Not sure whether this is expensive but I've paid a deposit and decided on my ID. Here is the breakdown of what they will do:
Masonary Works
Supply & lay 300x600 heavy duty ceramic wall tiles up to ceiling height.
Supply & lay 300x300, 300X600 homogeneous floor tile lay 1:3 cement screed for wall & floor
Lay water proofing menbrance.
Construct cement base for kitchen cabinet, fridge & washing machine with tile finish. (Supended cabinet base using approved 63mm hollow block)
Plumbing / Sanitary Works
Changing existing piping to stainless steel pipe (cold piping) (isolate valve for whole house)
Supply & install 2 X dual flush sitting bowl & pan collar. (johnson sussie)
Labour to install kitchen sink & taps.
Carpentary Works
To supply, design & fabricate 20ft ABS kitchen cabinet
To supply & install 1 stainless stain dish rack
To supply & install 10ft china granite kitchen work top.
Labor to install hood & hob.
Door Works
Supply & install 3 X aluminium (WPC) bi-fold door c/w acrylic panel (Bes-glass)
Electrical Works
Re-instate kitchen & 2 bathroom wire.
Hacking Works
Hack off existing wall tiles
Hack off existing floor tiles
Dismantle existing kitchen cabinet
Dismantle existing 2 nos of toilet bowl & basin
Miscellaneous Works
Haulague
Chemical wash for kitchen & 2 bathroom
HDB renovation permit fees
Free item
Stainless steel sink & taps
2 X instant heater
2 X Accessories with mirror
Hood & hob (mayer brand)
2 X two way taps
Stainless steel flat type rubbish shute
Washing machine taps
Additional items
1. Labor to demolish wall for new toilet entrance. Inc cement make smooth to damage area
2. Labor to demolish wall between living & kitchen. Inc cement make to damage area
3. Supply & install 10mm tamper glass sliding door between living & kitchen. ( 1 fix panel & 2 sliding panel) inc false beam.
4. Supply & install 10mm tamper glass show screen in master bathroom
5. Supply & install 8ft addtional kitchen cabinet
6. Supply & install 7ft additional china granite worktop
7. Design & fabricate solid ply laminate finishing full height shoe rack cum storage. Est 8ft
8. Design & fabricate solid ply laminate finishing full height feature wall cum TV console Est 8ft. (Double side laminate finish)
9. Design & fabricate solid ply laminate finishing supended vanity cabinet. Est 2.5ft. Inc round basin, long taps, mirror & granite top.
Electrical works
Light point @35 per point
Double power point @55 per point
Single power point @45 per point
SCV point @120 per point
Tel point @45 per point
Install light @10 per light
10. Supply & install false ceiling for bedroom foyer
11. Design & install fabrous for living
12. Supply & install 7 Nos of PLC light & light point for living & dining
13. Suuply & install 2 nos of cove light & light point
14. Supply & install 1 nos of light point for dinning (Dining light provide by owner)
15. To paint whole house with ICI/NIPPON emulsion paint. Inc all piping, sewage, door, main door & gate. (up to 5 colour)
16. Remove Bedroom 3 wardrobe
17. Change Master Bedroom wardrobe door
Extension to Master Bedroom toilet
18. Erect Wall in Master bedroom using gyrsum board
19. Hack portion of flooring in master bedroom
20. Waterproof for portion flooring in Master bedroom
21. Lay portion of floor tiles in master bedroom
22. Bedroom 3 wardrobe @7ft
Total Reno Cost: $28,310.
Do you guys think this is reasonable?