Jump to content
Find Professionals    Deals    Get Quotations   Portfolios

pckee

Members
  • Content Count

    90
  • Joined

  • Last visited

Everything posted by pckee

  1. Forgot to answer you about the cost. It cost me about $24K. That is including everything - Hacking, kitchen cabinet (25ft), Kitchen Silestone top (25ft), kitchen glass backing, toilet tiles (about $3.20 from Hafary), toilet Vanity with Silestone top (x1 at common toilet only), shower screens for toilets (fix panel only), doors for toilet, mirrors for toilet, water piping. I hope I did not miss any item. FYI, i only do the lower cabinet in kitechen, there is no top cabinet. Basically the cost highly depending on what kind of tiles and counter top you choose.
  2. Yes,I joined the bathroom at kitchen. It's not only make the bathroom look bigger also giving wall space to the kitchen. I see pic below and u know what I mean.
  3. My main door entrance is at my balcony area. Will do the dlooring and remove the glass door which separate the living room and balconey. Hope I answered your question.
  4. Hi...yes, my unit is connected to citigas. you can see the gas pipe on above picture where I show the kitchen. If older house do not have the connection, you can request to connect it at a fee.
  5. Bought 2 sets of Grohe bathroom accessories. Saw this last weekend at IMM $138 and giving 10% off the package price. Checked Bathroom warehouse, quoted $158 without discount. End up go back IMM 3rd floor which selling only Grohe products. Understand from the sales, purchase above $1K free Grohe bath liquid or something... Just sharing....not saying bathroom warehouse expensive, I bought few items there too. I went back exchange some items that is why check the price. Change item without any issue...good service.
  6. Kitchen wall plaster done....all corners of flooring patched up (hacked of previous tiles skirting)
  7. I not planning to do any false ceiling. Basically we are going to do up the kitchen, toilets, flooring and wardrope in master room. Will create a additional door to close up the original main door area. So I will have another storage area.
  8. I did not engage contractor. the quote is included in my quotation from my ID. Let me know if you want to know the price.
  9. Went up today to see see. Some tiles and toilet work is done. original common toilet door sealed. A view of common toilet
  10. Thanks for dropping by. I only have 2 entrance and cannot seal off the older one cos that door is lead to stair. The door at balcony only can access to lift.
  11. Sorry for late reply. 121sqm....you are right...near NYP
  12. Current Status. Balcony view from main door entrance and from living hall.
  13. Floor plan. Due to lift upgrade, i got 2 main door. The new door is at the balcony. Original floor plan does not have the door there so i copy and paste the door myself...hehe
×