Jump to content
Find Professionals    Deals    Get Quotations   Portfolios

Bryan23

Members
  • Content Count

    1
  • Joined

  • Last visited

Community Reputation

0 Neutral

About Bryan23

  • Rank
    Newbie

Previous Fields

  • Gender
    Male
  1. Hi, The below is the quote I receive for 3 br executive condo. Which means kitchen, toilets, all wardrobes and flooring are already done up. Just wondering if the below are consider reasonable? Thanks! Professional Interior Designing & Services Includes: A Design Concept Consultation IncludedB Space Planning & Furniture Layout Plan Proposal IncludedC Furnishing Consultation IncludedD 3D Computerized Perspective Drawing IncludedE Materials & Colour Scheme Proposal IncludedF Hassle-free ISO formatted Project Management & Site Supervision & Audit IncludedG 1 Years Warranty With Guarantee Services Backup Included Living & Dining 01. Supply materials & labour to install False Ceiling **** & Dining. 1,300.00$ 02. Supply materials & labour to install Cove Light Pelmet **** & Dining. 350.00$ 04. Supply materials & labour to install L 9Ft x Full Height TV Feature Wall using fiber board ****. 900.00$ 05. Supply materials & labour to install L 11Ft x Full Height Feature Wall in laminate finish. 2,420.00$ 06. Supply materials & labour to install L 3Ft x Full Height Shoe Cabinet c/w soft close machanism in laminate finish & white PVC ****. 900.00$ 07. Supply materials & labour to install L 8Ft Laminate Light Box at TV Feature Wall. 640.00$ Master Bedroom 01. Supply materials & labour to install False Ceiling at Master Bedroom. 650.00$ 02. Supply materials & labour to install Cove Light Pelmet at Master Bedroom. 180.00$ 03. Supply materials & labour to install L 4Ft x Full Height TV Feature Wall in laminate finish at Master Bedroom. 880.00$ 04. Supply materials & labour to install Tempered Glass Shelve at TV Feature Wall. 160.00$ Utility Toilet 01. Supply labour to remove existing Toilet Bowl & Wash Basin at Utility Toilet. 200.00$ 02. Supply materials & labour to Construct Washing Machine Base at Utility Toilet.(not including tiles) 250.00$ 03. Supply materials & labour to hack off existing wall tiles & lay tiles at removed basin effected area. 320.00$ (not including tiles) Miscellaneous 01. Supply materials & labour to Paint Whole House Ceiling & Wall using Nippon emulsion paint. 1,200.00$ 02. Provide general cleaning for whole unit upon Renovation completion 250.00$ 03. Provide laying of corrugated cardboard protection to protect exiting furniture & flooring. 250.00
×