  1. Contractor charge me the floor and wall tiles for kitchen and I added $350 to the sum to get him to erect the bottom structure of the cabinet using hollow blocks and tiled using granite effect tiles. Breakfast table tile with wood looking tile and the sides are coated with pebblewash stones along with the sides for the sink support Top surface is the tiles at size 600x600cm 3d of our kitchen done by hubby....he lazy to do the toilet 3d.... will update pics on toilet with installed ariston storage heater and black coloured WC
  2. We did the painting slow and steady. I do agree that it takes lots of patience but I love painting. To me its stress reliever But again if you think of all the money you can save by DIY then its a motivation factor for you to start. Imagine that you need to tell the painter the kind of patterns you want to be on the wall and if they did it wrong, what horror! I will post my nursery room pics once I put all the furnitures together.
  3. Thanks a million!! She is going to be 8 months old in three days to come.
  4. Our current spotlight. Changing to PLC downlight for existing spotlight plus add 4 more points
  5. Initial idea by us but the layout of tiles and trimmings is by contractor Not really new as we had been staying there for about a year. Temporarily staying at mum’s as the dust is bad our daughter. definitely shifting before Hari Raya Not sure whether its granite, I simply chose the tiles at whitehorse and the contractor do it up... The kitchen cabinet carpenter has came to do measurements and quoted $2600 for top 13.5ft and for doors and drawers for the bottom bout 16ft. - ABS trimm and handleless Carpenter is a friend of our contractor....chose black leather laminates for the bottom doors and drawers and red floral for top Paid $1300 and now waiting for another week
  6. Thanks..In fact its value for money. Ask other IDs and they quote them minimun 3k but my contractor quote them much much cheaper.
  7. My balcony with platform and parque Updates on Kitchen
  8. Pics My in-laws feature wall....Done by my contractor. using tiles and craftstone
  9. Take a look at my thread. reno half done up by contractor. just dont expect 3d drawings ...pm me for info if you want http://www.renotalk.com/forum/index.php?showtopic=15875
  10. I did my kitchen, common toilet, balcony and storeroom for 14k. see here - http://www.renotalk.com/forum/index.php?showtopic=15875 this includes WC, storage water heater, parquet platform for balcony, balcony designer wall tiles, wiring and piping and of course kitchen and toilet wall/floor tiles but done by contractor. Dont expect 3d drawings
  11. brushes, tapes and paint probably about $50..... need patience though as I did bout 4 coats over a period of 2 days especially the red paint
  12. balcony platform with parquet pics coming up
  13. have a look at my t-blog halfway done by contractor http://www.renotalk.com/forum/index.php?showtopic=15875
  14. kitchen sink, stove and worktop support up....All concrete. Haha thanks
  15. More photo updates. Vanity top revamped from old fashioned one(as seen in above photos) Vanity top has got additional high wall which has embedded indentations to put items. Brilliant thinking by contractor section separating kitchen area and open space before kitchen door..... The brown top are actually tiles that look like wood.....the top is the breakfast table
  16. About 14k - Kitchen, Common Toilet, Balcony and Storeroom No reno done to living room and the other rooms....hubby and i painted ourselves in 2007 pictures taken b4 furnitures were brought in in year 2007 sorry no pics of mbr available
  17. exactly our intentions but it will be with tatami mats on the parquet and probably a tv console with a 32" LCD but not wall mounted as its quite a heartache to drill the new tiles. haha. sidetrack abit.. Our 7mths old daughter on her palm seat which we just bought but currently stored at my parent's hm
  18. More pictures of work in progress kitchen wall tiled halfway balcony tiled with whitehorse 'rustic tiles' Will add more pics when we take today. Heard that the balcony platform and parquet will take a few days itself to complete. Kitchen wall tiles was designed by the contractor albert to be placed staggered... Will post pics of my parent's hm too - feature wall and PLC light done by my contractor 4days ago concurrently with my renovations. Mum stays 1 block away from me
  19. Additional works - Storeroom Hack existing platform(used by previous owner for prayer table) Change folding door to nyatoh with frame
  20. Scope of work 1) HDB permit 2) Hack existing cabinet, concrete support for stove, floor tiles. 3) Change water pipings and wirings for kitchen and common toilet 4) Supply and install - 1no WC - 1no Water heater storage tank - vanity top cabinet door - 1no aluminium Toilet window 5) New kitchen and toilet flooring from whitehorse 6) overlay kitchen and toilet walls from whitehorse 7) Necessary waterproofing, sand, etc 8) Construct sink, stove and kitchen support with breakfast table - see pics 9) Necessary fridge,washer base, concrete border for rubbish chute 10) Makeover of Vanity top in toilet - re-tile plus construct a concrete panel with indentations to put shampoo etc 11) Acid cleaning, disposal etc Note: carpentry eg doors for concrete support are not done by our contractor. Advised by him to consult his friend who is a carpenter after the works are complete. We even decided to revamp our balcony 1) Hack existing half height wall tiles and arch cornise 2) Lay full height 'rustic' tiles from whitehorse 3) construct platform 4) Lay parquet on platform 5) Boxed up water pipe at balcony 6) Necessary wiring Toilet hacked and wall halfway tiled. Look at the old fashioned vanity Kitchen hacked balcony hacked
  21. Thats fast....thx. I will post once i get the files uploaded to photobucket.
  22. Hubby and I got our keys back in Feb 2007, one month after our wedding. Home Jurong West St 42 5A unit 133sqm We had initially wanted to renovate our Kitchen and common toilet but the plans was put aside when I found out that I was pregnant in May. Now our Princess is already 7months and Our renovations are on the way. We had consulted several IDs 1) Innerview @ IMM - Package price beyond our budget 2) Ideal reno @ Up Bukit Timah - Mid pricing but charges quite high for hacking 3) Line Living @ Imm - Came to view our hm but did not quote despite sms reminders 4) Roslan Renovation @ Geylang - Didnt bother to serve us to quote independently - **** Disappointed 5) Home Way Design @ Geylang - Wanted to confirm but quotation was slightly above our budget 6) Multi-Building Interior Renovation thru Straits Times - Our last attempt. Hubby wanted to find contractor as he can design through software himself. Choice - Multi-building Interior Renovations - Sincere, chatty contractor in his mid 40s. Acceptable prices with great design input coming from a contractor. Photos of work in progress coming up with further details
×