  1. Hi, can anyone quote me Mitsubishi Inverter system 4 (new model, 18kbtu + 10kbtu X 3) and (24kbtu + 10kbtu x 3)

    Or

    Model : MXY-3A28VA (this is compressor is for system 3 but i use it for 2) / MSY-GE10VA / MSY-GE13VA
    Model : MXY-3A28VA (this is compressor is for system 3 but i use it for 2)/ MSY-GE10VA / MSY-GE24VA
    Model : MXY-3A28VA / MSYGE18VA

    2 trips installation?

    Armaflex Class “O” 1/2 inch thick insulation?

    G23 Copper Pipe?

    Kkeystone Flexible Wire Cable ?

    16mm drainage pipe?

    Warranty ?


  2. Haha... So far no ppl bother to reply or PM me.

    I also wan to ask the prices for the below :-

    Model : MXY-3A28VA (this is compressor is for system 3 but i use it for 2) / MSY-GE10VA / MSY-GE13VA

    Model : MXY-3A28VA (this is compressor is for system 3 but i use it for 2)/ MSY-GE10VA / MSY-GE24VA

    Many thank


  3. Anyone got good or reliable electrician to intro? I need them to quote me for my new BTO flats !!

    1) Lighting Point

    2) 13A Single Power Point

    3) 13A Double Power Point

    4) 13A Single changes to 13A Double Power

    5) SCV Point

    6) Heater Point

    7) Cooker Hood & Hob

    8) Microwave Point

    9) 2-Way switch

    10) Re-location of lighting point (within 10ft)

    11) Re-location of data point (within 10ft)

    12) Re-location of power point (within 10ft)

    13) Re-location of telephone point (within 10ft)

    14) Re-location of SCV Point (within 10ft)

    15) Installation of downligh, wall light, ceiling light

    16) Installation of Hanging Light

    17) Installation of Ceiling fan with light

    18) Installation of door bell

    19) Concealed work

    If you have any please PM me.


  4. Anyone got good or reliable electrician to intro? I need electriician to do my new BTO flats !!

    1)Lighting Point

    2)13A Single Power Point

    3)13A Double Power Point

    4) 13A Single changes to 13A Double Power

    5) SCV Point

    6) Heater Point

    7) Cooker Hood & Hob

    8) Microwave Point

    9) 2-Way switch

    10) Re-location of lighting point (within 10ft)

    11) Re-location of data point (within 10ft)

    12) Re-location of power point (within 10ft)

    13) Re-location of telephone point (within 10ft)

    14) Re-location of SCV Point (within 10ft)

    15) Installation of downligh, wall light, ceiling light

    16) Installation of Hanging Light

    17) Installation of Ceiling fan with light

    18) Installation of door bell

    19) Concealed work


  5. Sorry Guys,

    Can anyone advise me the below the electrical work prices for new BTO?

    Lighting Point 13A:

    Single Power Point: 13ASingle Power Point (Water Proof):

    13A Double Power Point Replacement of Singel to Double Power Point:

    SCV Point:

    15A Isolator Air-con Point:

    Heater Point:

    Heater Wiring Cooker Hood, Hob and Oven Point:

    Telephone Point:

    Door Bell Point:

    Data Point Cat 6 / Camera Point Speaker Point:

    2-Way Point Drimmer Control:

    Re-location of lighting point (within 10ft):

    Re-location of data point (within 10ft):

    Re-location of power point (within 10ft):

    Re-location of telephone point (within 10ft):

    Re-location of SCV Point (within 10ft):

    Installation of downligh, wall light, ceiling light:

    Installation of Hanging Light:

    Installation of Ceiling fan:

    Installation of Ceiling fan with light:

    Installation of door bell:

    Concealed work:


  6. Good day All,

    Can anyone advise me the below the electrical work prices for new BTO?

    Lighting Point 13A Single Power Point 13A Single Power Point (Water Proof) 13A Double Power Point Replacement of Singel to Double Power Point SCV Point 15A Isolator Air-con Point Heater Point Heater Wiring Cooker Hood, Hob and Oven Point Telephone Point Door Bell Point Data Point Cat 6 / Camera Point Speaker Point 2-Way Point Drimmer Control Re-location of lighting point (within 10ft) Re-location of data point (within 10ft) Re-location of power point (within 10ft) Re-location of telephone point (within 10ft) Re-location of SCV Point (within 10ft) Installation of downligh, wall light, ceiling light Installation of Hanging Light Installation of Ceiling fan Installation of Ceiling fan with light Installation of door bell Concealed work

    Many thank :-)


  7. Hi everyone,

    Anyone purchase Ceiling Fan, Lighting (Downlight, Ceiling Light, T5), Kitchen and toilet accessory from Malaysia?

    How is the prices like?

    Can i have the address (Cheap and Good Shop)?

    So far i saw some address from other group chat:-

    YES electrical
    22, Jalan Serampang, Taman Pelangi, 80050, Johor Bahru, Johor, 80050, Malaysia

    Light from Tampoi lighting
    Local Business
    No.2,4 & 6, Jalan Titiwangsa 3/1,
    Taman Tampoi Indah (Batu 6 1/2, Jalan Skudai),
    Johor Bahru

    StarWorld lighting
    No. 28, Jalan Titiwangsa 3/1, Taman Tampoi Indah, Johor Bahru, Johor, 81200

    Water filter from Jusco bukit indah

    Kitchen and toilet accessory from Aldeco Living
    Sutera Mall
    No. L3-205 & 206,
    Taman Sutera Utama,
    81300 Skudai,
    Johor Bahru, Johor

    Many thank in advance :-)

    • Like 2

  8. Can anyone expert/experince frenz advise me the below quotation :-

    Masonry Works

    1 Construct main entrance kerb $ 38.00

    2 Supply & lay (60 x 60)cm glazed/matt homogeneous floor tiles at foyer, living/dining & passageway $ 2,640.00

    3 Supply & lay glazed/matt homogeneous skirting at foyer, living/dining & passageway $ 420.00

    4 Supply & lay (60 x 60)cm glazed/matt homogeneous floor tiles at 3 bedroom $ 3,180.00

    5 Supply & lay glazed/matt homogeneous skirting at 3 bedroom $ 530.00

    6 Construct cement motar kitchen cabinet base with side skirting. $ 300.00

    7 Construct cement motar tall unit cabinet base with side skirting $ 60.00

    8 Construct fridge base c/w tiles finish $ 150.00

    9 Construct washing machine base c/w tiles finish $ 150.00

    10 Construct shower kerb at master bathroom $ 150.00

    Plumbing Works

    1 Install outlet drainage pipe for sink, washing machine. $ 100.00

    2 Provide labour to install 1 no of wash basin & tap . $ 160.00

    3 Provide labour to install 2/3 nos each bath rm accessories set at 2 bathrooms. $ 1 20.00

    4 Provide labour to install kitchen sink & tap. $ 1 00.00

    5 Provide labour to install 1 no storage heater $ 120.00

    D Electrical Works

    1 Electrical wiring & fitting form as attached. (est) TBA

    E Ceiling Works

    1 Supply & install design false ceiling at foyer, living/dining & passageway $ 1,150.00

    2 Supply & install curve cove lighting at foyer, living/dining & passageway $ 1,380.00

    3 Supply & install design false ceiling at master bedroom $ 450.00

    4 Supply & install design cove lighting at master bedroom $ 340.00

    F Aluminium & Glass works

    1 Supply & install PD door c/w glass panel at kitchen entrance $ 550.00

    2 Supply & install 5mm thick bronze mirror dining feature wall $ 930.00

    3 Supply & install 5mm thick clear mirror beside shoe cabinet FOC

    4 Supply & install aluminium sliding window at service yard $ 580.00

    5 Supply & install 10mm thick 1 fixed 1 slide door at master bathroom $ 600.00

    G Plaster & Paint Works

    1 Paint internal walls & ceiling using Nippon Paint for whole unit (5 +1) colours $ 1,200.00

    H Carpentry Works (Inclusive of soft closing for all casement door)

    Foyer

    1 Design & fabricate full height shoe cabinet c/w settee in laminate finish $ 1,480.00

    Approx size: 1500mm (L) x 450mm (D) x 2590mm (H) -

    Living

    2 Design & fabricate suspended round edge TV console in laminate finish $ 1,610.00

    Approx size: 2100mm (L) x 500mm (D) x 2590mm (H) -

    Kitchen (Package)

    3 Design & fabricate L10ft btm kitchen cabinet in laminate finish $ 3,888.00

    4 Design & fabricate L10ft top kitchen cabinet in laminate finish

    5 Supply & install L10ft quartz kitchen worktop c/w front profile & back splash

    6 Additional 7ft extended kitchen cabinet $ 1,030.00

    7 Additional 7ft extended kitchen worktop $ 1,260.00

    8 Design & fabricate L2ft tall unit cabinet in laminate finish $ 780.00

    Master Bedroom

    9 Design & fabricate L9ft full ht casement door wardrobe in laminate finish c/w mirror $ 2,560.00

    Master Bathroom

    10 Design & fabricate L2.5ft top & btm vanity cabinet in laminate & mirror finish $ 850.00

    11 Supply & install L2.5ft & D2ft c/w back splash & front profile 20mm thick quartz kitchen work top. $ 450.00

    12 Supply & install L2ft tall hung storage cabinet in laminate finish $ 380.00

    I Misc items

    1 Haulage,sand & debris removal services Main Con

    2 Dismantle existing wash basin at master bathroom Main Con

    3 General cleaning to whole unit & chemical washing at kitchen, master bath, common bath $ 250.00

    4 Laying of corrugated paper for floor protection $ 160.00

    Special Discount $ (1,296.00)

    Total cost for the above mentioned requires $ 28,800.00