chuadexter
-
Content Count
4 -
Joined
-
Last visited
Posts posted by chuadexter
-
-
Arcious, Thanks I already contacted Gavin, he's very helpful.
-
any more comments about this quotation?
-
Hi Guys,
I need your professional help and advice on my below quotation if it's expensive...
I'm doing the 2 toilets(complete reno), the kitchen(complete reno), living room(minor) , master bedroom(minor), the other 2 rooms (untouched, just some cleaning & painting).Preliminaries1 HDB Permit or Renovation Deposit if any -- F.O.C2 To provide labour / material for Acid Cleaning to whole house -- $ 200.003 To lay corrugated paper for floor protection to Whole House -- F.O.C4 Clearing of Debris,Supply of Sand,Upload of materials -- $ 400.00Demolition Works (Total $2,300)1 Supply labour to demolish existing kitchen floor & wall tiles2 Supply labour to demolish existing kitchen cabinet & sink3 Supply labour to demolish existing floor tiles & wall tiles for 2 bathrooms4 Supply labour to demolish existing WC & basins at 2 bathrooms5 Supply labour to demolish existing bi-fold doors at 2 bathrooms6 Supply labour to demolish existing pipings for whole house7 Supply labour to demolish existing doors for whole houseLiving / Dining1 Custom made 7ft full height feature wall c/w laminate finish (Designer pieces) -- $ 1,400.002 Custom made 7ft TV console c/w black glass drawers,ABS trimming,laminate finish -- $ 980.003 Custom made L4ft xH4ft shoe cabinet c/w casement door, ABS trimming & laminate finish( both sides laminate) -- $ 760.004 Custom made 2ft settee c/w drawers, ABS trimming & laminate finish -- $ 400.005 Supply labour & material to install false ceiling & L-box -- $ 1,800.00Main Bedroom1 Supply labour & material to construct storage platform c/w casement door,ABS trimming & hydraulic hinges (2.7m x 2.9m) -- $2,790.002 Custom made 7ft full height wardrobe c/w casement door, ABS trimming, laminate finish -- $ 1,750.00Master Bathroom1 Supply labour & material to cement screed wall -- $ 800.002 Supply labour & material to lay Heavy Duty Matt Homogenous floor tiles ( $3.00 ) per sqft 300mm x 300mm -- $ 550.003 Supply labour & material to lay 2 layers of K11/104 water-proofing membrane -- $ 100.004 Supply labour & material to construct shower kerb -- $ 100.005 Supply labour & material to install 10mm tempered glass shower screen c/w swing door -- $ 550.006 Supply labour & material to install PD door -- $ 350.007 Supply & install stainless steel piping (cold ) -- $ 300.008 Supply labour to install standard WC -- $ 100.009 Supply labour to install standard basin c/w tap -- $ 70.0010 Supply labour to install biget spray -- $ 40.0011 Supply labour to install all toilet accessories -- FOC12 Supply labour to install instant heater -- $ 60.0013 Supply & install new pvc floor trap -- FOC14 Supply labour & material to install toilet lourve -- $ 350.0015 Custom made 2.5ft vanity cabinet c/w casement door, ABS trimming,laminate finish & solid surface top -- $ 575.0016 Custom made 2.5ft mirror cabinet c/w casement door, ABS trimming,laminate finish -- $ 450.00Common Bathroom1 Supply labour & material to cement screed wall -- $ 800.002 Supply labour & material to lay Heavy Duty Matt Homogenous floor tiles ( $3.00 ) per sqft 300mm x 300mm -- $ 550.003 Supply labour & material to lay 2 layers of K11/104 water-proofing membrane -- $ 100.004 Supply labour & material to construct shower kerb -- $ 100.005 Supply labour & material to install 10mm tempered glass shower screen c/w swing door -- $ 550.006 Supply labour & material to install PD door -- $ 350.007 Supply & install stainless steel piping (cold ) -- $ 300.008 Supply labour to install standard WC -- $ 100.009 Supply labour to install standard basin c/w tap -- $ 70.0010 Supply labour to install biget spray -- $ 40.0011 Supply labour to install all toilet accessories -- FOC12 Supply labour to install instant heater -- $ 60.0013 Supply & install new pvc floor trap -- FOC14 Supply labour & material to install toilet lourve -- $ 350.0015 Custom made 2.5ft vanity cabinet c/w casement door, ABS trimming,laminate finish & solid surface top -- $ 575.0016 Custom made 2.5ft mirror cabinet c/w casement door, ABS trimming,laminate finish -- $ 450.00Kitchen1 Supply labour & material to cement screed wall -- $ 1,400.002 Supply labour & material to lay Heavy Duty Matt Homogenous floor tiles ( $3.00 ) per sqft 600mm x 300mm -- $ 1,300.003 Supply labour & material to lay 2 layers of K11/104 water-proofing membrane -- $ 100.004 Supply labour & material to construct cement mortar base for fridge c/w full tiling -- $ 80.005 Supply labour & material to construct cement mortar base for washing machine c/w full tiling -- $ 80.006 Supply labour & material to construct cement mortar base for kitchen cabinet c/w side tiling -- $ 300.007 Custom made 8.5ft bottom kitchen cabinet c/w casement door,ABS trimming, laminate finish -- $ 1,020.008 Custom made 8.5ft top hung kitchen cabinet c/w casement door,ABS trimming, laminate finish -- $ 1,020.009 Custom made 8.5ft solid surface top for kitchen c/w 50mm backsplash & front profile -- $ 725.0010 Custom made 2ft full height cabinet c/w drawers,ABS trimming, laminate finish (tall unit) -- $ 720.0011 Supply labour to install kitchen sink and appliances -- $ 80.0012 Supply labour & material to install 1 no. dish rack & cutlery tray -- FOC13 Supply & install exposed stainless steel piping ( cold ) -- $ 300.0014 Supply labour & material to install 8ft full height 10mm tempered glass sliding door & fixed panel -- $ 1,500.00Painting Works1 Whole house interior & ceiling Emulsion ( max 6 colours) ICI / Nippon Vinilex 5000 -- $ 1,300.002 To paint all doors, door frames & piping --FOCDoor Works1 Supply labour & material to install wrought iron gate -- $ 500.002 Supply labour & material to install solid veneer main door c/w lockset -- $ 550.003 Supply labour & material to install veneer door c/w lockset for 3 bedrooms & 1 store room -- $ 1,320.00Electrical Works4 room HDB electrical package (total $1,900)1 To run single point x 72 To run double point x 33 To run Tel point x 14 To run light point x 125 To install light x 126 To run heater point x 17 To run SCV point x 18 To run aircon point x 19 To run cooker hob point x 110 To run water bonding earth point x 111 To install DB box- 1
Quote On 4 Room Model A Hdb Flat( Is This Expensive?)
in Renovation Packages
Posted
HI Win_Low, i just pm you.