  1. Hi Guys,

    I need your professional help and advice on my below quotation if it's expensive...

    I'm doing the 2 toilets(complete reno), the kitchen(complete reno), living room(minor) , master bedroom(minor), the other 2 rooms (untouched, just some cleaning & painting).

    Preliminaries
    1 HDB Permit or Renovation Deposit if any -- F.O.C
    2 To provide labour / material for Acid Cleaning to whole house -- $ 200.00
    3 To lay corrugated paper for floor protection to Whole House -- F.O.C
    4 Clearing of Debris,Supply of Sand,Upload of materials -- $ 400.00
    Demolition Works (Total $2,300)
    1 Supply labour to demolish existing kitchen floor & wall tiles
    2 Supply labour to demolish existing kitchen cabinet & sink
    3 Supply labour to demolish existing floor tiles & wall tiles for 2 bathrooms
    4 Supply labour to demolish existing WC & basins at 2 bathrooms
    5 Supply labour to demolish existing bi-fold doors at 2 bathrooms
    6 Supply labour to demolish existing pipings for whole house
    7 Supply labour to demolish existing doors for whole house
    Living / Dining
    1 Custom made 7ft full height feature wall c/w laminate finish (Designer pieces) -- $ 1,400.00
    2 Custom made 7ft TV console c/w black glass drawers,ABS trimming,laminate finish -- $ 980.00
    3 Custom made L4ft xH4ft shoe cabinet c/w casement door, ABS trimming & laminate finish( both sides laminate) -- $ 760.00
    4 Custom made 2ft settee c/w drawers, ABS trimming & laminate finish -- $ 400.00
    5 Supply labour & material to install false ceiling & L-box -- $ 1,800.00
    Main Bedroom
    1 Supply labour & material to construct storage platform c/w casement door,ABS trimming & hydraulic hinges (2.7m x 2.9m) -- $2,790.00
    2 Custom made 7ft full height wardrobe c/w casement door, ABS trimming, laminate finish -- $ 1,750.00
    Master Bathroom
    1 Supply labour & material to cement screed wall -- $ 800.00
    2 Supply labour & material to lay Heavy Duty Matt Homogenous floor tiles ( $3.00 ) per sqft 300mm x 300mm -- $ 550.00
    3 Supply labour & material to lay 2 layers of K11/104 water-proofing membrane -- $ 100.00
    4 Supply labour & material to construct shower kerb -- $ 100.00
    5 Supply labour & material to install 10mm tempered glass shower screen c/w swing door -- $ 550.00
    6 Supply labour & material to install PD door -- $ 350.00
    7 Supply & install stainless steel piping (cold ) -- $ 300.00
    8 Supply labour to install standard WC -- $ 100.00
    9 Supply labour to install standard basin c/w tap -- $ 70.00
    10 Supply labour to install biget spray -- $ 40.00
    11 Supply labour to install all toilet accessories -- FOC
    12 Supply labour to install instant heater -- $ 60.00
    13 Supply & install new pvc floor trap -- FOC
    14 Supply labour & material to install toilet lourve -- $ 350.00
    15 Custom made 2.5ft vanity cabinet c/w casement door, ABS trimming,laminate finish & solid surface top -- $ 575.00
    16 Custom made 2.5ft mirror cabinet c/w casement door, ABS trimming,laminate finish -- $ 450.00
    Common Bathroom
    1 Supply labour & material to cement screed wall -- $ 800.00
    2 Supply labour & material to lay Heavy Duty Matt Homogenous floor tiles ( $3.00 ) per sqft 300mm x 300mm -- $ 550.00
    3 Supply labour & material to lay 2 layers of K11/104 water-proofing membrane -- $ 100.00
    4 Supply labour & material to construct shower kerb -- $ 100.00
    5 Supply labour & material to install 10mm tempered glass shower screen c/w swing door -- $ 550.00
    6 Supply labour & material to install PD door -- $ 350.00
    7 Supply & install stainless steel piping (cold ) -- $ 300.00
    8 Supply labour to install standard WC -- $ 100.00
    9 Supply labour to install standard basin c/w tap -- $ 70.00
    10 Supply labour to install biget spray -- $ 40.00
    11 Supply labour to install all toilet accessories -- FOC
    12 Supply labour to install instant heater -- $ 60.00
    13 Supply & install new pvc floor trap -- FOC
    14 Supply labour & material to install toilet lourve -- $ 350.00
    15 Custom made 2.5ft vanity cabinet c/w casement door, ABS trimming,laminate finish & solid surface top -- $ 575.00
    16 Custom made 2.5ft mirror cabinet c/w casement door, ABS trimming,laminate finish -- $ 450.00
    Kitchen
    1 Supply labour & material to cement screed wall -- $ 1,400.00
    2 Supply labour & material to lay Heavy Duty Matt Homogenous floor tiles ( $3.00 ) per sqft 600mm x 300mm -- $ 1,300.00
    3 Supply labour & material to lay 2 layers of K11/104 water-proofing membrane -- $ 100.00
    4 Supply labour & material to construct cement mortar base for fridge c/w full tiling -- $ 80.00
    5 Supply labour & material to construct cement mortar base for washing machine c/w full tiling -- $ 80.00
    6 Supply labour & material to construct cement mortar base for kitchen cabinet c/w side tiling -- $ 300.00
    7 Custom made 8.5ft bottom kitchen cabinet c/w casement door,ABS trimming, laminate finish -- $ 1,020.00
    8 Custom made 8.5ft top hung kitchen cabinet c/w casement door,ABS trimming, laminate finish -- $ 1,020.00
    9 Custom made 8.5ft solid surface top for kitchen c/w 50mm backsplash & front profile -- $ 725.00
    10 Custom made 2ft full height cabinet c/w drawers,ABS trimming, laminate finish (tall unit) -- $ 720.00
    11 Supply labour to install kitchen sink and appliances -- $ 80.00
    12 Supply labour & material to install 1 no. dish rack & cutlery tray -- FOC
    13 Supply & install exposed stainless steel piping ( cold ) -- $ 300.00
    14 Supply labour & material to install 8ft full height 10mm tempered glass sliding door & fixed panel -- $ 1,500.00
    Painting Works
    1 Whole house interior & ceiling Emulsion ( max 6 colours) ICI / Nippon Vinilex 5000 -- $ 1,300.00
    2 To paint all doors, door frames & piping --FOC
    Door Works
    1 Supply labour & material to install wrought iron gate -- $ 500.00
    2 Supply labour & material to install solid veneer main door c/w lockset -- $ 550.00
    3 Supply labour & material to install veneer door c/w lockset for 3 bedrooms & 1 store room -- $ 1,320.00
    Electrical Works
    4 room HDB electrical package (total $1,900)
    1 To run single point x 7
    2 To run double point x 3
    3 To run Tel point x 1
    4 To run light point x 12
    5 To install light x 12
    6 To run heater point x 1
    7 To run SCV point x 1
    8 To run aircon point x 1
    9 To run cooker hob point x 1
    10 To run water bonding earth point x 1
    11 To install DB box