Jump to content
Find Professionals    Deals    Get Quotations   Portfolios

sharene

Members
  • Content Count

    15
  • Joined

  • Last visited

Community Reputation

0 Neutral

About sharene

  • Rank
    Bronze Member

Previous Fields

  • Renovator Engaged
    Inspiration ID
  • Gender
    Female
  1. yup... looks strong for me when i on the tap...
  2. nope...they only provide free assembling. they will arrange 1 worker to assemble the toilet accessories in your presence, according to your instructions. i got the rainshower/toilet accessories fm ho kee...
  3. renovation as as 13th nov 2010 15litre ariston water heater at common toilet common toilet master bedroom toilet kitchen glass panel is up! now only left final painting, checking of defects and final wiring installation..
  4. will try to post more up next week when i go over. but the mirror is a sliding mirror inside the warerobe. wardrobe is fitting with 3 sliding doors of glass and aluminium. http://i443.photobucket.com/albums/qq156/s...yy/IMG_4557.jpg
  5. depending on the door material.. ours $360 per door
  6. renovation as at 11 nov 2010 curtains railings up http://i443.photobucket.com/albums/qq156/s.../Picture018.jpg Total of 5 doors up - fm door supplier Uncle Lor Seng http://i443.photobucket.com/albums/qq156/s.../Picture016.jpg only left tempered glass in kitchen to be up by this week and installation of toilet accessories this coming sat..and soon can do acid wash and 2nd painting with all the finally touch up!
  7. yup... renovations is fast renovation as at 5 nov 2010: living room mirrors half way up http://i443.photobucket.com/albums/qq156/s...yy/IMG_4601.jpg wardrobe mirror up http://i443.photobucket.com/albums/qq156/s...yy/IMG_4605.jpg tv console tempered glass up http://i443.photobucket.com/albums/qq156/s...yy/IMG_4604.jpg kitchen granite top up...pending for tempered glass only http://i443.photobucket.com/albums/qq156/s...yy/IMG_4599.jpg scheduled items for next week... 9th nov - installing of all bedroom/toilet doors 11/12th nov - remaining kitchen glass and living room mirror 13th nov - installation of toilet accessories
  8. ya..20k quoted with aluminium grills, including the one at service yard. actually alan have a standard package tat cost abt 12k, with i think 150m of grills(excluding service yard) cuz service yard and the rooms grills are different. service yard grills hve to be spray with colours approve by hdb. the package is written on the flyer tat they gave out at the carpark. didn't do windows cuz they say the rain wont come in...haha. but better to do grills, like much more safer to prevent any intruders
  9. yup..alan's renovation is very fast..now only waiting for the mirror and tempered glass which takes abt 10 days for it to arrive. i find master bedroom a bit small..so we only did a wardrobe and getting a new bedframe and side table fm seahorse. quotation is handwritten on a invoice, as alan was able to give us the price immediately based on our requirement....so hard for me to copy and paste.. but basically the quotation is for the items of the pic posted. of cuz excluding lights and air con. the sink/tap, hob and hood is inclusive of the quotation, but we did a slight top up for the hob and hood as we wanted a change of colour. the most expensive items are the mirrors in living room, tempered glass door in master bedroom toilet & kitchen and tempered glass for kitchen walls between the cabinets.
  10. renovation as of 31 oct 2010 mirror frame at dinning area http://i443.photobucket.com/albums/qq156/s...yy/IMG_4586.jpg master bedroom toilet cabinet http://i443.photobucket.com/albums/qq156/s...yy/IMG_4585.jpg shower screen at master bedroom toilet http://i443.photobucket.com/albums/qq156/s...yy/IMG_4577.jpg Living room http://i443.photobucket.com/albums/qq156/s...yy/IMG_4538.jpg tv console and feature wall http://i443.photobucket.com/albums/qq156/s...yy/IMG_4589.jpg kitchen cabinets http://i443.photobucket.com/albums/qq156/s...yy/IMG_4591.jpg kitchen tempered glass door http://i443.photobucket.com/albums/qq156/s...yy/IMG_4529.jpg walkway http://i443.photobucket.com/albums/qq156/s...yy/IMG_4549.jpg
  11. renovation works done as at 20/10/2010 -installing of false ceilings -lightings, sink, stove & hob delivered. curtain pelmet http://i443.photobucket.com/albums/qq156/s...y/Photo0105.jpg false ceiling http://i443.photobucket.com/albums/qq156/s...y/Photo0077.jpg http://i443.photobucket.com/albums/qq156/s...y/Photo0096.jpg http://i443.photobucket.com/albums/qq156/s...y/Photo0098.jpg http://i443.photobucket.com/albums/qq156/s...y/Photo0079.jpg quote within my budget of 20k
  12. 10th October 2010 – Confirmed Renovator ID and paid 20% deposit. 15th October 2010 – Confirmed Aircon system - Daikin System 4 by Gavin Care 16th October 2010 – Floor design layout is out. Selection of wall paints and cupboard laminates Aircon engineer came down to collect deposit and discuss tubing plans and take measurements. Went to Italu to select whole house lightings. Abt 20 lightings. 18th October 2010 - Gavin Care came to install Aircon. Mansory works in kitchen started and done up. Wiring started and done up too. Living Room http://i443.photobucket.com/albums/qq156/s...18_860865_n.jpg Service Yard http://i443.photobucket.com/albums/qq156/s...serviceyard.jpg Kitchen http://i443.photobucket.com/albums/qq156/s...HOME/fridge.jpg Bedroom 2 http://i443.photobucket.com/albums/qq156/s...ME/bedroom2.jpg
  13. ID: Inspiration ID PIC: Alan / Mr Toh Lightings: Italu Collection @ Balestier Aircon system: Daikin system 4 by Gavin Care Floor Plan
×