Jump to content
Find Professionals    Deals    Get Quotations   Portfolios

headstomp

Members
  • Content Count

    146
  • Joined

  • Last visited

Everything posted by headstomp

  1. Painting Started, first Coat Family Area Living Area
  2. Kitchen sink surface smoothen Common Bathroom Pipe conceal Master bathroom Pipe conceal
  3. Holes for the Downlight in Living Area Dining Area Downlight Bedroom Downlight Stainless steel skirting for the Kitchen entrance Next updates...plastering and painting job will resume soon, HDB have approve the window for Balcony installation . Carpentry have started work. Fixing of accessories for Toilet will resume.
  4. Kitchen Sink Base Groove for frosted Glass Tiles done for the Dryer and Washing Machine
  5. Vanity wall in Master Bedroom Molding the Sink top Sink top fix on to the base
  6. Updates.... Lighting for whole house have arrived... Accessories for Bathroom Tap for Vanity in Master bedroom
  7. Yes it huge, burnt a big hole...we ever see a house that was partition to eight bedroom during house hunting and owner rent out all to foreign worker.
  8. Groove for the frosted glass Aircon trunking done for master and daughter room, run via Walk in Wardrobe
  9. Toilet Bowl, Washing basin Tiles all done plus skirting
  10. Updates.... The goods are here. Kitchen sink,toilet bowl, vanity, toilet accessories. My Huge Sink Bidet Master Bedroom vanity Tap Master bedroom washing basin pipe
  11. View From balcony toward living and Family area View from outside the Corridor And Finally Decided on the Kitchen Mixer
  12. Family Area False Ceiling Finally Box up done Master Bedroom False Ceiling done Skirting entrance to Dining Entrance to living via Balcony Living floor and Fridge Base Level
  13. And now the choosing of material for carpentry We choose the black granite top for kitchen and the white one for Vanity in common toilet and Vanity area. And for the Kitchen Cabinet surface Laminate for the Bedroom, on the right Door for main entrance, Teak Bedrooms Door For the Wardrobe in the 2 Bedrooms, Beige Ash
  14. Metal skirting for the door to the entrance of the dining area Wall facing the living area Here how the Kitchen Cabinet will look like Tv console feature wall
  15. ID did the height of the living area tiles to be align with Fridge and Cabinet Base. Floor tiles in the Balcony Vanity feature wall in the master Bedroom in Progress Recess area for storage
  16. Continue..Toilet Piping Dining and living floor tiles in progress
  17. Updates.... Water piping done to the rest of the home,kitchen, washer machine, both toilet. Washer machine and dryer area before boxing up the recess area. Ugly pipes
  18. Updates..... Fridge and Cabinet Base up Living Room floor tiles in progress after all the false ceiling is done, so less chance of the tiles be scratch or dirty The area where the CityGas dryer be hang, recess area cover up Before and after
  19. This was left off by previous owner,guess it 15 years old now.
  20. False ceiling in Family,Living, Dinning, Bedroom 1 & 2 done Backing for Vanity in the progress, behind the vanity will act as a storage area
  21. Updates... Gas pipe provision for CityGas Dryer, the pipe will be box up Location of stove Power point, testing after spraying the backing
  22. I never expect also. you should have seen how many people working at the same time
  23. Toilet wall and floor tiles View of living from the Balcony
  24. False Wall at Family Area Master bedroom false ceiling Cove lighting at Master Bedroom
  25. City Gas pipe run Bedroom 2 false ceiling Bedroom 1 false ceiling
×