Hi all, I'm new to this renovation world, bought my 1st house (resale 3A) recently & had ID firm's quote for my house renovation as below.

    Professional service    
1    Design & site co-ordination.     FOC 
2    Space planning layout plan.     FOC 
3    HDB permit submission.     FOC

    Kitchen    
1    To hack off existing floor tiles at kitchen      $480.00 
2    To supply & lay water proofing membrane for kitchen.     $380.00 
3    To provide labour  lay homogenous (30mmX60mm) floor tiles for kitchen.      $1,000.00 
4    To hack off existing wall tiles for kitchen.     $420.00 
5    To Chipping Hole for kitchen top wall      $320.00 
6    To Supply and replastering wall smooth with cement finishing at kitchen      $1,450.00 
7    To construct 50mm base with tiles finishing for kitchen cabinet. (L- Shape )     $380.00 

    02nos toilet    
1    To hack off existing floor tiles at 02nos toilet.     $380.00 
2    To supply & lay water proofing membrane for 02nos toilet.     $450.00 
3    To provide labour  lay homogenous floor tiles for 02nos toilet.      $1,000.00 
4    To hack off existing wall tiles for 02nos toilet.     $720.00 
5    To provide labour lay ceramic wall tiles for 02nos toilet.     $2,180.00 
6    To construct 1 nos of shower kerb with tiles finishing for main toilet     $140.00 
7    To construct 1 nos of entrance  kerb with tiles finishing for  main toilet      $140.00 
8    To demolish existing wall to reopening new entrance for   main toilet      $250.00 
9    To  seal up and contruct new wall with  63mm H/B with cement finish for  main toilet      $300.00 
10    To construct 1 nos  lintor  on top of common  toilet entrance      $280.00 

    02nos  bedroom, Living and Storeroom    
1    Hack off existing floor tiles and skirting at 03nos bedroom & storeroom.     $880.00 
2    To provide labour  lay homogeneous floor tiles at 03nos bedroom      $1,580.00 
3    To provide labour  lay homogeneous skirting at 03nos bedroom      $450.00 
4    Hack off existing floor tiles and skirting **** and storeroom      $750.00 
5    To provide labour lay homogeneous floor tiles ****     $1,450.00 
6    To provide labour lay homogeneous skirting ****     $380.00 

    Ceiling Works     
1    Supply & install false ceiling **** hall and walk way      $1,250.00 
2    Supply & install round cove light **** hall      $880.00 
3    Supply & install false ceiling cum cove light at main bedroom      $850.00 
4    Supply & install false ceiling at dining area      $220.00 
5    Box up with gpysum board on top of storeroom entrance      $180.00 

    Carpentery Works     
1    Supply & install display cabinet with open shelves and laminated finishing **** hall      $480.00 
2    Supply & install Tv Console with laminated finishing and drawer **** hall (est 6ft)     $720.00 
3    Supply & install build in wardrobe  with laminated finishing, sliding wooden door, shelves,hanging drawer **** hall (est 7ft)     $1,750.00 
4    Supply & install kitchen cabinet Top and bottom  with laminated finishing ,ABS trimming door, shelves and 1 column drawer **** hall (est 18ft)     $2,124.00 
5    Supply & install Diveder panel with laminated finishing at kitchen sink area      $250.00 
6    Supply & install tic tac wooden door with laminated finishing for storeroom      $580.00 
7    Supply & install solid surface for kitchen top (Est 12ft)     $960.00 

    Plumbing works    
1    To dismantle & dispose existing toilet bowl & washing basin for 02nos toilet.     FOC 
2    Supply & install cold water stainless steel pipe for 02nos toilet     $480.00 
3    Supply & install cold water stainless steel pipe for kitchen & washing machine.     $420.00 
4    To runs new 40mm pvc inlet/outlet pipe for washing machine & kitchen sink.     $220.00 
5    Provide labour only to install kitchen sink & tap.     $130.00 
6    Provide labour only to install toilet bowl for 02nos toilet.     $280.00 
7    Provide labour only to install basin & tap for 02nos toilet.     $240.00 
8    Provide labour only to install toilet acessories for 02nos toilet.     $80.00 
9    Provide labour only to install cooker hob & cooker hood     FOC 

    Others works    
1    To supply & install 10mm tempered glass with frosted door for 02nos toilet.     $980.00
2    Supply & install 10mm tempered glass shower screen at main toilet      $780.00 
3    To supply & install kitchen backing in btw top and bottom kitchen cabinet      $680.00 
4    To dismantle existing kitchen cabinet      $380.00 
5    To painting whole house wall & ceiling using Nippon Vinilex 5000 (3+1 colour)     $1,180.00 
6    Additional charges for 3in1 pre-package material for wet work.     $1,880.00 
7    Supply & install stainless steel rubish chute      $180.00 
8    Haulage fee for delivery & raw material.     $650.00 
9    Haulage clean debris service during renovation works.     $550.00 
10    Chemical wash for whole house unit.     $320.00 

    3 Room Electrical     
To Rewiring whole unit with standard package. (All items Approval by PUB)    
a) 34nos X $50. Lighting points     $1,700.00 
b) 9nos. X $70  Double power socket outlet. 13A x 2     $630.00 
c) 5nos. X $60  Single power socket outlet. 13A x 1     $300.00 
d) 1nos. Air-con point     $150.00 
e) 1nos. MCB main board     $380.00 
f ) 2nos X $ 120  Water heater point     $240.00 
g ) 3nos X $80 Data Point     $240.00 
h ) installation for 34 nos. Lighting     FOC 
I ) 3nos X$150. SCV points.     $450.00 

Total price : $39,524.00
 

Are this quotation reasonable? I feel like some of the thing quote too high.

Please advise.

Thanks :)

Edited by oMnMo
 

Share this post


Link to post
Share on other sites

Join 46,923 satisfied homeowners who used renotalk quotation service to find interior designers. Get an estimated quotation
On 29 February 2016 at 5:03 PM, oMnMo said:

Hi all, I'm new to this renovation world, bought my 1st house (resale 3A) recently & had ID firm's quote for my house renovation as below.

    Professional service    
1    Design & site co-ordination.     FOC 
2    Space planning layout plan.     FOC 
3    HDB permit submission.     FOC

    Kitchen    
1    To hack off existing floor tiles at kitchen      $480.00 
2    To supply & lay water proofing membrane for kitchen.     $380.00 
3    To provide labour  lay homogenous (30mmX60mm) floor tiles for kitchen.      $1,000.00 
4    To hack off existing wall tiles for kitchen.     $420.00 
5    To Chipping Hole for kitchen top wall      $320.00 
6    To Supply and replastering wall smooth with cement finishing at kitchen      $1,450.00 
7    To construct 50mm base with tiles finishing for kitchen cabinet. (L- Shape )     $380.00 

    02nos toilet    
1    To hack off existing floor tiles at 02nos toilet.     $380.00 
2    To supply & lay water proofing membrane for 02nos toilet.     $450.00 
3    To provide labour  lay homogenous floor tiles for 02nos toilet.      $1,000.00 
4    To hack off existing wall tiles for 02nos toilet.     $720.00 
5    To provide labour lay ceramic wall tiles for 02nos toilet.     $2,180.00 
6    To construct 1 nos of shower kerb with tiles finishing for main toilet     $140.00 
7    To construct 1 nos of entrance  kerb with tiles finishing for  main toilet      $140.00 
8    To demolish existing wall to reopening new entrance for   main toilet      $250.00 
9    To  seal up and contruct new wall with  63mm H/B with cement finish for  main toilet      $300.00 
10    To construct 1 nos  lintor  on top of common  toilet entrance      $280.00 

    02nos  bedroom, Living and Storeroom    
1    Hack off existing floor tiles and skirting at 03nos bedroom & storeroom.     $880.00 
2    To provide labour  lay homogeneous floor tiles at 03nos bedroom      $1,580.00 
3    To provide labour  lay homogeneous skirting at 03nos bedroom      $450.00 
4    Hack off existing floor tiles and skirting **** and storeroom      $750.00 
5    To provide labour lay homogeneous floor tiles ****     $1,450.00 
6    To provide labour lay homogeneous skirting ****     $380.00 

    Ceiling Works     
1    Supply & install false ceiling **** hall and walk way      $1,250.00 
2    Supply & install round cove light **** hall      $880.00 
3    Supply & install false ceiling cum cove light at main bedroom      $850.00 
4    Supply & install false ceiling at dining area      $220.00 
5    Box up with gpysum board on top of storeroom entrance      $180.00 

    Carpentery Works     
1    Supply & install display cabinet with open shelves and laminated finishing **** hall      $480.00 
2    Supply & install Tv Console with laminated finishing and drawer **** hall (est 6ft)     $720.00 
3    Supply & install build in wardrobe  with laminated finishing, sliding wooden door, shelves,hanging drawer **** hall (est 7ft)     $1,750.00 
4    Supply & install kitchen cabinet Top and bottom  with laminated finishing ,ABS trimming door, shelves and 1 column drawer **** hall (est 18ft)     $2,124.00 
5    Supply & install Diveder panel with laminated finishing at kitchen sink area      $250.00 
6    Supply & install tic tac wooden door with laminated finishing for storeroom      $580.00 
7    Supply & install solid surface for kitchen top (Est 12ft)     $960.00 

    Plumbing works    
1    To dismantle & dispose existing toilet bowl & washing basin for 02nos toilet.     FOC 
2    Supply & install cold water stainless steel pipe for 02nos toilet     $480.00 
3    Supply & install cold water stainless steel pipe for kitchen & washing machine.     $420.00 
4    To runs new 40mm pvc inlet/outlet pipe for washing machine & kitchen sink.     $220.00 
5    Provide labour only to install kitchen sink & tap.     $130.00 
6    Provide labour only to install toilet bowl for 02nos toilet.     $280.00 
7    Provide labour only to install basin & tap for 02nos toilet.     $240.00 
8    Provide labour only to install toilet acessories for 02nos toilet.     $80.00 
9    Provide labour only to install cooker hob & cooker hood     FOC 

    Others works    
1    To supply & install 10mm tempered glass with frosted door for 02nos toilet.     $980.00
2    Supply & install 10mm tempered glass shower screen at main toilet      $780.00 
3    To supply & install kitchen backing in btw top and bottom kitchen cabinet      $680.00 
4    To dismantle existing kitchen cabinet      $380.00 
5    To painting whole house wall & ceiling using Nippon Vinilex 5000 (3+1 colour)     $1,180.00 
6    Additional charges for 3in1 pre-package material for wet work.     $1,880.00 
7    Supply & install stainless steel rubish chute      $180.00 
8    Haulage fee for delivery & raw material.     $650.00 
9    Haulage clean debris service during renovation works.     $550.00 
10    Chemical wash for whole house unit.     $320.00 

    3 Room Electrical     
To Rewiring whole unit with standard package. (All items Approval by PUB)    
a) 34nos X $50. Lighting points     $1,700.00 
b) 9nos. X $70  Double power socket outlet. 13A x 2     $630.00 
c) 5nos. X $60  Single power socket outlet. 13A x 1     $300.00 
d) 1nos. Air-con point     $150.00 
e) 1nos. MCB main board     $380.00 
f ) 2nos X $ 120  Water heater point     $240.00 
g ) 3nos X $80 Data Point     $240.00 
h ) installation for 34 nos. Lighting     FOC 
I ) 3nos X$150. SCV points.     $450.00 

Total price : $39,524.00
 

Are this quotation reasonable? I feel like some of the thing quote too high.

Please advise.

Thanks :)

Hi 

i think the price is pretty reasonable. Most importantly you trust the ID and understand what you are paying for and getting at the end of the day. Good luck ! 

 

Share this post


Link to post
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment