Jade Spring @ Yishun By Wawe Design
Kitchen island and stove cabinet Selected design and laminates
-
Jade Spring @ Yishun By Wawe Design
Kitchen Selected design and laminates
-
Jade Spring @ Yishun By Wawe Design
Living room false ceiling Rough look and feel after paint colors and furniture selection
-
Jade Spring @ Yishun By Wawe Design
Common toilet Selected design and laminate
-
Jade Spring @ Yishun By Wawe Design
* 3D Drawings done by Wee Kuang. Free of Charge ! Bedroom 2 Selected design and internal compartments
-
Jade Spring @ Yishun By Wawe Design
Hi all, Finally renovation coming to an end, furniture coming in next monday 28 May 2012. Carpentry almost completed and the only major item left will be glass/mirror works. Sorry for the long delay as carpentry works have a few hiccups here and there. Really grateful for my carpenter for doing all the rectifications. Renovation is really not an easy work, really glad that it is ending soon. Pictures coming soon.
-
Jade Spring @ Yishun By Wawe Design
Hi, So sorry, been too busy with work and do not have the time to update my renovation progress. Never even realized that photos cannot be viewed. Am trying to change all my pics to imageshack site. Thanks.
-
Jade Spring @ Yishun By Wawe Design
Hi, I got it at $1.1K. No choice, wife likes it.
-
Jade Spring @ Yishun By Wawe Design
* Toilet accessories Not forgetting this big thing * Thats all for now coz not much physical work done, for the past 2 weeks are 3D confirmations. Will try to post some of the designs Wee Kuang drew for me as well as my confirmation. Crossing fingers for my actual carpentries.
-
Jade Spring @ Yishun By Wawe Design
* Lightings My favourite - Island lightings with remote control
-
Jade Spring @ Yishun By Wawe Design
* Lightings on Cove lights still need some fine tuning Foyer Kitchen
-
Jade Spring @ Yishun By Wawe Design
* Lightings Bedrooms Toilets Master toilet Master bedroom passageway
-
Jade Spring @ Yishun By Wawe Design
* All set for lights installation My downlights Kitchen Service yard Bomb shelter
-
Jade Spring @ Yishun By Wawe Design
* Next is painting and laminate floorings Master bedroom with platform
-
Jade Spring @ Yishun By Wawe Design
* Patching
-
Jade Spring @ Yishun By Wawe Design
* False ceiling on the way * Master bedroom island false ceiling * Hacked kitchen patching
-
Jade Spring @ Yishun By Wawe Design
* Completed cemend screed for bedrooms
-
Jade Spring @ Yishun By Wawe Design
* Master bedroom electrical, last minute inject for the electrician * HDB cement screed before my laminated flooring from Supreme
-
Jade Spring @ Yishun By Wawe Design
* Electrical Downlights and covelights arrangements? -
-
Jade Spring @ Yishun By Wawe Design
* Tiling
-
Jade Spring @ Yishun By Wawe Design
* Started hacking work Kitchen entrance hacked, open concept * Followed by tiling * Not forgetting my shower kerb at common toilet
-
Jade Spring @ Yishun By Wawe Design
Progress update 03 May 2012 - Day 37 * 3D finally confirmed and carpentries fabrication in progress. Hopefully can see something next week. Renovation pictures
-
Jade Spring @ Yishun By Wawe Design
Will upload the renovation progress pictures later on.
- Jade Spring @ Yishun By Wawe Design