Jump to content
Find Professionals    Deals    Get Quotations   Portfolios

nirvana

Members
  • Content Count

    138
  • Joined

  • Last visited

Community Reputation

0 Neutral

About nirvana

  • Rank
    Gold Member

Previous Fields

  • Gender
    Female

Recent Profile Visitors

1,066 profile views
  1. wah.. I so long never come renotalk.. henry thread becomes so happening! Supersimon, *wave* good to see you still around. Hi everyone my reno was done by Henry in year 2009. you can see my renoblog for the work he has done. It has been about a year plus since and so far so good. My house is still in one place. everything still worked well. So for post reno wise, I am satisfied with his work. If you read my blog, I have my fair share of complaint and grievances, e.g. my reno took longer than expected, was not happy about some of the carpentry don't have ABS (is it correct? means the furniture's edges are raw kind.. not covered) but it was all about expectations and after i moved in, seriously, it did not bother me one bit. I did quite a fair bit of customized carpentry and kitchen cabinets are ikea system so we need to work very closely with Henry and Ah Fai (his carpenter then) and all turned out well. On hindsight, I have to say the working relationship with Henry and his sub-contractors are pleasant. so I would call myself a satisfied customer. To be fair, no one is perfect. I don't think there would be any ID or contractors who will be able to do 100% perfect job all the time. There will be certain % who would, unfortunately, suffer the brunt of the not so efficient side of Henry and his team. So for newbies who want to engage ID or contractors, we need to be aware of the risk. You can source around for the ID or contractors with the highest % of satisfied customers but need to be aware that when it comes to reno (which is itself is a nitty gritty cumbersome project) everything can happen. Plus the mis-alignment of expectations would cause you more grief. Anyway, I am back in the renotalk forum because I am looking to engage Henry for reno my mum's kitchen. was hoping to see some of his recent work and see if he becomes liked another "ah soon" and disappeared from the reno industry. I see quite a number of recent customers and Simon still around so for that and my past experience with him, i am definitely still going back to him to see if he can squeeze in my new project. I am not related to Henry at all. And Simon helped me alot in my last reno. i think he is a kind and generous person who has been helping us newbies with loads of tips. So i don't understand why ppl would be upset with him who is just volunteering his help and advice. If I get henry to do my new project, will do up a separate reno blog to keep you guys posted.
  2. I think paint pretty standard? Until the walls look okay? But hor.. you might want to ask on the price if you are looking to re-plaster your wall. I did not and my wall is rather uneven and using stronger colors on the wall will emphasis the unevenness.
  3. Forgot to reply you on your question. Yes there is a drop for the shower area. It used to be a bathtub in its place so I am not sure if the drop was done previously or created by Henry's guys. The summarized quotation: 1. Hack and demolish 2 bathrooms 2. Tiles for 2 bathrooms 3. Water proofing for 2 bathrooms 4. Supply & install conceal copper piping for 2 bathrooms 5. Labour to install 2 sets of toilet bowl, wash basin, heater tank and accessories 6. Design and fabricated 2 sets of suspended vanity cabinet 7. Supply and install solid top with big mirror for both vanity 8. Supply and install 2 sets of 10mm tempered glass shower screen with kerb 9. Demolish existing kitchen cabinet 10. Overlay tiles for wall - expose portion 11. Hack and lay heavy duty flooring tiles for kitchen and yard area 12. Design and fabricate laminated kitchen cabinet - 36ft 13. Customized solid surface kitchen worktop (use better grade LG worktop so got top up from original) 14. Customized color glass backing between k/cabinet - L Shape 15. To disconnect and re-connect in/outlet of sink tap 16. Demolish Existing wardrobe in master bedroom 17. Design and fabricate laminated TV feature wall 18. 360. Deg. design for TV hinges 19. Customized laminated full height storage cabinet 20. Customized full height shoe cabinet with curve design beside storage cabinet 21. Haulage and dumping debris fee 22. Floor Protection, general cleaning and acid wash 23. Painting for entire house - nippon 5000 vinilex up to 6 colours 24. Alum. casement window at balcony 25. To construct false ceiling at master bedroom, room2, dining area and passage 26. To construct L - box ceiling **** 27. To construct concrete wall at m/bathroom 28. Suspended full height cabinet to box up meter box 29. To grind and repolish existing parquet flooring 30. Extra cost (upgrade) for wall and floor tiles 31. Cove light design **** hall ceiling 32. Installation of ikea accessories for k/cabinet 33. To paint m/room new partition wall (done up for my Alumix closet) 34. Extra drawer set for master toilet vanity 35. To change 8 sets roller for existing big sliding balcony door 36. To box up 2 sets of door frame for kitchen and m/bathroom 37. Customized wooden sliding door with lockset at m/bathroom Total cost: Approx $28,500 Not including Alumix closet, Ikea fittings, dressing table (not done yet)
  4. Thanks Muesli. Very touched leh.. must come in more often to chit chat... Gam siah.. my htb will be over the moon when I tell him your comment. He put in ALOT of thoughts on how to conceal wires... Thanks thanks! I like the color too! And everytime I step into the house.. I will think.. "thank god choose the right shade" heee... Ya loh.. white kitchen very chio hor.. but hor.. we became cleaning fanatic.. see any stain will start to rub rub rub.. hopefully we will wean off this bad habit.. I want to enjoy the house.. not slave for it!! Thank you!! All thanks to your great recommendation on Henry! Thank you thank you! I was abit worried that the wood color looks abit 80s.. but will live with it la.. hehe.. thanks for the heartening comments!
  5. Put there for storage la... when cooking will bring down to counter top.
  6. Cos we got the white storage cabinet on the left of the dining so had to align the downlights along it.
  7. Masterbedroom toilet - Old Masterbedroom toilet - Now
  8. Common toilet - Old Common toilet - Now
  9. Masterbedroom - Old Masterbedroom - Now (aiyoo.. pls pardon our messy clothes stand)
  10. Living room - Old Living room - Now
  11. House still in a mess due to parties after parties.. Photos of completed reno Finally! Still need to do rectification with Henry. But all quite minor one.. funny leh.. he never come and chase us.. Dining room - Old Dining room - Now
  12. Hi hcbing! Hmm.. let me sort out my unpacking cos I think the quotes are quite all over the place now.. moreover we have not settle the final bill with Henry so there are some items that are still with no price tag yet! Give me a while.. Thks!
  13. Merry Xmas and HAPPY NEW YEAR to you!! Sorry about the MIA. Shifted in officially last Wed so had been really busy cleaning and unpacking. And Starhub has been just fixed so I have internet in the house finally! I am sorting out some before after photos. Anyone can suggest some easy to use software to "stitch" the photos together? I am using iMac. Thanks!
  14. Dropping by to say hi! Your place is SPACIOUS! Loads of space.. *envious* Hope all the reno progress will be smooth smooth.. Good luck!! Can't wait to more progress..
×