Jump to content
Find Professionals    Deals    Get Quotations   Portfolios

Marcus168

Members
  • Content Count

    36
  • Joined

  • Last visited

Everything posted by Marcus168

  1. You can check the transaction price at HDB Website. I paid 8K COV Check HDB Transaction Price (Updated half monthly) 436 Jurong West Ave 1 06 to 10 133.00 Model A 1985 $356,000.00 Sep 2009 443 Jurong West Ave 1 06 to 10 133.00 Model A 1985 $338,000.00 Sep 2009 426 Jurong West Ave 1 06 to 10 133.00 Model A 1985 $365,000.00 Aug 2009 427 Jurong West Ave 1 11 to 15 133.00 Model A 1985 $357,000.00 Aug 2009 436 Jurong West Ave 1 06 to 10 135.00 Model A 1985 $336,800.00 Aug 2009 444 Jurong West Ave 1 01 to 05 135.00 Model A 1985 $313,000.00 Aug 2009 436 Jurong West Ave 1 06 to 10 133.00 Model A 1985 $345,000.00 Jul 2009 443 Jurong West Ave 1 01 to 05 133.00 Model A 1985 $348,000.00 Jul 2009 444 Jurong West Ave 1 06 to 10 135.00 Model A 1985 $300,000.00 Jul 2009 444 Jurong West Ave 1 01 to 05 135.00 Model A 1985 $330,000.00 Jul 2009
  2. Will ask the tile contractor later. Let see how much discount he can get.
  3. i went down 2 tiles supplier. Just order from them and ask contractor to cater to move from ground floor to my unit when they are hacking, that it. Have not decide which to buy from yet. Will get advise from contractor later. The tiles supplier will estimate the number of tile need. The only thing is the contractor will charge more for laying tiles and they did not get commission from the tile?? If i got the tile from supplier, can bargain with them and get 10% discount.
  4. Will be meeting one of the contractor today. This contractor is doing tile work. Not sure what will be his quote. Get a quote from Tiler seng (From this forum) for 9k for doing when main work. His qoute does not include tiles as I am buying tile myself. Will get a few quote before deciding. Now still deciding what to do for my bedroom. Either use laminate or same as living room. Any good recommendation. Here a picture if use tile for living, dining and bedroom.
  5. Used a free software 3D tools to design my house. That is google sketchup. This this the first design
  6. After sourcing hdb flat for almost 2 years, finally got one at 5A hdb flat jurong west for 338 K. Will be getting my key on 19 Oct and now preparing for my renovation. Budget for my renovation is 30K excluding furnishing. After doing some research in the internet, decide to manage the renovation myself. Not sure how will it turn out? Here is the floor plan
  7. Do a google search and found this in renotalk http://www.renotalk.com/forum/index.php?showtopic=12954
  8. Anyone have problem with 800 * 800 homogeneous tiles? According some ID and contractor i checked. Some advice me not to go for 800 * 800 as the tile is uneven. Some 800 * 800 tiles will have small curve at the middle. How 800* 800 better or 600*600 better? 800 * 800 is more expensive and the laying it is more expensive. Personally i like it to be 800 * 800 as i have a big living hall? Any comments?
  9. Any one know the average price of the following > Hacking psf (Including of removal of debris) > Laying Tile (600*600) psf (Not including Tile) > Laying Tile (800*800) psf (Not including Tile) > Laying Tile for kitchen and 2 toliets wall and floor psf (Not including Tile) > Plastering a 5A (133sqm) hdb flat Thanks
  10. Early in the week went to look for material for my house renovation. After asking my friend and searching the internet. Filter out 2 places to look for it. First is Lian Seng Hin Trading at 568-A Balestier. The homogeneous tile there price from $2.00 to $5.00. Most of them imported from China. The service is good even i have not decide to buy from them, after selecting model, they give me some sample. Ask them for discount from the fixed price and they me give 10% from display price. There are about 10 display for restroom design at second story. Next went to Toh Guan. This is a big place. Sale person basically bo chap. Went there and walk for almost 1 hr. The second story got lot of design ideas for u to see. A very good place for u to see what design for u to choose. After seeing both - Get confuse what to choose - There are to many option for u to choose. It give a very good ideas of how many sample and price ($2.00 psf to $11 psf). Still have not decide which to buy from. But will be deciding after seeing the contractor who will do the tile work coming week. This contractor who do tile work. It recommended from my friend who say his workmanship good.
  11. Is a difficult decision for me to choose between Ala - Carte or just leave everything to a single contractor. After some consideration, decide to do an ala carte as i am working freelance, so time arrangement for me is flexible. So decided to give it a try. Objection is to do it with the same cost but with better workmanship and material. My renovation for my 5A 133 sqm HDB Resale Flat. Will be getting my flat around 19 Oct. Currently doing some research. As a comparison, i got a free Quote for my whole house renovation for about 35k. A. S $2,550.00 - HACKING & DEMOLISH WORK 1. S $1,800.00 Labour to hack, demolish & dismantle wall tiles, floor tiles, base, W/C,basin, kitchen cabinet ****, dining, kitchen, Bath/W.C 1 & 2. 2. S $ 550.00 Haulage, debris removal services for whole house. 3. S $ 200.00 Chemical washing wall & floor tiles at whole house. 4. S $ F.O.C Laying of floor protection after completion of flooring. 5. S $ F.O.C Apply HDB permit. B. S $9,040.00/S$9,790.00 - GENERAL WORKS 1. S $2,000.00 Supply & install (BA/NA) Alum. Casement window(140sq.ft+/-) with normal glass panel for living, 3 bedrooms & kitchen(Subject to HDB approved) 2. S $1,740.00 Supply & install (BA/NA) Alum. casement window with normal glass panel for balcony area(Subject to HDB approved)(116sq.ft +/-) 3. S $1,600.00 Supply & install alum window grilles with normal design for whole house. 4. S $1,200.00 Supply & plaster whole house ceiling only. 5. S $ 950.00 Supply & paint whole house wall & ceiling with emulsion paint. (Include sewerage pipes & door frame)(Paint 2 coats)(5 colours)(Ceiling using Maxilite paint) 6. S $ 250.00 Labour to Re-vanish / paint 5 nos. doors. 7. S $1,200.00 a. Supply & install 10mm THK temper glass with 1no swing door at balcony entrance. 8. S $1,950.00 b. Supply & install wooden door with glass finish at balcony entrance. C) S $6,250.00 BUILDERS’ WET WORK - LIVING HALL AREA 1. Supply & lay (600x600mm) polish homogeneous floor tiles ****, Dining balcony. S $3,500.00 2. Supply & lay (600 mm) polish homogeneous skirting ****, dining, store, 3 bedrooms & balcony. S $ 650.00 3. Labour to overlay laminated floor with skirting finish at 3 bedrooms. S $1,800.00 4. Supply & labour to hack skirting with plaster smooth at 3 bedrooms. S $ 300.00 D. S $8,790.00+/- KITCHEN WORK 1. Supply & install copper piping for kitchen. S $ 280.00 2. Supply & install kitchen sink inlet/outlet pipe.(Include PVC pipes) (Material supply by Owner) S $ 80.00 3. Supply & install washing machine inlet/outlet pipe.(Include PVC pipes) S $ 80.00 4. Supply & lay homogeneous anti-slip floor tiles for kitchen floor. S $ 880.00 5. Supply & lay waterproofing for kitchen floor. S $ 200.00 6. Supply & lay full height wall tiles for kitchen area. S $2,600.00 7. Supply & construct cabinet base with side tiles at kitchen. S $ 100.00 8. Supply & construct fridge base with full & side tiles. S $ 80.00 9. Supply & construct washing machine base with full & side tiles. S $ 80.00 10. Supply & construct sink & stove support with homogeneous tiles finish S $1,450.00 11. Supply & install 2pcs. Alum door below sink support. S $ 240.00 12. Supply & install 4pcs. Alum door below stove support. S $ 480.00 13. Supply & install 1 NO. Flat stainless steel Dustbin at kitchen S $ 200.00 14. Design and fabricate kitchen cabinet in laminated door and ABS Trimming (C/w internal of white PVC)(Total: 17ft +/- x S $100.00) S $1,700.00 15. (Include handle, 4 drawers, cutlery tray, 2 PCS. Glass door) Supply & install solid top for kitchen work top. (Total: 6ft x S $70.00) S $ 420.00 E. S $5,640.00 BATH/W.C 1 & W.C 2 1. 1. Supply & install copper piping for 2 toilets. S $ 320.00 2. Supply & install hot copper piping for 2 toilets. S $ 320.00 3. Labour to install 1 no. tank heaters for 2 toilets. S $ 120.00 4. Supply & lay homogeneous anti-slip floor tiles (300 x300mm) for bath/W.C 1 & 2. S $ 700.00 5. Supply & lay waterproofing for 2 toilets floor. S $ 300.00 6. Supply & lay full height wall tiles for Bath/W.C 1 & 2. S $2,400.00 7. Labour to install 2 nos. sitting w/c bowls at bath/W.C 1 & 2. S $ 200.00 8. Supply & install toilet basin inlet/outlet pipe for 2 toilets.(Include pipes) S $ 160.00 9. Supply & construct long bath support with tiles finish at bath/W.C 1. S $ 680.00 10. Supply & install 2 nos. Alum. Frame Bi-Fold door with PVC panel at bath/ W.C 1 & 2. S $ 440.00 11. Labour to install toilet accessory at Bath/W.C 1 & 2. S $ F.O.C F. S $1,960.00+/- RE-WIRING WORK To supply & labor to install re-wiring with 1. - Main circuit breaker (14way) S $ 350.00 2. - Lighting point 12 nos. +/- x S $ 40.00 per pt S $ 480.00+/- 3. - Install Light 12 nos. +/- x S $ 10.00 per pt S $ 120.00+/- 4. - Single sockets 4 nos. +/- x S $ 40.00 per pt S $ 160.00+/- 5. - Double socket 10 nos. +/- x S $ 50.00 per pt S $ 500.00+/- 6. - SCV point 1 no . +/- x S $100.00 per pt S $ 100.00+/- 7. - Water Heater Point 1 no. +/- x S $100.00 per pt S $ 100.00+/- 8. - Air-Con Point 1 no. +/- x S $100.00 per pt S $ 100.00+/- 9. - Tel. Point 1 no. +/- x S $ 50.00 per pt S $ 50.00+/- TOTAL PRICE: S $ 34,230.00+/-/ S $34,980.00+/-
×