Design and Build

PACKAGE PRICE 4-Rms $11, 888 ||Free 1 BRANDED HOB & 1 BRANDED COOKER HOOD

Package price does not include HDB and Town Council Haulage Services

Design Works

- Perspective drawing by our designer team

- Detailed floor plan layout

- Conceptualized space & furniture planning

- Consultation of material & colour selection

Masonry Works

- Construct 50mm kitchen cabinet base side tiles up

- Construct 50mm washing machine base & fridge base surface & side tile up

Plumbing Works

- Install inlet & outlet piping for washing machine

- Labour to install water heater

- Labour to install 02-set of toilets accessories

- Connect to kitchen sink tap

- Labour to connect PVC kitchen sink outlet

Window Grille Works

- Supply & install aluminium window grille for whole unit with selected design (Silver and Bronze).

- Exclusive Service Yard Not Exceed of 180 sq ft

Painting Works

- ICI paints wash & wear

- Painting of all sewerage pipes

- Painting of all doors, all frames & main metal gate.

- Up to 5 colours of internal walls & ceiling white

Carpentry Works for Bedroom

- Supply & install 5ft built in wardrobe with laminate solid plywood for bedroom 2

- Supply & install 5ft built in wardrobe with laminate solid plywood for bedroom 3 ( I request bedroom 3 move to master bedroom make L wardrobe make bigger)

Carpentry Works for Master Bedroom

- Supply & install 6ft build in wardrobe with laminate solid plywood.

Electrical Works

- Labour to install ceiling light to all HDB original light points

Other Works

- Professional project arrangement & co-ordination

- Workmanship warranty for 1 year

- Acid wash for whole unit floor after renovation

Varnishing of Parquet

- Supply labour & material to varnish 03 bedrooms parquet flooring

Carpentry Works

- 24ft laminate kitchen cabinet (combination of top & bottom cabinet)

- All internal carcass & panel doors are made from solid plywood

- ABS trimming door panels

- Solid surface work-top at kitchen cabinet (12ft only)

- 1 set of stainless steel dish rack

- 1 set of glass panel doors

- With soft closing hinges

- Labour to install cooker hood & hob

Additional works:

To fabricate & design 6ft suspend tv console with feature wall in laminate finish.

To fabricate additional 12ft kitchen cabinet

To construct 2 nos. shower kerb with hdb tiles

To supply & install wpc wall to wall sliding door shower screen with acrylic panels at bathroom MBR

To fabricate 3ft top suspend vanity mirror cabinet with swing door in laminate finish & abs trimmings with light holder

To supply & install sliding windows with aluminium frame at service yard (4 panel window)

To supply & install aluminium sliding grilles at service yard

To construct L-shape L-box light holder **** hall

To construct false ceiling at dining hall & foyer at main entrance & passageway

To fabricate 4.5ft full ht shoe cabinet with swing doors in laminate finish & abs trimmings at main entrance with laminate backing

To fabricate 2.5ft full ht shoe cabinet with clear glass door in laminate finish & abs trimmings at main entrance reccess

To supply & install chengai wood decking at planter bed **** hall

To supply & install fixed aluminium grilles **** hall planter bed on top ofexisting iron grilles

To supply & install 1 fixed panel 10mm clear tempered glass at common bathroom

To supply & install additional 6ft solid surface worktop at kitchen cabinet (I abit fussy for kitchen, i am chef )

To supply & install 10mm clear tempered glass swing door with stainless steel handle(selected)& wall hinges at kitchen entrance

To supply & install clear 10mm tempered glass fixed panel at kitchen

To construct false wall at top of kitchen entrance to allow for installation of tempered glass door

To fabricate 3ft suspend tv console in laminate finish at main bedroom

My electrical work

Living room

Install down light and install light fitting 6 nos install 2x13A power 2nos

Shift and install scv point

Dining room

install cabinet lighting switch 2nos per

install light down light 5 nos

install 2 way lighting switch 1 nos

install 2x13H power 1 nos

Master bedroom

install 2x13A power 1 nos

Shift and install scv 1 nos

Kitchen

install 2x13A power 3 nos

install cooker hood point switch 1 nos

labour to install hanging light 1 nos

labour to install light fitting 12nos

Edited by Raygorn
 

Share this post


Link to post
Share on other sites

Went for measure some stuffs & how many lights i need to buy & check renovation process.

6897181429_83349bea1a.jpg

Gas pile up!

6897182841_92552d940a.jpg

Kitchen glass door up

6897179971_c60dfed60e.jpg

6897172269_fb47b66af7.jpg

Common toilet temp glass up

6897198265_0260e42b71.jpg

Edited by Raygorn
 

Share this post


Link to post
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
Sign in to follow this  

×