Jump to content
Find Professionals    Deals    Get Quotations   Portfolios

Juliechow

Members
  • Content Count

    32
  • Joined

  • Last visited

Posts posted by Juliechow


  1. On 3/14/2018 at 9:46 PM, javier said:

    hi, can share pm me ur contractor. thank you

    please contact Mr Tan at Eight 3 33 four one eight 4

    On 3/13/2018 at 3:37 PM, tomato wifey said:

    Hi  Julie, thanks for the detailed post. Would you mind sharing your contractor's detail/ contacts? Many thanks!

    please contact Mr Tan at Eight 3 33 four one eight 4


  2. Hi Sorry for the job scope that i forgot to upload .

    Please see below listed: 

     

    Job Scope:

    1) Site protection, haulage and disposal of debris

    2) House keeping and chemical cleaning before handover

    Living

    3) To remove protruding wall panel behind T.V console feature wall for disposal

    4)To hack off all tiles skirting for disposal

    5) To remove all wall paper for disposal

    Kitchen

    6) To remove all top wall mount cabinate door for disposal.

    Master Bedroom

    7) To remove wall paper for disposal. (keep window area wall paper.

    8) To remove wardrobe sliding door and drawer face panel. for disposal.

    Master Bathroom

    9) To remove toilet bowl, basin and basin tap for disposal.

    10) To hack shower area pebble flooring for disposal

    11) Supply and install new toilet bowl 

    WET WORKS Supply build material, equipment and labour to

    12) Overlay common bath floor and install designer floor trap. (tiles budget $3.50 per sqft)

    13) Overlay master bath floor and install designer floor trap. (tiles budget $3.50 per sqft)

    14) PLASTERCEIL WORKS

    15) To make good wall affected by hacking and demolish work.

    CARPENTRY WORKS Including Soft closing hinges and soft closing drawer runner, ABS finishing on door.

    16) Supply and re-laminated T.V console feature wall on front and back.

    17) Supply and re-laminated top wall mount body exterior and supply new laminated door.

    18) Supply new laminated door for wardrobe and drawer face panel. Lump sum.

    19) PLUMBING WORKS

    20) Labour to install master bath basin and tap.( Sanitary item and fixture not included.)

    Others 

    21) Supply and install quartz top on Tv console

    22)  Supply and lay vinyl floor tiles over existing flooring **** and dinning. 380 sqft

    23)  To cut existing entrance to kitchen door to allow new vinyl flooring to clear. 01 nos.

    24)  Supply new ceiling fan point c/w control switch and install ceiling fan. 01 set.(Fan by owner)

    25) To alter existing lighting switch control for cove lighting, T.V console light to single 01 set

    26) Labour to install lighting. 06 nos. 

×