Skip to content
View in the app

A better way to browse. Learn more.

RenoTalk.com ™

A full-screen app on your home screen with push notifications, badges and more.

To install this app on iOS and iPadOS
  1. Tap the Share icon in Safari
  2. Scroll the menu and tap Add to Home Screen.
  3. Tap Add in the top-right corner.
To install this app on Android
  1. Tap the 3-dot menu (⋮) in the top-right corner of the browser.
  2. Tap Add to Home screen or Install app.
  3. Confirm by tapping Install.

ahpooh

Members
  • Joined

  • Last visited

Everything posted by ahpooh

  1. We did not change the main the door but just asked contractor to laminate it.
  2. Master Bedroom's toilet
  3. Master Bedroom wardrobe: Bedroom 2 n 3: KDK M11SU ceiling fan in all 3 bedrooms:
  4. Somemore pictures: Common bathroom
  5. The mobile Island is movable in the kitchen. In case, we need more counter top space near the stove or oven. It will serve as an extra counter top.
  6. But the structure is bulit up by concrete blocks. If u look at my previous pic that I had post. You will get a better idea.
  7. Thanks. I always like the concrete top cause i am afraid of the wood might be damp n rotten when come in contact with water . That is y I make the concrete stove top. The garbage disposal is a grinder machine that helps to grind off those leftover stuff ( like food n small food particles ) that we pour into the sink so that in long term the pipe will not choke up.
  8. Yes. Have to have built in carpentry so that can have more storage space or to fit in the oven.
  9. This is a garbage disposal My moblie Island
  10. Our fujioh Oven, Hob n Hoods My faucet
  11. Our room's door Our kitchen:
  12. Finally, the house was handover to us but there are still outstanding glass works to finish. Pictures from our Living room: Our wrought iron gate; Our alter; Our TV console;
  13. Second bedroom Third bedroom
  14. False ceiling in Living room Master Bedroom
  15. A few weeks had passed. Tiling was 90% done already. Air-con, water heater, toilet bowl, common bathroom sink and mixer for both toilet were fixed up. Now electric wires n false ceiling are almost done and very soon painitng is going to start. So exciting!!!! Here are some of the photos on the electric wires and false ceiling: Living room Master bedroom
  16. Bathroom in Master bedroom
  17. Kid's bedroom (cont) Study room
  18. Common Bathroom Flooring: Living Room Master Bedroom Kid's Bedroom
  19. My concrete stovetop (cont)
  20. My concrete stovetop
  21. Uncle tiling the kitchen Common Bathroom Bathroom at Master Bedroom

Account

Navigation

Search

Search

Configure browser push notifications

Chrome (Android)
  1. Tap the lock icon next to the address bar.
  2. Tap Permissions → Notifications.
  3. Adjust your preference.
Chrome (Desktop)
  1. Click the padlock icon in the address bar.
  2. Select Site settings.
  3. Find Notifications and adjust your preference.