Jump to content
Find Professionals    Deals    Get Quotations   Portfolios

ngunadi

Members
  • Content Count

    932
  • Joined

  • Last visited

Everything posted by ngunadi

  1. Anyone use Panasonic Inverter System 3 CS-S9JKZWx3(CU-3S27JKZ)? My wife likes it very much because of it's cool design. But I am looking in terms of feature, durability and price?
  2. Thanks. We have not found contractor yet. I have contacted some but yet to meet them. Is it really overhaul? We try to minimize as much as possible so the main job is only on both toilets. The other works are just touch-up to make it presentable. Hopefully all can be done below $15k. Otherwise, I would cut down other works like the kitchen countertop and stove. I think the sink really has to change. I would post the current house photos once we get our keys (fingers crossed) ps: I saw your eubiq solution. It's really cool. I want to install it in my tv cabinet and study table. For kitchen, I already allocated 4 power sockets for each side of the kitchen. But I think eubiq has to wait until all the renovation is completed.
  3. The Layout The Works DEMOLITION WORKS [KITCHEN] Hack sink, stove and countertop [LIVING ROOM] Hack built-in furniture and feature wall (gypsum) [2 TOILETS] Hack floor tiles [2 TOILETS] Hack wall tiles [bEDROOM 2] Hack all built-in furnitures [bEDROOM 3] Hack study desk and bed-frame [MASTER BEDROOM] Hack bed-frame and headboard and vanity table [bALCONY] Remove glass door [ALL] Haulage (Compulsory) MASONRY [TOILETS] Supply and lay wall tiles [TOILETS] Supply and lay floor tiles (includes waterproofing) [bALCONY] Supply and lay floor tiles WOODWORKS & WETWORKS [KITCHEN] Install cooker hob [TOILET] Supply and install glass shower screen [TOILET] Supply and change aluminium bifold door [TOILET] Supply/install new vanity counter with solid surface CARPENTRY [KITCHEN] Supply and install 2 doors for kitchen cabinet [KITCHEN] Design, supply and install Solid Surface [LIVING ROOM] Supply and install feature wall with gypsum with paint finish, L 2.4m H +/- 2.7m [DINING ROOM] Box up the power cable [DINING ROOM] Install mirror L 1m H 2m (5 nos) [bALCONY] Box up the pipe [TOILET] Supply and install cabinet PAINTING WORKS [ALL] Plaster wall (If necessary) [ALL] Dulux/ICI paint for all internal wall and ceiling with 2 colours warm white and brown [KITCHEN] Paint kitchen cabinets and change door handles [MASTER BEDROOM] Paint cabinets and change door handes [LIVING ROOM] Paint shoes cabinets PLUMBING [COMMON TOILET] Supply labour to install one toilet bowls, one basin and one water heater [MASTER TOILET] Supply labour to install one toilet bowls, one basin and one water heater and glass shower screen [KITCHEN] Install sink and tap OTHERS [KITCHEN] Supply and install black glass backsplash panel @ kitchen stove +/- 3.8m [ALL] Change whole house window locks [bALCONY] Supply and install aluminium windows +/- 4m run [bALCONY] Supply and install aluminium white casement windows blue-tinted glass [LIVING ROOM & DINING ROOM & BEDROOM] Marble Polishing [MASTER & COMMON BEDROOM] Installation of Inverter Air-conditioner 3 System [ALL] Cleaning and Chemical Wash ELECTRICAL [ALL] Supply and rewire ceiling lighting points + install lights (X nos) [ALL] Supply and change all existing electrical sockets [ALL] Supply and change new electrical sockets (additional double @$60, single @$50)" [ALL] Supply and install 1 SCV point [ALL] Supply and install 1 telephone point
  4. I am always the silent surfer of renotalk. But let me contribute a little bit of my renovation journey. ---- 30 December 2009 Finally, the missus and I are going to have place to settle down. We have done the necessary paperwork on the HDB 1st appointment. Now, it's 8 more weeks before the renovation starts. It takes awfully long period from the case registration and the 1st appointment. Now, the missus and I are actually preparing for our renovation. We are hoping that the renovation could start 1-2 days after the keys handover. We would to quickly start the renovation to quickly settle the house. Who doesn't want to have his own place? On another note, my mum also pushed me not to move-in on April due to qing ming. My wife is a designer so naturally she takes charge of all the designing. While I am in charge of butting-in and argue with her for practicality sake . Both of us agreed to save cost by minimize the renovation. As such, we are inclined to just hire contractor. The main job for the renovation would be: Total renovation of master bathroom and common bathroom. Both are dirty and not usable. Beyond redemption.Conversion of outdoor balcony to be study area. I insist to have a designated study area.Change the kitchen counter top, stove and sink. Too old so need to be updated.Change of 10 years old aircon. Too old also.Touch up of the wall & ceiling painting, cabinets' painting and marble polishing. Minimal renovation right?
  5. Hi dmay, Is this water heater good? What's the difference between this and those ~~$100 water heater? Btw, what's the brand ? I am considering
×