Cheers!!
-
Day 22 - June 22 Things starts to slow down liao since flooring completed... met contractor this morning and he says now will get to see lesser pple working cos tiling work is done... next will be electricall wiring and aircon installation New kitchen white powder coated windows installed this morning Electrical wiring started this morning... electrician asked what kind of switches I am using... big panel MK or Clipsal... wasnt too sure as we initially asked for clipsal and also the MK name sounds like some cheapo brand ... so sms contractor and he says MK switches will be nicer on the whole... so without thinking too much .. told electrician to use MK switches.. but later when I cameback home, I googled then realised that MK is actually more expensive then clipsal... so check with contractor if need to add $$ and he says no need... Wiring status just now
-
Day 21 - MBR & Balcony flooring completed.. MBR another view of my MBR view of balcony flooring
-
Kitchen's Runway mosaic up Closeup shot of mosaic...
-
Day 19 + 20 pics taken over the weekend... nothing much over the weekend... piping for electrical works started Dining hall flooring done Main Entrance's remaining tiles and mosaic up Common toilet shower area mosaic up mosaic closeup shot
-
Day 18 Morning Pics Common Toilet - The ugly water patches at the ceiling caused by upstairs neighbour's toilet cracked waterproof screed... my contractor says he will do up that area... Living hall morning view Entrance's walkway Walkway's tile flora motif design
-
btw got a quick qn... Does anyone know the diff between wet and dry cement tiles laying? I tot I heard this from my contractor today...
-
Day 17 nite ... Living hall tiles completed runway 90% complete left with balcony, partial MBR tiling and dining hall tiling... quite surprised that the tiling works progress is pretty fast...
-
Just went up to my hse to take a look.. met my contractor there busy coordinating piping & cabinets stuff with sub con... happy to see this ... cement for living rm laid and the tilers are ready to lay the tiles.... should be good tonite... Remember I mentioned about leaking ceiling problem when I started this reno .... went up at my hse cos HDB called and inform me that my upstairs neighbour's hse common toilet has been hacked and HDB asked if our common toilet ceiling needs any painting over.... Good thing that the ceiling leaking has now stopped after upstairs hacked their toilet cos my contractor plasterman had plastered my toilet ceiling and for the past few days the ceiling leaked and now my ceiling has unsightly patches... already tried to coincide with the hacking of upstairs toilet with my own reno but becos of HDB process it took 3 weeks before their work started... my tilers and plasterman mentioned to me that its dripping water like rain whenever upstairs takes a shower... will take some pics of my common toilet ceiling for all to see tonite when I goes up again...
-
walkway still partially completed Washer & Dryer based up ... tiles to be layed tmr..
-
Just came back from hse... tilers were pretty efficient ... here's some pics of the tiling works accomplished today Bedroom #1 tiling completed Storeroom tiling completed MBR tiling 1/3 completed MBR another view
-
Pics taken on Day 17 morning Bedroom #2 - morning Common toilet - repositioned entrance Common toilet - shower area conceal piping water outlet no visible pipes - conceal piping can be done if the piece of wall is a hacked and rebuilt wall will take more pics tonite... tiler told me last nite that they will be doing the other bedrooms today..
-
Day 16 of reno - Bedroom 2 tiles and skirting completed...
-
Kitchen Flooring partially done... cabinet base done another Kitchen pic MBR toilet - build up for shampoo bottles at the side wall
-
my partial runway...
-
kitchen debris cleared master toilet walled hacked to shift the entrance New tiles and building materials brought up to house after debris at dining hall was cleared
-
Kitchen hacked dining hall full of debris mess in the living hall
-
Hacking started on June 1st living hall hacked bedroom 2 hacked bedroom 1 hacked MBR hacked
-
mbr wardrobe bedroom 2 bedroom 1 kitchen
-
a glimpse of some pre-reno pics of my house living hall mbr mbr toilet
-
has been busy shifting out my parang parang and settling down at my mum's place.... Hacking finally started on 1st June!! hooray!! been monitoring the progress almost everyday and this morning when I checked, the new tiles, cement materials was already delivered and brought up to my place.. there's still quite abit of cupboard debris to clear off... think today should clear everything cos all hacking has been completed within 3 days will upload some hacking pics soon...
-
Thanks MickeyM!! I like ur MICKEY Mouse themed house... hee hee nicely done up!!!