Skip to content
View in the app

A better way to browse. Learn more.

RenoTalk.com ™

A full-screen app on your home screen with push notifications, badges and more.

To install this app on iOS and iPadOS
  1. Tap the Share icon in Safari
  2. Scroll the menu and tap Add to Home Screen.
  3. Tap Add in the top-right corner.
To install this app on Android
  1. Tap the 3-dot menu (⋮) in the top-right corner of the browser.
  2. Tap Add to Home screen or Install app.
  3. Confirm by tapping Install.

ptc77

Members
  • Joined

  • Last visited

Everything posted by ptc77

  1. Study Table (Completed Photo) With Top Cabinet (Design with open shelf at bottom corner)
  2. Next- Feature Wall with tv console In Progress
  3. Next- Shoe Cabinet In Progress (where in the far end, you can see that the PD box area will be concealed within the cabinet) Excellent idea from my wife, good works from ID for being able to transform our idea into reality. Internal Shelving (PD Box Area) Left Picture: Notice the extra shelf given at bottom, every space is fully make use of. Right Picture: Bottom for our shoes, Top are adjustable shelves for storage Open Shelf with light switches Thoughful of my ID to make full use of the cabinet side area at kitchen with open shelves & centralise of light switches in one (Kitchen, Service Yard & Cabinet Spot Light) Exterior Look when completed (Note the minimum gap design when doors are closed) Our verdict: The shoe cabinet is simple, nice & practical..Thumbs Up.. By now, you should know which 3D design selection we opt for..
  4. The land plot opposite is Landed Estate ,Luxus Hill with 999-year Leasehold.
  5. Window scenery (Sunset) from Living Room Window scenery (Evening) from Service Yard
  6. Next, toilet makeover.. Before After (w/o granite Table)
  7. Bedroom Cabinet (Completed Photo) As our ceiling height is 2.8m from ground, when choosing laminate with grains lines may result in matching issue at joint line as lamiante is standard 8 feet long.
  8. Next Bedroom Cabinet in progress- (We prefer Sliding Door Design) Internal shelving arrangement are according to our likes Well, if you need additional shelf or require the shelf height to be adjustable, it must be communicate to ID before wood work starts. Bedroom 2 Bedroom 3
  9. Next Master Bedroom Cabinet - Completed Photos We love the laminate design and storage space given! For such L-shaped design, ID proposed to do casement doors for ease of everyday usage.
  10. Kitchen carpentry completed exclude granite top
  11. Making of Kitchen Cabinet in progress- Wife prefer all white design concept, make the kitchen looks bright and spacious..
  12. Next up will be the most existing part of reno project:- Discussion and finalise on cabinet carpentry design on exterior & interior, making choice for the laminate selection for the cabinet For this, my ID is able to advice & provide valuable advice based on our home theme and requirement. Of course, we do our homework too by showing him the pictures from home magazine read and info gathered. My ID will then explain the pro & con of such ideas made, the suitablity and importantly mention any extra charges if to make accordingly to our ideas To me , the hardest part is the laminate selection. One wrong decision will affect the entire outlook hence the 3D design plays a important part. So are the internal shelving of the cabinet. The catalogue from EDL have many selection to choose from but must be mindful of the different price range. Top up is usually required if special laminate is used
  13. Completed Aircon Installation
  14. My ID advice me to look at long term. Indeed, it was a piece of good advice, really well worth the decision made after i saw the trunking were concealed the very next day. Very prompt arrangement done. Else i really cannot imagine looking at the ugly trunking when walking pass the passageway everyday. Living Room MBR
  15. 1 particular area where i need to make a decision on whether the trunking under pillar for living room & MBR should be covered up. It were rather stressful when both the installer & ID waiting for my answer as the end trunking will be laid accordingly to the outcome. To me its all about cost vs appearance Living Room MBR
  16. Next .. aircon purchase & installation .. i source directly to Tim Wong (Advertiser at renotalk) for his known good services. 2 trips have been arranged. 1st trip to work out and lay the piping & trucking. 2rd trip to install the condenser & compressor. As like any new owner, i have no clue on how the piping & trucking should be placed. Fortunately, my ID willingly offered his help despite i did not buy the aircon from him. With him around, i were able to sit back, relax and watched him working out the details with the aircon installer. Lucky me. Otherwise it wll be a uphill task for me.
  17. Scenery view from home window Living Room (We call it ''Billion Dollar View'' judging from the cost per unit) MBR Service Yard
  18. Next up will the window grill where i source directly to Andy. I make arrangement with him over few weekend to take site measurement & installation. If given a chance, i will let my ID handle this portion to be hassle free. Very time consuming as you got to do your own coordination with the supplier subject to his availability in particular if it's a weekend appointment. If for any problem, you will need to liaise directly with the supplier instead of rely on your ID who will arrange & rectify the issues for you. As expected, few issues after the installation done, i make few arrangement to rectify.. :curse:tiring.. Overall the service & products by Andy is rated good. . Grill with 3 panel Window glass
  19. Followed by painting jobs using Nippon paint 5000 after selection from the given catalogue Spot check whether all using nippon paint.. Even ceiling painting using Nippon Paint..
  20. Completed false ceiling & L-box with wiring conceal
  21. With the completion of electrical wiring, arrangement to install false ceiling and L box will be next by my ID
  22. Within a week, electrical wiring arranged by ID , you can still change your mind on the lightings position as this stage.. but need to act fast and inform ID ASAP
  23. As the reno progress, level up to light wiring discussion with the help of ID expertise, the electrical-in-charge as like others will hand stretch his masterpiece art on the wall.
  24. For hacking that wall require HDB approval and PE fee. Thankfully, it was approved within a week after ID submit the request. The end result Let there be brighter light & strong wind...
  25. To achieve the modern look, wife and ID proposed 3 things Conceal PD box as it looks odd & unsightly Hacking of wall between service yard & kitchen Both toilet basin to be replaced with top & bottom vanity

Account

Navigation

Search

Search

Configure browser push notifications

Chrome (Android)
  1. Tap the lock icon next to the address bar.
  2. Tap Permissions → Notifications.
  3. Adjust your preference.
Chrome (Desktop)
  1. Click the padlock icon in the address bar.
  2. Select Site settings.
  3. Find Notifications and adjust your preference.