Jump to content
Find Professionals    Deals    Get Quotations   Portfolios

skyline

Members
  • Content Count

    18
  • Joined

  • Last visited

Posts posted by skyline


  1. good progress!

    hi,bro. many thankx for yr tips/recommend pmed me.. haha

    my reno now in final stage, hoping for early move-in(handover by 25-july,

    keep rushing them now..haha

    my layout,is opposite of yrs, :D

    tat's y , i keep track on yr blogs very long and try to get some idea on reno and asked u many things,haha.

    will update more pics soon,


  2. hi,

    potatoes,

    ya, kitchen now all up and ready, left solid surface only.will ready by next tue.

    the tiles is from hafary, abit pop-out effect, very nice,my wife and i loves the effect.

    but problems is, the wire casing/the wall plug case/ swtiches, all will have a small wave gap in between,(becos not flat surface),so only way is silicon touch-up. haha,

    will update more pics soon.


  3. hi all.. i am new here.. just got my house key... plan to do shower screen in my MBR...anyone mind to PM me the "hot" contractor being discussed above...? hehe...thanks...

    hi all..i need rendell and fly's contractor number..

    anyone have,pls pm me..

    thankx alot. ;)


  4. UPDATED WITH QUOTATION 2

    I just got a quotation from a ID/contractor... Current flat is about 25 years old... It's time to change all the wiring, paint the house and reno the kitchen...

    Quotation 1

    1. General & Wet Work

    1.1 Supply labor & materials to hack existing kitchen and 2 bathroom $1950

    1.2 Supply labor & materials to lay new selected ceramic wall tiles for 2 bathroom $2550

    1.3 Supply labor & materials to lay new selected floor tiles for 2 bathroom $1250

    1.4 Supply labor & materials to lay new selected floor tiles for kitchen,include waterproofing $1350

    1.5 Supply labor & materials to sand & cement with smooth cement plastering at kitchen wall $1800

    1.6 Supply labor & materials to construct 50 mm high concrete kitcehn cabinet base $380

    1.7 Supply labor & materials to construct concrete door kerb for both toilet entrance $90

    1.8 Supply labor & materials to change new stainless steel refuse chute with lock level $200

    2 Electrical Work

    2.1 Supply labor & materials to re wire and install (everything required in the house) $1800

    3 Plumbing work

    3.1 Supply labor & materials to change & install new copper piping works for whole house $680

    3.2 Supply labor & materials to install outgoing PVC waste for kitchen and 2 toilet $150

    3.3 Supply labor & materials to convert squatting pan to seating WC bowl $220

    3.4 Supply labor & materials to change new UPVC main waste pipe at common toilet $550

    3.5 Supply labor only to install all sanitary ware

    4. Aluminium Works

    4.1 Supply labor & materials to install white powder coated bi-fold door for both toilets S500

    5. Carpentry Works

    5.1 Supply labor & materials to install low portion kitchen cabinet with works table top in laminated finishes $2800

    5.2 Supply labor & materials to install storage cabinet at kitchen in laminated finished $1650

    6. Painting Works

    6.1 Supply labor & materials to paint the whole house wall & ceiling including kitchen wall $1500

    Total: $19870

    Quotation 2

    1. Toilet (Common Room and Master BedRoom)

    1.1 Hack off existing flooring tiles for both toilets

    1.2 Supply and lay homogeneous non-slip design for both toilets flooring

    1.3 Supply and lay water proofing for both toilets flooring

    1.4 Hack off existing wall tiles for both toilets

    1.5 Supply and lay wall with design tiles up to ceiling height for both toliets

    1.6 Supply manpower to install 2 toliets sitting bowl with dual flush

    1.7 Supply and install 1 aluminuim bi-fold door for master toliet

    1.8 Supply and install 1 aluminuim bi-fold door for common toliet

    1.9 Dismantle and dispose sitting bowl and wash basin for 2 toilets

    1.10 Dismantle and dispose toilet door for both toilets

    No. 1 - No. 10 : $4880 (package)

    1.11 Supply manpower to convert squatting to sitting bowl for common toliet $150

    1.12 Supply manpower to install 1 instant heater for toilet $100

    1.13 Supply labour and materials to hack all santiary ware for 2 bathroom FOC

    1.14 Supply labor and materials to construct concrete door kerb for both toliet entrance FOC

    1.15 Supply labor only to install all sanitary wares (e.g. sink & mixer, shower and mixer, spray gun) FOC

    2. StoreRoom

    2.1 Construct new storeroom with hollock block and cement finishing $500

    2.2 Supply and install 1 new door frame for storeroom $180

    2.3 Supply and install 1 classic door for storeroom $200

    3. Kitchen

    3.1 Supply and lay kitchen flooring with water proofing $180

    3.2 Supply and lay kitchen flooring with tiles $750

    3.3 Construct kitchen base with tiles FOC

    3.4 Hack off exisiting kitchen wall tiles $400

    3.5 Supply and lay kitchen wall tiles up to ceiling height $2300

    3.6 Hack off exisiting sink support $50

    3.7 Fabricate and design kitchen cabinet with laminate finish. Est 25ft $2500

    3.8 Supply and install solid surface kitchen table top. Est 15ft $1050

    3.9 Supply and install stainless steel pipes for kitchen and toilets $580

    3.10 Supply labour and materials to hack kitchen caninet set FOC

    4. Wiring

    4.1 13 amp double point @ 8 pts X $55

    4.2 Heater point @ 1 pt X $90

    4.3 Telephone point @ 1pt X $45

    4.4 SCV point @ 1pt X $90

    4.5 Lighting point @ 9pts X $45 (including install of lighting)

    4.6 D/B $350

    4.7 Fanpoint @ 1 pts X $55

    4.8 Earth point @ 2 pts X $40

    5.Others

    5.1 Hack off exisiting rubbish chute and re-install 1 new stainless steel rubbish chute $160

    5.2 Acid wash for kitchen and toilets flooring and wall tiles $100

    5.3 Painting for whole house with ICI or Nippon emulsion paint included ceiling and pipes $850

    5.4 Haulage Charges $520

    5.5 HDB permit fees FOC

    5.6 In-outlet for sink FOC

    5.7 In outlet for washing machine FOC

    5.8 Arrangement fot PUB gas FOC

    5.9 Supply manpower to install stainless steel bowl for kitchen FOC

    5.10 Supply manpower to install sink level tap for kitchen FOC

    5.11 Supply manpower to install cooker hob FOC

    5.12 Construct fridge base with tiles FOC

    5.13 Construct washing machine with tiles FOC

    5.14 Supply manpower to install 1 ceiling fan for living hall FOC

    5.15 Supply and install dish tray for kitchen cabinet FOC

    5.16 Supply and install dABS trimming for kitchen cabinet FOC

    Total : 17K

    As compared to my first quotation, the second quotation is cheaper? What you all think? Did I miss out anything? Any hidden cost that I might overlooked... Please comment k? THANKS

    hi..can u PM me the contact of yr 2nd qoutation contractor?

    thankx

×