Reno @my Simei 4a Resale Flat
btw, during the 10 days, main door would be hacked also and temporary door would be up. Adding on, 10 days later, all the lights + fan would be fixed up. Kicthen cabinates and master bedroom cupboards would start installing. So say by end of the 3rd week of April, should be finished and just left intense inspection for anything to rectify loh...
-
Reno @my Simei 4a Resale Flat
Ha.. Mayb huh.. my colleague same period with me but diff unit leh.. Hope you get a good quote from Henry...
-
Reno @my Simei 4a Resale Flat
Ha.. Thanks Simon..
-
Reno @my Simei 4a Resale Flat
21 days into Big Reno, wiring for my rooms, kictchen, toilets, false ceiling and L-Box is up. No switches yet until painting is done. 26 days, fixed piping for aircons. 27 days, stainless steel piping is up and running all except washing basin in kitchen. 29 days, did some small rectifications to small dripping of pipes. CityGas came to lay pipes for use of government gas. Meet Carpenter for final designs of kictchen cabinet and master bedroom cupboards and dressing table. Henry came also to list what needs to be rectified before false ceiling and L-Box goes up. Things to be fixed included fridge and washing machines base. Next week, would start those small rectifications and setting up for false ceiling and L-Box. After which would be painting of whole house. all these estimates 10 working days, as announced by Henry.
-
Reno @my Simei 4a Resale Flat
Ha.. i'm honoured!.. but u make have to take an empty hse w no furniture.. Ha.. mayb can photoshop some in.. Ha. Wow!.. planning to become a professional photographer? hey.. you could start a small biz. Help ppl create a small album on their newly renovated houses. Good idea huh? Ha..
-
Reno @my Simei 4a Resale Flat
Wow.. Thanks Simon.. Ha.. Did u take pics of all the henner homes? but i would be spreading buying of things slowly though.. coz bleed too much and too fast liao..
-
Reno @my Simei 4a Resale Flat
New door frames for 2 guest rooms with vendilation holes above the door sealed up. Floor tiles for guest room 2 almost done Floor tiles for guest room 1 almost done. And new "Push out" windows
-
Reno @my Simei 4a Resale Flat
My patch up wall for the master bedroom toilet. New Slide windows Henry's recommendation of "UFO" style.. Ha.. Some mistakes.. should have used white shiny tiles instead. And a few ppl commented my common toilet is nicer then master bedroom toilet.. : (
-
Reno @my Simei 4a Resale Flat
My Kitchen with my 3D wall tiles Low wall to hide the washing machine with my black floor tiles. New "Push windows" and abit of the newly relocated common toilet entrance.. Ha.. Common toilet's wall tiles. Toilet small so hard to take pics of the whole place loh..
-
Reno @my Simei 4a Resale Flat
17 days into my Big Renovation... My Living/Dining area with homogenous tiles w tile skirting all done up..
-
Reno @my Simei 4a Resale Flat
Hi gals_mama. Reno cost at the moment is about $35k.. excluding rewiring, light fixing etc. Of coz price mentioned is excluding things like lights, tapes, sink etc.
-
Reno @my Simei 4a Resale Flat
Floor tiles and funy round corners gone. Kitchen tiles and storeroom gone too.. Ha..
-
Reno @my Simei 4a Resale Flat
My house after 2 days of hacking.. Door Frames from my 3 rooms is gone. Workers suppose to hack only the door frame of toilet but hacked more then needed
-
Reno @my Simei 4a Resale Flat
smart phone? Ha.. Hmm.. he go often mayb coz near his office bah.. Ha...
-
Reno @my Simei 4a Resale Flat
Our Plan We're planning for a black and white theme for kitchen and toilets. Kitchen would be open concept. (Less cooking = less cleanup) Ha... And basically over time, the things to get hacked became more and more from initial planned.. Ha.. So this is a short list of what i be doing... Replace main door and gate. Replace all doors. Replace all windows grills. Replace kitchen and 2 bedroom's windows. Replace Floor tiles of Living/Dining and all the rooms with homo tiles. Replace all tiles for 2 toilets and whole kitchen. Replace all lights. Replace aircon piping and aircon units. Relocate Storeroom. Rebuilt kitchen cabinet to U Shape. Build low wall to hide washing machine. L-box for living room and false ceiling for dining area and passageway. Built Wardrobe/dressing table in Master bed room. Add Fan for Living room. Rewiring for whole house. Well.. that should be about it. Ha.. Over time, we realised that the only thing we decide not to change is all the windows facing the corridor. Now once a while still wondering should we hack it.. Ha..
-
Reno @my Simei 4a Resale Flat
Hey Simon, Just found out my office cannot see flickr's pics.. Ha.. opp from yours.. Ha.. btw, did u notice how many times Henry went down to your pl during reno?
-
Reno @my Simei 4a Resale Flat
Guest Room 2
-
Reno @my Simei 4a Resale Flat
Master Bedroom Guest Room 1
-
Reno @my Simei 4a Resale Flat
Place after things are cleared out. Living/Dining Room Kitchen
-
Reno @my Simei 4a Resale Flat
Ha.. get a netbook and mobile broadband lah.. can check all the post anytime.. Ha..
-
Reno @my Simei 4a Resale Flat
your office cannot see the pics uploaded using other softwares?
-
Reno @my Simei 4a Resale Flat
Thanks Simon. Ha.. Yah..realise the layout as really similiar after i uploaded mine and visiting your blog.. HA.. at the moment all is still well.. would like if need any advice coz so many experts here.. HA.. tonite would update some more.. at the moment, is finishing up on the tiles only.
-
Reno @my Simei 4a Resale Flat
Thanks eugela. HA.. actually i go down to the hse alot more then Henry do.. he's very bz, find it hard to meet him also.. How's reno at your pl? peaceful?
-
Reno @my Simei 4a Resale Flat
Guestroom 1 Guestroom 2
-
Reno @my Simei 4a Resale Flat
Master Bedroom