  1. Hi,

    This is my first time renovating a house. Mine is DBSS 5rm in tampines.

    I have gone through a few rounds but would really appreciate extra opinions / help.

    Bros and Sis, i welcome your help. Thank you.

    1.2

    Site planning and supervision fee

    Ideal materials and colours proposal and selection

    Laying of cardboard protection sheet & for whole unit

    1.3

    250.00$

    1.4

    Haulage and debris fee. 500.00$

    2

    DISMANTLE AND HACKING AND TILING WORKS

    2.1

    Supply labour, tools to dismantle existing kitchen cabinet. 200.00$

    2.2

    Supply labour, tools to hack existing kitchen cabinet base. 200.00$

    2.3

    Supply labour, material, tools to overlay tiller at kitchen floor. 1,500.00$

    2.4

    Supply labour, tools to dismantle 1nos. Bedroom wardrobe . 100.00$

    2.5

    Supply labour, tools to dismantle 1nos. Master toilet cabinet . 100.00$

    3

    VANISHING PARQUET WORKS

    3.1

    Supply labour, material, tools to vanishing parquet at 3 bedroom. 1,200.00$

    4

    DOOR WORKS

    4.1

    550.00$

    Supply labour, material to install 1 set of alum sliding door at kitchen.

    5

    CEILLING WORKS

    5.1

    Supply labour, material, tools to install false ceiling and L- Box light holder **** room and 2,800.00$

    master bedroom.

    6

    CARPENTRY WORKS

    KITCHEN.

    6.1

    Supply and install 16ftr top cabinet in laminated, internal carcass in pvc white finish. 2,000.00$

    6.1

    Supply and install 13ftr bottom cabinet in laminated, internal carcass in pvc white finish. 1,625.00$

    6.3

    Supply and install 9ftr glass kitchen backing. 650.00$

    A) All door and drawer with ABS trimming.

    B) All door with soft close hinges.

    C) Soft closing in 4 set of drawer.

    D) 1no. of cutlery tray.

    E) 1 set of dish rack.

    1 lot 400.00$

    6.4

    Supply and install selected solid surface worktop 13ft/L. 1,560.00$

    7

    LIVING ROOM

    7.1

    Supply and install 8.5ftr full height TV feature wall in selected wall paper finishing. 1,500.00$

    7.2

    Supply and install 7ftr TV console in selected laminate finishing. 1,160.00$

    7.3

    Supply and install low display unit in selected laminate finishing. 600.00$

    8

    LIVING ROOM AND MASTER ROOM

    8.1

    Supply and install selected wall paper **** room. 1,500.00$

    Supply and install selected wall paper at master room. 700.00$

    8.2

    Supply and install selected dressing table master room. 850.00$

    9

    BEDROOM

    9.1

    Supply labour and material to install 6 ftr sliding wardrobe. 1,560.00$

    9.2

    Supply and install bay window cladding in selected laminate finishing 3 bedroom. 1,300.00$

    10

    PLUMBING WORKS

    10.1

    Supply labour to install 1set kitchen sink and tap. 250.00$

    10.2

    Supply labour to install 1set wash basin and tap. 120.00$

    10.3

    Supply labour to install 2set toilet accessories. 180.00$

    11

    PAINTING WORKS

    11.1

    Supply labour and material & tools to paint internal wall & ceiling using 1,700.00$

    (Nippon or ICI pentalite up to 5 colour)

    12

    WASHING WORKS.

    12.1

    Supply labour and material to provide general cleaning.

    350.00$

    A

    MASTER TOILET

    1

    Supply labour, material, tools to overlay mosaic tiles at toilet in selected area.

    2

    Supply labour to install 1set bath tub and relocate mixer tap.

    1 lot

    1,950.00$

    A

    CONTRACT SUM

    27,355.00$

×