  1. Hi Bro,

    I would like to purchase 3 Ceiling Fans for my 3 bedrooms. Not sure which Fans to buy. Preferably larger blades so that the air can be circulated around the room.

    The fans should come with LED Bright Lights.

    As the rooms are small i need to move my existing lights to cater for the fans to be in the center.

    Not sure whether the Fans will obstruct the ceiling lights.

    I am a bit confused.

    Appreciate can help me on this.

    Regards,

    Oruvan


  2. Hi,

    I will be getting my keys before May 2012 & would like to renovate my 4 room flat. I would like to redo the Kitchen & both the toilets plus carpentary work for Master Room & Living Room.

    Can pass me the ID contact details

    My e-mail is oruvan71@gmail.com

    thanks

    Regards,

    Oruvan


  3. Hi all, first time renovating.

    Do you guys mind helping me review the quote below. Many thanks.

    Demolish Works

    1. To demolish the existing wall between kitchen & main entrance c/w cement screed. ($450)

    2. To hack off portion floor tiles & re-tiles between kitchen & main entrance. ($300)

    3. Professional engineer (Fee) ($400)

    Construct Works

    1. To construct shower kerbing at Master toilet c/w tiles. ($150)

    2. To construct cabinet base c/w tiling & cement screed at Kitchen. ($260)

    Tempered Glass Works

    1. To supply & install L 2ft H 6ft fixed (clear) Tempered glass at Master toilet. (10mm). ($320)

    2. To supply & install 2 fixed (clear) Tempered glass at Kitchen entrance. (10mm). ($780)

    3. To supply & install 1 sliding (clear) Tempered glass at Ktchen entrance. (10mm). ($420)

    Ceiling Works

    1. To supply & construct design L-Box light holder cw false ceiling Living & Dining Hall. ($900)

    2. To supply & construct false ceiling at passage way. ($360)

    3. To supply & construct design L-Box light holder c/w false ceiling at Master bedroom. ($580)

    4. To supply & construct L-Box for curtain Master room window. ($150)

    Carpentry Works - Kitchen

    1. To supply & fabricate L 101/2ft Bottom Kitchen cabinet selected laminated finish

    & ABS door trimming (L Shape). ($1200)

    2. To supply & fabricate L 141/2ft Top Kitchen cabinet selected laminated finish

    & ABS door trimming. ($1600)

    Solid Surface Works

    1. Fabricate full set solid surface table top to Kitchen worktop only size 101/2ft (L)

    x 600mm (D) (L Shape). ($750)

    MASTER ROOM

    1. To supply & fabricate full height L 10ft sliding door wardrobe selected laminate

    finish ABS trimming. ($2400)

    2. To supply & fabricate L 2ft dressing table c/w clear mirror. ($300)

    3. To supply & fabricated Built in vanity cabinet c/w swing door selected laminate

    finish ABS door trimming. ($280)

    4. To supply & fabricate toilet display cabinet c/w mirror swing door complete set L5ft. ($650)

    Living & Dining Hall

    1. To supply & fabricate L3ft(waist level)shoe rack cabinet bottom small gar for ventilation

    selected laminate finish ABS door trimming. ($400)

    Painting Works

    1. To supply labour & material painting whole house wall & ceiling. ($1350)

    Master room, Bedroom 2 & Bedroom 3.

    Kitchen & 2 toilet ceiling.

    Metal door frame

    Whole house painting - colour 4 only.

    Total $14000

    Payment terms :

    (1st Payment) 10% deposit

    (2nd Payment) 40% upon hacking work starts

    (3rd Payment) 30% progressive payment upon completion of cement works

    (4th Payment) 15% complete of painting work

    (Final Payment) 5% final payment upon completion and defect rectification.

    Thanks for viewing.

    Hi,

    I intend to renovate my house as per yours.

    can let me know the contractor details. Appreciate you can e-mail me his details.

    oruvan71@gmail.com

    Thanks

    Oruvan


  4. p1040251i.jpg

    Selecting this tile design was the reason why the cost went over $900.

    p1040252b.jpg

    Hi,

    can you give me the tier guy who help you in the renovation work. I really like your design. I would like to do both my toilets & kitchen.

    Appreciate you can give the contact

    Regards,

    Oruvan


  5. Hi Tiler Seng,

    I will be getting my keys before May 2012 & would like to renovate my 4 room flat. I would like to redo the Kitchen & both the toilets plus carpentary work for Master Room & Living Room.

    Can let me know hhow much the cost will be? Can let me know your contact details?

    thanks

    Regards,

    Oruvan

×