dyleen26 0 Report post Posted July 20, 2012 Hi all, Need some advise on the following:1)Say when there is an existing lighting point, the electrician taps that point to make it a total of 4 points, do they charge this as 3 or 4 additional lighting points?2) For looping of T5 cove lights, lets say I need 3 T5 tubes to make up the cove light, how would they charge? Do they charge it as 1 lighting point and 3 installation of T5 light with looping?Sorry for sounding so noob hee, just wanted to know what is the standard practice in the industry. Thanks! Share this post Link to post Share on other sites
adamis88 0 Report post Posted July 20, 2012 Hi all, Need some advise on the following:1)Say when there is an existing lighting point, the electrician taps that point to make it a total of 4 points, do they charge this as 3 or 4 additional lighting points?2) For looping of T5 cove lights, lets say I need 3 T5 tubes to make up the cove light, how would they charge? Do they charge it as 1 lighting point and 3 installation of T5 light with looping?Sorry for sounding so noob hee, just wanted to know what is the standard practice in the industry. Thanks!1) should be consider as 1 lighting point + 3x looping point2) cove light not too sure, but should be 1 lighting point + 2x looping point (in your case)it seems like that was how my electrician quoted Share this post Link to post Share on other sites
keelyn 0 Report post Posted July 21, 2012 1) supply/install 3 looping pointsRemove 1 existing light fittingSupply/install 4 new light fittings2) 1 lighting point and 2 looping pointsSupply/install 3 new light fittings Share this post Link to post Share on other sites