![](https://www.renotalk.com/forum/uploads/set_resources_4/84c1e40ea0e759e3f1505eb1788ddf3c_pattern.png)
![](https://www.renotalk.com/forum/uploads/set_resources_4/84c1e40ea0e759e3f1505eb1788ddf3c_default_photo.png)
blueblue_m6
-
Content Count
78 -
Joined
-
Last visited
Posts posted by blueblue_m6
-
-
thought only pay when the carpentry stuff are made in the factory?think it's a little too early to pay lah, skali they run away how?
wah like that you can become president liao wor
me only have the active kitchen series and some pots nia
hoping to get some kitchen accessories at the next 20% + 10% sale
ya.. tot so too..i told him i'll pay after cny. then he says if tat's the case the project will delay by a few days cos carpentry will only start 2.5 wks after cny (tat includes my kitchen as well)..
yup agree with apple. Its too fast to pay now. And infact till now when my carpentries are almost done i only pay 75% of the reno amount. He keeps asking for chq but my hubby and I are kinda pissed off with all the delays. Since he delays us. We'll delay his payment.lolx.. u & ur hubby's so hiong.. lolx! think mi & my hubby too soft le.. must bai4 ni3 men2 wei2 shi1..
hi blueblue, really really love your lights!lolx~! went back eurostar again (cos my mum wanna change some lights at hm before cny). kind of worried now if the living rm light (80 diameter) is too big for my small 3.1x4.8m living area..
hehe blueblue ur blog is running so fast, nearly cant catch up. saw my name above again, i am not fortune teller la kekewa so fast need to pay another 40%? so u have already paid 45% for the "kai gong"..by right another 40% is for the start work at factory. but they havent start, so wait till after cny then pay can?
kitchen cabinet considered carpentry? he says if payment is made next tues, he'll start on kitchen cabinet before cny, but it'll oni be ready after cny..
Hi BLUEI also intend to buy this kind of oven.
But really not sure where to put.
Is it something like slot the oven in the middle of the full height cabinet?
Thanks.
HAPPY
normally ppl will put it in the kitchen cabinet below the hob or in the middle of a full height cabinet. the latter is more recommended as u wont have to stood down to use the oven. in future, when ur wife gets pregnant, it's easier for her to use the oven at eye-level. (<-i designed a part of my kitchen to b full height cabinet for this reason. Must think of future mah.. hehe.
)
juz my 2cents worth.
-
wooo that sounds like modern opulence liaoshine and regal feel
hey, saw in other threads u r the WMF club president!! lolx!!
can i join ur club too?? lolx! i bought my WMF (philadelphia) cutleries, WMF red & white wine glasses, champagne glasses, short & tall glasses, as well as a WMF knife set (messer-set) recently at robinson sale.
-
love ur layout, big & so much rm for creativity..
-
ur completed kitchen looks
.
-
my id wants me to pay the next 40% next tues le... isnt it a li' too fast? i've juz paid 45% when hacking starts.. & since my carpentry can only commence after cny, i reali c no hurry.. wat u guys think?
-
wow.. BIG plc u've got there!
my hse seems so mini compared to urs..
-
bro,your lightings
dark and classy!!
the overall theme is modern gothic? dark victorian?
never mind, i am just babbling..hehe
hey bro, im not "bro".. lolx!
thanx for the compliments.
i also dunno wat kind of concept my hse is.. hmm.. tot it was modern-contemporary.. more of modern i guess.. hehe. my living/dinning rm's carpentry is glossy black with black mirrors.. wallpaper'll be gold-tone-base (plain gold with a little texture as nt to "overkill" my small living area).. sofa's glossy brown.. curtains black/dark grey (still dunno wat kind of colour & material.. organza or velvet?)
btw, here's a pic of my sofa.. will be giving the cushions black-furry-clothings. hehe.
-
pix pixthere u go...
Floor in bomb shelter. the colour is a bit off (lousy hp
).. hehe. this is actuali 60x60 pure white homogenous tiles.. the cement filling is nt in yet. my hubby & i tot the workmanship was quite gd, even without the cement filling.
the common bath's wall taken sometime last week (without cement filling)...
this photo is juz taken. sorry for the lousy resolution. will take pics using a better camera (not my hp cam) in future. hehe. they r currently still doing the floor (wall tiles' gaps are filled)..
the mosaic tiles on the opposite side of the wall is up as well.. but i forgot to take a pic of it!
my kitchen is using the same wall & floor tile as my common bath.. do u think the colours r a little too contrasting?... reali hope the colour goes well with my white kitchen.
colour of my common bath & kitchen floor tiles: copper
here's the partially done mosaic panel in my master bathrm.
the black mosaic panel is supposed to have a glimmering effect. but i guess my hp camera sXXkx.. lolx..
will definitely take a pic again when whole panel is done.
the mosaic tiles.. with a plastic sheet over it..
-
I love your choice of appliances and also your lightings! They are so pretty!!!i love them a lot too.. hehe. in fact, my id was quite against my living room's lights at 1st, cos he says they may be too loud for his design.. but i din care much less...
i've yet to get the ariston appliances in the kitchen. but they're more or less cfm. wondering if i shd get the oven now though.. heard there's always some "mid-yr sale" thingy gg on during apr/may for mayer where prices r slashed..
has renovation work started yet?or going to finish liao?
me not like YG, he bend his fingers can count liao
:D
lolx~! tat's a gd one..
handed the keys over to my id on 26 dec & signed the permit application, but hacking only started 4 jan (takes 10 days to get permit?? as so claimed by id.). last sat when i went over, the guys were doing the kitchen wall tiles. bombshelter's floor & common bath's walls were already done. reali wonder how's the works getting on.. prob will drop by this noon.
my carpentry works for the entire hse will only commence after cny. sad..
-
applefreak will be here soon..hmm... u do full time or part time fortune telling?
heard my name somewhere........oh it's here
aiyo YG, you make me sound like stalker leh
hi blueblue, you must have spent a bomb on lights
love the foyer crystal light, very beautiful
thank u..
spent almost 4k on them.. hehe.
fell in love with my living & dinning lights when i saw them at lightology 4 mths ago.. but i bought them from eurostar in the end.
-
welcome to t-blog!! good luck to ur reno. kekethank u~! will b updating the renovation works in future. =)
-
Our hse Before Reno:
Mummy caught in the photo!
kitchen
As for the Common toilet, nothing will be spared as well..
Bedrm 3
Our Original Master Bedrm. Small isnt it? tat's y we'll b hacking away the walls between the master rm & bedrm 2 to widen our personal space.
Master bathroom
-
yup.. on the 31st met up with cindy monkeybone, linggie & her hubby, and fat bearmost of the problems hv not fixed yet.. but doors were up already..
haha.. inside the mirror was cindy n my master
ur bedrm door is very nice. how much were u quoted for it? =)
-
Our Home theatre system
Tannoy Mercury F4
Wharfedale Diamond Sub (we got the black one)
as well as 4 ceiling mount speakers. (2 for entertainment rm as rear speakers, 1 for music in living area & 1 for music in dinning area.)
Our Lights
1. Foyer Light (Swarovski)
2. Living area Light (Swarovski)
3. Dining area Light (Swarovski)
4. Master & Study Rm Light
5. Master Bathroom Light
for our common bath is a white "milo tin".
as for the bar counter, we r juz using ordinary twin large halogen lights & warm lights for the counter.
we r using cool PLC for our kitchen lights & warm lights for the lights from the kitchen cabinet.
we bought 17 PLC & Halogen lights, 8 fluorescent lights, a hamburger for bomb shelter, & a door bell as well..
-
-
hihi,
Our Reno Blog:
http://www.renotalk.com/forum/index.php?au...blogid=399&
Venue: Rivervale Drive
Type: HDB 5Rm (Resale)
Size: 110 sqm
Age of flat: 7 yrs as of 1 Jan 2008
Value of hm before Reno: $292,000
HDB grant: Not eligible
No of Occupants: Just 2 of Us
Concept: Mix of Modern & Contempory (We go with watever we r comfortable with
)
Renovation ID: The Interior Place
Main Designer In-charged: Mr Wayne Ng (Director)
Below is our Original Floor Plan:
-
my sa investments made min 15% returns/yr last 3 yrs with aia. now sa's interest is still nt too bad at 4% (+1% for 1st 40k in SA & Medisave), but come 2010, everything will b tagged to 10yrs SG Bonds. dunno how things'll b then. by then, due to the "tie-down", it may be too late to invest. try to find out more from ur financial advisors/insurance agents. they shd b able to advise u further.
-
Mazda 6 2.3
-
Lumiere provided extremely poor service for me. Went in with my gf, was ignored the entire time. Asked a salesperson about some of their lights there, gave me a curt answer then continued ignoring me. Then an ang mo couple came in, the sales staff immediately flocked to them. This happened to me not once, but twice...Will never step in there again with such biased and poor attitudes, surprisingly though, in contrast, I bought from their "sister" shop Eurostar, Danny provided excellent service for me.
I'd recommend Chan Huat, reasonable price and I made exchanges for some of my lights 3 times (due to my ID getting his measurements wrong and design changes...) without problems!
Excellent service provided by James and LK Lew.
i went around many many shops along balestier. like u, i personally think the sales people at lumiere were quite arrogant.
i also went to lightology. helpful & gd service, but price wasn't very attractive.
Eurostar has exactly the same lightings as lumiere & lightology. i would recommend paul
for his gd discount & great advises, or danny (
) for his patience & advises.
however, i do agree tat sometimes it's the salesperson whom u liase with tat makes the impression. it's always gd to shop ard & compare.
-
ah.. i got the same door for all 3 bedrooms as well.. but ID charged me a 1140 in total..i wanna change 1 door as well. my id told me he'll charge me watever quote i can find. lolx~
does ur price include the frame & knob?
anyone knows if alterations of door size will increase the door price?
thanx in advance.
-
i think i've seen these crystallized glass panel top in classic kitchen before. but i was not sure if it was merely sandblasted glass or something else. it does look really pretty. but looks very 'fragile' too. imagine if u drop something heavy... *ouch*how is the resistence like? does it come in 1 single long piece for your entire top?
but wah.. $180 pfr is a heafty price to pay for a kitchen top. but i'm sure it will look great!
yes... plenty. juz to name a few....
tiles
laminated postform
stainless steel
granite
marble
glass
my reno juz started. till now, im still not sure if it's in one piece. i hope it is though... It looks pretty, being glossy pure white.
, & i was told it's not porous and is harder than granite, so i guess it wun b so easily scratched. i keep my fingers crossed.
-
why not just start your reno after CNY?the hse is v badly maintained-super dirty & ugly... juz got the keys. i'll rather get things over & done with asap. thanx for suggesting though. hehe. !!
thought the norm is usually 10% on work starting, 40% upon completion of all wet works (or delivery of sand & tiles), 40% on delivery of all carpentry materialsand the remaining 10% on completion?
my contract says 10% upon confirmation of reno works, 40% upon commencement of reno works, 40% upon measurement of carpentry, 10% upon completion. sigh.. nvr read these fine prints b4 committing..
my id agreed to reduce it to $25k instead. though nt too much of a diff, but better than nothing. hehe. thanx for all ur advises. =)
-
i've chosen a crystallized glass panel top (white) for my kitchen top- it's call nero paris if im nt wrong. fell in love with the colour & shine. it's man-made & non-porous. my ID (the interior place) quoted me $180+pf run for it. now reno juz started. will update in time to come if this kind of top is gd.
!!
-
hi all.
i need some advises. after reading some threads in forum abt contractors running away & job nt done after payment, im quite worried.
my reno works cost ard $60k (wet works + carpentry).
my id told me to give them 50% of contract amount - deposit 2nd day we start work (which is next tues). the thing is, as cny is approaching, all carpentry work will only commence end feb 07, as he claims workers will only start work 2 wks after cny.
is it safe for me to give him so much now? anyone can advise wat the norm is? thank u in advance.
A & J Home Sweet Home
in Reno t-Blog Chat
Posted · Edited by blueblue_m6
MasterRm + Bedroom 2 = New Master Rm![:sport-smiley-004:](https://www.renotalk.com/forum/uploads/emoticons/default_sport-smiley-004.gif)
view from Master Bathrm Door:
view from Master Rm door:
new door frame for BR3 (original height of door reduced to hide aircon duct)
measurement has yet to be made. hmm.. maybe i'll try chamsiong with him.. pay a percentage, but nt full 40%...