Everything posted by battle
-
My Ea @ Bedok - Mid May 2012
DAY 4, 19th May, Sat Meeting ID/contractor to inspect entire house original tiles... Saw a 师夫 doing cement work... Skillful, chop chop, 1 bathroom wall done... IMPRESS... :P ID/contractor arrived, started using the tool (the metal ball with handle).... knock knock, slide slide, tick tick tick tick tack tack tack tack tack tack....... :jawdrop: :jawdrop: Utility room.... tack tack tack tack ... ... MBR ... tack tack tack tack tack ... Bedroom 2 ... .. . tack tack tack tack... Bedroom 1 ... .. . tick tick tick Living room (1/2 covered by sand, can only check some parts) tick tack tack tack tick tack tack... Most of the place hollow :bangwall: Hollow at base cement layer. :bangwall: :dunno: :~ For both safety and peace of mind, no choice, entire house flooring will have to go :~ :deal: $$$$ fly ... ... ... Original back-up plan with my wife was : If after reno, flooring really looks bad, the most overlay with either Laminate or Vinyl. (but now it means 2 additional cost component - Hacking + Cement screed ) Bo-bian... No choice. got to :paint: $$$$ liao
-
My Ea @ Bedok - Mid May 2012
DAY 3, 18th May, Fri Primary hacking done. Placed cleared. Sand, Cement, Tiles etc. All in liao. Think should be able to view from this pix. I've done a horizontal line as a guide. You can see that the tiles have bloated up. Like a turtle back. Hollow at base cement layer. It happens over night. End of day 2, 0000hrs, its still flat (or maybe my wife and myself didn't notice). But the experienced hacker head called ID/contractor 7 early 8 early on this. Wonder if I should consider myself lucky or unlucky ? :huh: Lucky - it happens during reno period. NOT after we move in. If it happens 1 month, or 1 year later, nightmare :wacko: Unlucky - No choice but have to hack. :~ Means budget up up up.
-
My Ea @ Bedok - Mid May 2012
WoW... 5 years later upgrade to either EM or EA lar. ; p than will be nice nice + big big + sui sui :dancingqueen:
-
My Ea @ Bedok - Mid May 2012
Ai ya, no pillar create 1 lor. Lol
-
My Ea @ Bedok - Mid May 2012
Should be nice ley, how come end up didn't do ? For me, think I'll be keeping its shape. But since its between Kitchen & Living area, will be doing some form of feature area over there. Will need to re-search more & find pix, think still have 2 days to firm up. :wacko: Base on measurement on actual ground, it looks good. The bathroom is consider long enough (the length should be about 2.6m). But the basin can only get those max 600mm X 450mm type, bigger cannot liao, will clash with the WC. A little of a mental block for my wife in the beginning as people are used to see shower area at the most inner. For this, it will be in the middle. Actually it is our back-up plan. Just that now, it is a bigger scale back-up plan !!!... so means need to spend more $$$$. Not really technical hurdle, $$$ can solve. So for Andrew, think he might need to go HDB to re-do or change the reno permit. will need to extend the number of days of hacking ba. We will be going down for final inspection tomorrow morning to see the actual damages before deciding how massive we need to re-do. :ph34r: :wacko:
-
My Ea @ Bedok - Mid May 2012
Confirm LIAO. This pillar cannot be hacked. So will have to crack the creative brain Juice to see how to make this part nice nice liao :help:
-
My Ea @ Bedok - Mid May 2012
Ay, hopefully NOT. Think he is good at solving such challenging problems ; p (BTW, this morning another problem arise !!! AND it is a BIG headache problem. Will share more when I take pix :jawdrop: ) Oh. You mean current or future ? ; p Future, 4 of them + helper will be sleeping in BR 2, BR1 for MIL, MBR for me & wife lar
-
My Ea @ Bedok - Mid May 2012
Minor updates to my floor plan. (lost count of the version liao
-
My Ea @ Bedok - Mid May 2012
You will be out tomorrow :sport-smiley-004: Yes, I found my HAMMER :sport-smiley-004:
-
My Ea @ Bedok - Mid May 2012
If really can't bring down this pillar, will have to crack the brain to think of making it special liao. :bangwall:
-
My Ea @ Bedok - Mid May 2012
Kitchen Kitchen Kitchen Finally the wall have fallen :dancingqueen: Saw the pillar ? Hacker don't dare to bring it down, waiting for Andrew tomorrow morning to confirm (anyway, HDB approved, but this one solid, so they want to play safe :thumbs up: )
-
My Ea @ Bedok - Mid May 2012
DAY 2, 17th May, Thur Hack Hack Hack Hack Hack..... another Hacking day... MBR Bathroom - all gone Wonder why both Bathroom have this wall that bulge out :curse: And the bath tub ends up here :P
-
My Ea @ Bedok - Mid May 2012
:D that one yellow hammer.. :P This one blue hammer :good:
-
My Ea @ Bedok - Mid May 2012
Round 2 of Tiles & Laminate Selection
-
My Ea @ Bedok - Mid May 2012
HAMMER... I love it Meaning all these wall will be gone :sport-smiley-004:
-
My Ea @ Bedok - Mid May 2012
Common Bathroom - all gone
-
My Ea @ Bedok - Mid May 2012
Kitchen - Cabinet gone = Suay, pipes there, gone are some storage space :furious: Window grill gone Floor all gone
-
My Ea @ Bedok - Mid May 2012
MBR - Cabinet gone Utility Room - Cabinet almost gone Dining Area - cronies gone
-
My Ea @ Bedok - Mid May 2012
DAY 1, 16th May, Wed Hack hack hack hack..... Noisy day. Store in recess area gone BedRoom 2 - cabinet gone
-
My Dream Home@bk
lucky me, last time, mine all mixed liao, easily left for years and so far so good. Now all paint used up liao. some even paint tin got rusty and paint still ok :sport-smiley-004:
-
My Ea @ Bedok - Mid May 2012
Ai ya, visit people house must bring something mar, go empty handed not so nice lar ; p :sport-smiley-004:
-
My Ea @ Bedok - Mid May 2012
paisay... got limitation, each post can only put 5 image, so will have to split :sport-smiley-004: Later tonight will go take the naked pix :dribble: (hacked liao the pix)
-
My Ea @ Bedok - Mid May 2012
Ya lor, that's why have to arrange to drop by to his office, sit beside him do up, also to make sure check through to avoid missing out any items, else troublesome, re-do also waste time. Also this morning, I was there when he was instructing his contractor on doing the hacking work. Just to make sure they do the right thing as there are some area pretty last minute changes one, so best to make sure no missing items. Actually U did a lot, by asking him to 'Jiao Gor' already very good liao.
-
My Ea @ Bedok - Mid May 2012
Walkway into Common Bathroom Common Bathroom
-
My Ea @ Bedok - Mid May 2012
Utility Room Kitchen (View from entrance) Kitchen (View from inside end)