

filetofish
Members-
Content Count
69 -
Joined
-
Last visited
Content Type
Profiles
Forums
Gallery
Everything posted by filetofish
-
Kitchen with cabinets (work-in-progress) MBR toilet with vanity shelves - the height is a bit low though... about 34 inches high.
-
Day 36 - Carpentry has arrived! Lightings are installed! Shoe cabinet at the main door (still work-in-progress) Living room with TV console
-
Currently on the lookout for reliable movers to move my king-size bed and exercise cross-trainer...
-
ID explained that the box-up was done this way because the water heater was installed a little too high. I was like "Y u no come down to tell Citygas exactly where to install it??!" Aren't IDs supposed to ensure such things are done properly? My expectation too high?
-
Here's the sketch of how the air-con trunking will be covered up.
-
Day 34 - Delivery of kitchen sink, washer, dryer, fridge, hob, hood. No progress on renovation this week as the carpenter came to take measurements for the carpentry. Next few days going to be exciting... (fingers-crossed that carpentry will go well) Goods have arrived Living room area looks a bit cleaner
-
Bedrooms passageway with box-up and false ceiling
-
Day 26 - Playing "Spot the Difference" Living room false ceiling Kitchen pipes boxed-up
-
The MBR air-con trunking not nice... must cover up...
-
Day 20 - Wirings were done up by eletrician, replaced kitchen windows, installed air-cons Hanging wires Kitchen windows were replaced Air-con installed
-
Water heater Replaced common bathroom window Replace MBR bathroom window
-
Day 18 - Commenced painting in living room and kitchen, installed gas pipes and heater, and replaced bathroom windows. Installed gas pipes gas pipes for stove
-
Went to JB yesterday to buy all my lights from Tampoi Lightings. The prices were around 50% cheaper there! Came back with my car fully loaded up...
-
Electrical plan
-
Day 12 - Completed skirting board in living room and progressed in common bathroom grouting
-
Wow, the tiler corrected drain location in 1 day!
-
This is the common bathroom. The drain at the shower area is not where I specified it to be. I want it to be at the corner so that when I shower, I won't be stepping on it. I've given the feedback to my ID and he said he'll get it corrected.
-
Day 11 - Completed tiling in living room MBR tiles are worsening... ID is considering to fill up the tile-less area with cement.
-
Day 10 - Completed tiling for kitchen floor, MBR bathroom wall tiles grout, and progress on tiles skirting board. Kitchen floor tiling completed MBR bathroom wall tiles grouting completed Skirting board in progress Flooring condition of the 2 common bedrooms are fine to overlay with laminate
-
Day 9 - Progress on MBR bathroom wall and floor tiles, common bathroom wall tiles and kitchen floor MBR bathroom wall and floor tiles Common bathroom wall tiles Kitchen floor
-
I've scheduled to meet my ID tomorrow. I really hope he gives me a satisfactory response on how he's going to resolve the flooring.
-
Good point... I noticed that the tiles in my MBR are in a bad condition (i.e. some tiles came off and some have popped-up). I better check with my ID asap on what's he going to do about it... The other 2 bedrooms look fine but I'll do a more detailed check...
-
Yes, kitchen is level with the living room. By the way, the existing floor tiles in my bedrooms will be overlaid with Laminate flooring.. which will level with living room too!
-
Thanks for your advice. I'll be knocking on each of the tiles to listen out for hollowness.
-
Day 8 - Tiling progress to living room Kitchen with wet patches... wonder what they're doing...