Skip to content
View in the app

A better way to browse. Learn more.

RenoTalk.com ™

A full-screen app on your home screen with push notifications, badges and more.

To install this app on iOS and iPadOS
  1. Tap the Share icon in Safari
  2. Scroll the menu and tap Add to Home Screen.
  3. Tap Add in the top-right corner.
To install this app on Android
  1. Tap the 3-dot menu (⋮) in the top-right corner of the browser.
  2. Tap Add to Home screen or Install app.
  3. Confirm by tapping Install.

thirdrockdweller

Members
  • Joined

  • Last visited

Everything posted by thirdrockdweller

  1. Reno Day +23 (16-04-2010) Piping for sink/dishwasher
  2. Reno Day +23 (16-04-2010) False Ceiling, False Ceiling, False Ceiling Living room false ceiling is done! Kitchen false ceiling, checked! Passageway false ceiling, up! Another view (Towards the MBR)
  3. Ah, mystery solved. Asked my contractor about this. Our very nice contractor brought a truck load of marble tiles (more in the MBR) and had them all splayed out on the floor. Was wondering why there was so many. Clearly our tiny toilet didn't need that many. As he explained it, he had all tiles laid out so that he could pick, match and tag the tiles that will be eventually used. This was to ensure aesthetic consistency. He will haul the remaining tiles back. Wah, this is how the professionals do it. Very very detailed and methodical. :good:
  4. Hi mango88, Our ID is; I.D.+A 237 Alexandra Road, The Alexcier #07-02 Singapore 159929 +65 64796566 Ask for Frank Tang and their associated contractor is; Growth Builder Pte Ltd (same contact as above) Ask for Choo Man Wai Great and very creative ID. On the contractor side of things, solid workmanship and Mr. Choo is very meticulous.
  5. Thank you thank you
  6. Reno Day +20 (13-04-2010) False ceiling in progress; Living room Another view
  7. Reno Day +20 (13-04-2010) Aircon trunking completed; MBR Guest Room/Baby Room Study Dining/Living Area
  8. Aircon piping/trunking is up. Pics coming soon.
  9. Thank you thank you First appointment soon I see. Must be excited!
  10. Reno Day +18 (11-04-2010) MBR toilet - Door frame hacked. This is to accomodate a swing door. Wall and floor tiling for guest toilet done Another view
  11. Reno Day +18 (11-04-2010) Marble tiles that will be eventually used for the MBR toilet (Curiously, not sure why there are so many pieces here for a really tiny toilet) A close up of the marble (Again, sorry about the condition of the lighting. Flash photography kills details )
  12. Reno Day +18 (11-04-2010) More updates, more pics. Kitchen wall rebuilt A view of inside the kitchen Yet another view. Kinda difficult to convey the sense of spaciousness the kitchen has at the moment with a photograph. Don't think my photography is doing a good job at establishing a sense of scale. Anyway, once the cabinets and appliances are in, bye bye space, hello clutter.
  13. Reno Day +15 (08-04-2010) Some major demolition work done over the last couple of days; Wall outside kitchen hacked away Worker rebuilding a part of the kitchen wall Wall outside study room - hacked! More updates soon.
  14. KIV Kitchen Sink The wife and I are pretty set on buying this; Ikea's DOMSJÖ sink bowl (W62.4×D64.6, H22.9cm) We really like the farmhouse/lab sink look and the huge dimensions are a must (to fit an entire wok). Any suggestions for alternatives? No stainless steel though.
  15. New stuffs for the Kitchen Eubiq SH1 (1 m)
  16. New stuffs for the Kitchen Electrolux Hood Brandt Dishwasher VH-925XE1
  17. Reno Day +8 (01-04-2010) Nothing much to report today. Not much progress. Partial wall tiling of the guest toilet Hmm, the old mixer is still there Approval for the hacking of the study room and kitchen walls received. Work & hacking will resume on the 5th. Hopefully more interesting pics to post by then.
  18. Reno Day +7 (31-03-2010) Kitchen Same deal here. Grey, damped and dark Mess in the living room
  19. Reno Day +7 (31-03-2010) Cementing has begun; MBR Toilet Guest Toilet Everything's so grey and dark. Hard to imagine what the final product will look like at this point Floor tiles for the Guest Toilet
  20. Hi hcbing, Glad you like the renderings I did. Must admit, it was painstaking, although kinda helpful in the reno visualization process. The 3D was done all in Google Sketchup and rendered in Kerkythea, a free 3D renderer for the Mac. There's a little bit of a learning curve going the free software route but I think it was worth it. Made conveying what the wife and I wanted to the ID way way easier Do check out the forums on both sites (links embedded above). Plenty of tutorials and videos.
  21. Reno Day +5 (29-03-2010 / Hacking - Day 3) Kitchen Stuff done; Grille removed from the whole place Debris removed Hacking partially done - Still awaiting approval to hack kitchen and study room walls
  22. Reno Day +5 (29-03-2010 / Hacking - Day 3) Living Room Study (View from Outside) Dining
  23. Reno Day +5 (29-03-2010 / Hacking - Day 3) More pics of the demolition (Sorry about the quality of the pics. Forgot my camera and had to use the crummy camera on my phone ) MBR Toilet Guest Toilet Hallway (From the MBR) Entrance
  24. Hi! Definitely more coming

Account

Navigation

Search

Search

Configure browser push notifications

Chrome (Android)
  1. Tap the lock icon next to the address bar.
  2. Tap Permissions → Notifications.
  3. Adjust your preference.
Chrome (Desktop)
  1. Click the padlock icon in the address bar.
  2. Select Site settings.
  3. Find Notifications and adjust your preference.