Hi all EM bros & Sis, wanne your could advise following quotation reasonable , my place is at Mei Ling Street EM. Thks and happy new year
ITEM ( RENOVATION WORK AT GROUND FLOOR ) $
( MAIN ENTRANCE AREA )
1) Supply & install new main door lock . $150.00
( LIVING , DINING , BALCONY & STUDYROOM AREA )
1) Supply labour to hack existing flooring tiles **** , dining , balcony & studyroom , $1,200.00
include labour to dismantle existing awing roofing at balcony .
2) Supply ( 24' x 24" ) imported polish homogeneous floor tiles & labour to lay **** , $4,500.00
dining, studytable & main balcony flooring with skirtings .
( Selected floor tiles base on $ 3.00 per sq ft )
3) Supply material & labour to custom made roofing at balcony . $2,500.00
a) Material : in polycarbonate roof
b) Frame : in kapo wood
4) Supply & install casement window **** & balcony . $1,450.00
a) Material : in aluminium frame ( silver or ba ) colour .
b) Glass : in H.D.B. tinted glass finishing .
5) Supply machinery & labour to vanish existing staircase step only with oil paint finish . $400.00
( KITCHEN & GROUND FLOOR BATHROOM )
1) Supply labour to hack existing floor tiles , wall tiles , all cement base & kitchen cabinet . $950.00
2) Supply ( 12" x 24" ) inported mat homogeneous floor tiles & labour to lay at flooring at $900.00
kitchen flooring .
3) Supply ( 12" x 12" ) imported mat homogeneous floor tiles & labour to lay at flooring at $350.00
ground floor bathroom flooring .
4) Supply chemical & labour to do water/proofing at both area flooring . $300.00
5) Supply material & labour to build cabinet , fridge & washing machine base with tiles $400.00
finishing .
6) Supply ( 10" x 13" ) imported shinning ceramic wall tiles & labour to lay at wall up to $3,600.00
ceiling height at both wall area .
7) Supply stainless steel piping & labour to run water inlet for sink , w/mashine , toilet bowl, $650.00
& wash basin area .
8) Supply labour to install kitchen sink , sink tap , toilet bowl & wash basin . $400.00
9) Supply P.V.C piping to run water outlet for sink , w/machine & wash basin . $150.00
10) Supply & install custom made kitchen cabinet come with all items below : >
a) Mateial : in soild ply wood with laminate finishing .
b) All door with A.B.S trimming finishing .
c) 01 no s/steel dish drainer & 01 s/steel wall backing at behind cooker . $220.00
d) Total length for top & bottom cabinet : > 45 ft appox $4,500.00
11) Supply & install custom made ( china ) granite table work top for cabinet . 27 ft $2,565.00
ITEM ( RENOVATION WORK AT SECOND FLOOR ) $
( 03 BEDROOMS & FLOOR LANDING AREA )
1) Supply machinery & labour to vanish existing parquet flooring with oil paint finish . $950.00
2) Supply labour to dismantle existing 03 bedrooms floor frame & touch-up demage flooring . $300.00
3) Supply & install soild wooden door frame for 03 bedrooms . $600.00
4) Supply & install casement window at master/bedroom area . $725.00
a) Material : in aluminium frame ( silver or ba ) colour .
b) Glass : in H.D.B. tinted glass finishing .
( SECOND FLOOR COMMON/BATHROOM & MASTER / BATHROOM AREA )
1) Supply labour to hack floor tiles , wall tiles & all bathrooms accessories . $1,200.00
2) Supply labour to hack open new entrance & made good finishing c/.bathroom . $150.00
3) Supply ( 12" x 12" ) imported mat homogeneous floor tiles & labour to lay at both $1,100.00
bathroom flooring
4) Supply chemical & labour to do water/proofing at both bathroom flooring . $300.00
5) Supply ( 10" x 13" ) imported shinning ceramic wall tiles & labour to lay at wall up to $3,300.00
height at both bathroom wall .
6) Supply s/steel piping & labour to run water inlet for wash basin , heater & toilet bowl . $600.00
7) Supply labour to install wash basin , toilet bowl , storage heater & shower mixer . $600.00
8) Supply & install 10 mm thick , clear glass with temped glass shower screen with kerd . $1,100.00
9) Supply & install aluminium frame with arcylic panel bi-fold door 01 no . $250.00
( PAINTING WORK )
1) Supply ( NIPPON ) paint material & labour to do painting for whole house , $1,800.00
( selected colour 06 nos )
( HUALAGE SERVICE )
1) Supply labour to carry all material up to unit . $300.00
2) Supply container & labour to clear all rubbish out of site . $300.00
Total sum : $38,760.00
G.S.T $2,713.00
GRAND TOTAL SUM : > $41,473.00