Jump to content
Find Professionals    Deals    Get Quotations   Portfolios

aves

Members
  • Content Count

    241
  • Joined

  • Last visited

Everything posted by aves

  1. wow a lot of simei blogs recently. lol! nice and daring designs there! hope to see the end result soon
  2. maybe non glossy black? glossy black is a fingerprint and watermark magnet
  3. Been a long time. Moved in for almost 1 month liao. Been too busy/lazy to take pics Living Room: 46" TV looks so small in the living room right? Sofa direction also wrong cos L should be on the other side... FOC old sofa from my MIL so no choice Another view... still haven done curtains Rooms entrance Kitchen/Dining: Small as **** cheapo ikea dining table FOC from MIL... also nv use dining area... end up just used to 'store' tidbits Black glossy cabinets and doors etc looks nice but a pain to maintain Another view MBR: The other place where I play my xbox. Table is bad already so you can see the monitors are tilted. The left side is my area, right side is my wife's PC Bed and back of wardrobe. The other side of the wardrobe. Toilet entrance to the right. Cant see much cos no wide angle lens, only my lousy phone cam MBR toilet. Other 2 rooms have nothing much. 1 used as store cum maidroom (when my MIL's maid come over) the other has a queen bed with mattress for my MIL when she decides to stay over
  4. Thursday - Went up to clean up the house. Oversee some last min touchups. At the end of the day, house was still pretty dirty cos really too much dirt plus some minor works here and there... and the heavy rain splashing water in while someone was installing the gate lock... messy... moved some brand new stuff into the house. Friday - Went to the house to do the basic moving in procedures then went back to help out with the movers and make sure everything is in order. Wife waited at new house for bedframe delivery. realised we dont have alot of things and got quite a few things missing/broken etc etc. so many things to do until i dunno where to start... Sat Sun - more unpacking and cleaning up. bought lotsa stuff from ikea and giant... cooked using the induction cooker on saturday. main problem with it is that the touch panel is not sensitive enough and the thing doesnt remember the last used settings. u gotta adjust the power and temp everytime. Overall, a job well done by my ID and for the price he gave me, little freebies and favours here and there. i think its all worth it. house is still a mess so no pics yet. will post soon hopefully.. but living room no TV now so it'll look **** weird....
  5. Glass and Granite works done. Air con is up. Left: Install Hob Install Dining Light Main Gate Lockset Paint touchup Other small touchup and misc works Duno really can move by friday or not but movers already more or less confirmed
  6. already very slow liao. total took 8 weeks. well he did say 6 weeks fastest and my friend was busy in reservist for 3 weeks so things were a tad slow during that period.
  7. Alot of things are done within a few days. electrical and lights should be complete. Carpentry also. Today finishing up with granite top and glass Tmrw Chemical wash Thurs Final pain touchup and our own cleaning up Friday MOVE!
  8. View from Kitchen to Living This is where the TV will be View towards Rooms Kitchen Master Bedroom Study Room (whole wall supposed to be gray) Common Room (Wall on right supposed to be gray) Common Toilet
  9. been ages since i updated. things completed tiling false ceiling plastering aircon trunking storage heater installed WC installed shower accessories install nv take pics tho. next time then take ba there were some mistakes in the position of electrical points that will need to be rectified the air con trunking was horrible inside the common room but after hearing my id explain why... i guess there is not much choice in how we run the trunking.... other than that, everything is going quite well and we chose laminates for our carpentry already... here are the 3D drawings after laminates were chosen We do not have anything done on the wall on the bedhead wall of the MBR and there is no granite top on the extension holding the glass for the kitchen.... also MBR will be hanging light instead of false ceiling with downlights
  10. ya aerogaz easy to bargain... the bread toaster listed price 19.90, he gave us for 9.90 only kettle 39.90 we got it for 29 weighing machine no idea but he offered 1 for $10 but we got 2 for $10, LOL steamer forgot liao.... but but but.... the hob and hood i tot i remembered him quoting us for $699 some time ago but he put $799.... i think overall still good deal considering 2 cooker induction hob + slim hood. induction hob if any other brand already easily $900 and above liao.
  11. yea maybe other ppl dont care lor. i also ask my ID if can dun care. he say can but anything happen next time he wont be responsible lor. so i think better play it safe la. anyway went up during the weekend to see. now only skirting for the rooms and living area. then the kerb for the kitchen cabinets need to be up before tiling the kitchen floor. plaster materials already up and plastering should start today... also ordered our hood and hob from aerogaz. bought some other misc stuff like bread toaster, electric kettle, steamer, weighing machine and FOC 1 tower fan. almost $900 damage.
  12. yea i saw my friend flat top floor also dun have that thingy... sigh... dunno why suay suay mine have....
  13. i also think its kinda weird la. but my id offer FOC extension. tho its still abit out... putting a painting also kinda weird? and i really wan to seal it up cos i dun wan it to be the entrance point for pests and roaches
  14. aves

    Rd Nest

    haha maybe u can go buy decals/spray and make ur whole aircon unit black. then replace the blue parts with red. like that should be matching liao. hehe
  15. haha its ok man. im just trying to help my fren do business. im not denying that. but at the same time i think his work etiquettes are good so i recommend around lor. if ppl take him, i also dun gain anything ma. lol. at most maybe he buy me some beer. understand your concern wrt ID pm-ing and contacting forummers. I have that experience before too. but personally, I would avoid those cos if they are so free to come renotalk to surf and read ppl renoblog and pm them, i think they must be quite new or bad reputation so no one engage them? LOL. just my personal thought tho. no offence to the IDs here
  16. aves

    Rd Nest

    looks as tho the aircon is blowing stuff out... lol but the color and theme not that matching imo... the aircon too 'hard' and the design too soft? is the light blue 'stripe' on the aircon a layer of 'film'? maybe can take that one out to reduce the color contrast?
  17. seriously i have no idea but i guess its to access the rubbish chute? kinda lame imo and the lock and hinges give me the idea that it has nv been opened before for the whole 19yrs the flat been built. we're still gonna 'seal' up the back portion of the cabinet either way. just pray that they wun need to access it. if need then need to break my cabinet liao
  18. Went up to take a look yesterday evening. Tiling progress is good. Left 2 rooms floor tiles, kitchen floor tiles and all the skirting plus some small corners need to be filled up. Heres some pics Common toilet wall and floor tiles. Kitchen wall tiles, Cabinet side. Only middle part tiled cos the rest will be covered with cabinets Kitchen wall tiles exposed side. Notice the tiles are not purely white? That's cos its got some 'floral' or 'leafy' patterns on it. Looks like stains in the pics. This is one of the headache things we found after hacking. The hole below is the rubbish chute. There is a door on top hidden by carpentry previously. Now we gotta build our top kitchen cabinets all the way to the back to hide this ugly door. Apparently, this can only be found on top floors and according to HDB, this 'door' has to be kept accessible... Thats all for now
  19. project ROM complete. Heres the photo gallery URL www.web-dezigners.com/ROM/gallery.php
  20. i think its 330. from extreme lighting at balestier road. we didnt really take note of the pricing and choose what we liked first. after that then we see overall. kinda over budget but not by much. think we kinda overbudgetted for lights in the first place. u can ask dominic bring u there if engage him. he helped me get a fair bit of discount and free doorbell... budden actually i think it happens with all IDs? shrug
  21. MBR Toilet Light MBR Light (hope its not too dim) Dining Light Kitchen Light Light for 2 x Common Room 1 more light outside my MBR Toilet, very much similar to the above 2 lights. Black + frosted glass. Just smaller 6 x PLC lights 1 x Halogen Spotlight Total Spendings 1200. + Free wireless door bell Common Toilet gonna recycle the current plastic cover light from one of the bedrooms.
  22. Anyway, we've selected our tiles, toilet accessories and lights already. More or less settled the heavy stuff for our reno. feeling relieved and stress at the same time. relieve cos much less things to choose and think about. stress cos worried that it will turn out ugly or not to our liking...
  23. hi mr chong. thanks for your advice. i will be back asking for more advice one my reno is near completion. thanks
  24. lol! brianforever from bob?!?! wow u do the stuff yourself? so good, sure save a lot right? we ended up giving up alot of our carpentry due to budget constraints...
×